Name | Project | Type | Compare |
---|---|---|---|
Örebro-Vivalla | JUST PEPP | PED Relevant Case Study | Compare |
Tiurberget, Kongsvinger | JUST PEPP | PED Relevant Case Study | Compare |
Texel | JUST PEPP | PED Relevant Case Study | Compare |
Hällefors, Sweden | JUST PEPP | PED Relevant Case Study | Compare |
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona | OPEN4CEC | PED Lab | Compare |
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab | OPEN4CEC | PED Lab | Compare |
Pamplona | OPEN4CEC | PED Lab | Uncompare |
Trondheim, Svartlamon | OPEN4CEC | PED Lab | Compare |
Savona, The University of Genova, Savona Campus | OPEN4CEC | PED Lab | Compare |
Torres Vedras, Encosta de São Vicente | COPPER | PED Lab | Compare |
Title | Salzburg, Gneis district | NyBy – Ny Flyplass (New City – New Airport) | Ankara, Çamlık District | Amsterdam, Buiksloterham PED | Pamplona |
---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | |||||
A1P001: Name of the PED case study / PED Lab | Salzburg, Gneis district | NyBy – Ny Flyplass (New City – New Airport) | Ankara, Çamlık District | Amsterdam, Buiksloterham PED | Pamplona |
A1P002: Map / aerial view / photos / graphic details / leaflet | |||||
A1P002: Map / aerial view / photos / graphic details / leaflet | |||||
A1P003: Categorisation of the PED site | |||||
PED case study ?District-level project with a high level of aspiration in terms of energy efficiency, energy flexibility, and energy production. The project has to address most of the aspects listed in the JPI UE PED Framework Definition, including the ambition to achieve annual energy positive balance "Positive Energy Districts are energy-efficient and energy-flexible urban areas or groups of connected buildings that produce net zero greenhouse gas emissions and actively manage an annual local or regional surplus production of renewable energy. They require integration of different systems and infrastructures and interaction between buildings, the users and the regional energy, mobility and ICT systems while securing the energy supply and a good life for all in line with social, economic and environmental sustainability." | yes | yes | yes | yes | no |
PED relevant case study ?District-level project with a high level of aspiration in terms of energy efficiency, energy flexibility, and energy production. The project does not necessarily have to meet annual energy positive balance, but it has to address some aspects listed in the JPI UE PED Framework Definition (“Positive Energy Districts are energy-efficient and energy-flexible urban areas or groups of connected buildings that produce net zero greenhouse gas emissions and actively manage an annual local or regional surplus production of renewable energy. They require integration of different systems and infrastructures and interaction between buildings, the users, and the regional energy, mobility, and ICT systems while securing the energy supply and a good life for all in line with social, economic, and environmental sustainability." | no | no | yes | no | no |
PED Lab. ?PED-Lab definition regarding the Strategic Energy Technology Plan (SET-Plan Action 3.2): PED Labs will be pilot actions that provide opportunities to experiment with the planning and deployment of PEDs, as well as provide seeding ground for new ideas, solutions, and services to develop. PED Labs will follow an integrative approach, including technology, spatial, regulatory, financial, legal, social, and economic perspectives. | no | no | no | no | yes |
A1P004: Targets of the PED case study / PED Lab | |||||
Climate neutrality ?Climate neutrality means that, on a periodic basis, the carbon dioxide emissions within the limits of the district are compensated with the exported energy or by carbon capture. | yes | yes | yes | yes | yes |
Annual energy surplus ?The total annual energy balance is positive; therefore, the area will deliver, on average, an energy surplus to be shared with other urban or peri-urban zones. | yes | no | yes | yes | no |
Energy community ?The energy community refers to a wide range of collective energy actions that involve citizens’ participation in the energy system. Energy communities can be understood as a way to ‘organize’ collective energy actions around open, democratic participation and governance and the provision of benefits for the members or the local community | yes | no | yes | yes | yes |
Circularity ?circular systems employ reuse, sharing, repair, refurbishment, remanufacturing and recycling to create a closed‐loop system, minimizing the use of resource inputs and the creation of waste, pollution and carbon emissions. In the case of PED, the revalorization of waste (such as residues from the different sectors) for the energy production is prioritized, but many other pathways could be taken, considering the cycle of water, food, etc | no | no | no | yes | no |
Air quality and urban comfort ?The objective of improving air quality is to reduce the concentration of the five main pollutants: O3, NO2, SO2, PM2.5 and PM10 | yes | no | no | no | no |
Electrification ?electrification is the process in which the supply of any energy needs of a district and/or city, such as the heating needs or the mobility sector,
are supplied by electricity-driven technologies | no | no | yes | yes | no |
Net-zero energy cost ?the amount of money the utility pays the building owner for the energy the building exports to the grid is at least equal to the amount the owner pays the utility for the energy services and energy used over the year | no | no | yes | no | no |
Net-zero emission ?a net-zero-emissions building produces at least as much emissions-free renewable energy as it uses from emissions-producing energy sources | no | yes | yes | yes | no |
Self-sufficiency (energy autonomous) ?self‐sufficiency means that within a year, the district will never import energy from outside the boundaries (e.g. consume electricity or gas from the grids) | no | no | no | no | no |
Maximise self-sufficiency ?Maximizing self‐sufficiency means that within a year, the district is allowed to import energy from outside the boundaries; however, the energy content of the imported energy products to the district should be less than (or equal to) the energy content of the energy products exported from the district. Thus, the net imports is zero or negative | no | no | yes | no | no |
Other | no | yes | no | no | no |
Other (A1P004) | (not specified) | Energy efficient; Sustainable neighbourhood; Social aspects/affordability | (not specified) | (not specified) | (not specified) |
A1P005: Phase of the PED case study / PED Lab | |||||
A1P005: Project Phase of your case study/PED Lab ?Planning stage: Case Study or Lab is being designed
Implementation stage: Case Study or LAB is being deployed
Completed: Case Study or LAB is already finalized
In operation. Case Study or LAB is being used | Completed | Planning Phase | Planning Phase | Implementation Phase | Implementation Phase |
A1P006: Start Date | |||||
A1P006: Start date | 01/20 | 01/20 | 10/22 | 11/19 | 06/24 |
A1P007: End Date | |||||
A1P007: End date | 01/24 | (not specified) | 09/25 | 10/25 | 07/28 |
A1P008: Reference Project | |||||
A1P008: Reference Project | |||||
A1P009: Data availability | |||||
A1P009: Data availability |
| (not specified) |
|
| (not specified) |
A1P009: Other | (not specified) | (not specified) | (not specified) | https://smartcity-atelier.eu/about/lighthouse-cities/amsterdam/ | (not specified) |
A1P010: Sources ?Any publication, link to website, deliverable referring to the PED/PED Lab | |||||
Any publication, link to website, deliverable referring to the PED/PED Lab | |||||
A1P011: Geographic coordinates ?Geographic coordinate system: latitude and longitude | |||||
X Coordinate (longitude): | 13.041216 | 14.363169 | 32.795369 | 4.9041 | -1.64323 |
Y Coordinate (latitude): | 47.771019 | 67.271954 | 39.881812 | 52.3676 | 42.81687 |
A1P012: Country | |||||
A1P012: Country | Austria | Norway | Turkey | Netherlands | Spain |
A1P013: City | |||||
A1P013: City | Salzburg | Bodø | Ankara | Amsterdam | Pamplona |
A1P014: Climate Zone (Köppen Geiger classification) | |||||
A1P014: Climate Zone (Köppen Geiger classification). ?The most widely used climate classification system. It divides climates into five main climate groups based on seasonal precipitation and temperature patterns.
Af: Tropical‐Rainforest
Am: Tropical‐Monsoon
Aw: Tropical‐Savanna
BSh: Arid‐Steppe‐Hot
BSk: Arid‐Steppe‐Cold
BWh: Arid‐Desert‐Hot
BWk: Arid‐Desert‐Cold
Cfa: Temperate‐Without_dry_season‐Hot _ Summer
Cfb: Temperate‐Without_dry_season‐
Warm_Summer
Cfc: Temperate‐Without_dry_season‐Cold_Summer
Csa: Temperate‐Dry_Summer‐Hot_Summer
Csb: Temperate‐Dry_Summer‐Warm_Summer
Cwa: Temperate‐Dry_Winter‐Hot_Summer
Cwb: Temperate‐Dry_Winter‐Warm_Summer
Dfa: Cold‐Without_dry_season‐Very_Cold_Winter
Dfb: Cold‐Without_dry_season‐Warm_Summer
Dfc: Cold‐Without_dry_season‐Cold_Summer
Dsa: Cold‐Dry_Summer‐Hot_Summer
Dsb: Cold‐Dry_Summer‐Warm_Summer
Dsc: Cold‐Dry_Summer‐Cold_Summer
Dsd: Cold‐Dry_Summer‐Very_Cold_Winter
Dwa: Cold‐Dry_Winter‐Hot_Summer
Dwb: Cold‐Dry_Winter‐Warm_Summer
Dwc: Cold‐Dry_Winter‐Cold_Summer
Dwd: Cold‐Dry_Winter‐Very_Cold_Winter
EF: Polar‐Frost
ET: Polar‐Tundra | Dfb | Dfc | Dsb | Cfb | Cfb |
A1P015: District boundary | |||||
A1P015: District boundary ?See individual answer options’ definitions below:
Functional: buildings are not close to each other, but they are interconnected, thanks to a gas, electric, or heating network.
Geographic: the boundaries are delimited by spatial-physical limits, including delineated buildings, sites, and infrastructure.
Off-Grid: The district is self-sufficient or autonomous, which means it is not connected to any utility grids (e.g., electricity, water, gas, and sewer networks). This is advantageous in isolated locations where normal utilities cannot reach them and is attractive to those who want to reduce environmental impact and the cost of living.
Virtual: If energy demand is covered by a generation unit (e.g., a wind turbine), which is typically shared with other consumption points and located outside the geographical boundaries of the district, then it could be considered a virtual boundary
Other ‐ specify: N/A | Geographic | (not specified) | Geographic | Functional | Geographic |
Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P016: Ownership of the case study/PED Lab | |||||
A1P016: Ownership of the case study/PED Lab: ?Public: Ownership of an industry, asset, or enterprise by the state or a public body representing a community as opposed to an individual or private party. Private: The fact of being owned by a private individual or organization. Mixed: Ownership of the assets within the PED by both public and private entities. | Mixed | Public | Private | Mixed | Mixed |
A1P017: Ownership of the land / physical infrastructure | |||||
A1P017: Ownership of the land / physical infrastructure: | Single Owner | Single Owner | Multiple Owners | Multiple Owners | Multiple Owners |
A1P018: Number of buildings in PED | |||||
A1P018: Number of buildings in PED | 17 | (not specified) | 257 | 60 | (not specified) |
A1P019: Conditioned space ?Closed building area, where there is intentional
control of the space thermal conditions within defined limits by using natural, electrical, or mechanical means | |||||
A1P019: Conditioned space | 199762 m² | (not specified) | 22600 m² | 28500 m² | (not specified) |
A1P020: Total ground area ?The ground space (in m2) including green areas and streets within the defined physical boundaries. | |||||
A1P020: Total ground area | (not specified) | 3400000 m² | 50800 m² | (not specified) | 23550000 m² |
A1P021: Floor area ratio: Conditioned space / total ground area | |||||
A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 0 | 0 | 0 | 0 |
A1P022: Financial schemes | |||||
A1P022a: Financing - PRIVATE - Real estate | no | no | no | yes | no |
A1P022a: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no |
A1P022b: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022c: Financing - PRIVATE - Other | no | no | no | no | no |
A1P022c: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022d: Financing - PUBLIC - EU structural funding | no | no | no | no | no |
A1P022d: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022e: Financing - PUBLIC - National funding | no | no | no | no | no |
A1P022e: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022f: Financing - PUBLIC - Regional funding | no | no | no | no | no |
A1P022f: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022g: Financing - PUBLIC - Municipal funding | no | no | no | no | yes |
A1P022g: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022h: Financing - PUBLIC - Other | no | no | no | no | no |
A1P022h: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022i: Financing - RESEARCH FUNDING - EU | yes | no | yes | yes | no |
A1P022i: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022j: Financing - RESEARCH FUNDING - National | no | no | yes | no | no |
A1P022j: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no |
A1P022k: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no |
A1P022l: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P023: Economic Targets | |||||
A1P023: Economic Targets |
| (not specified) |
|
| (not specified) |
A1P023: Other | Boosting social cooperation and social aid | (not specified) | (not specified) | (not specified) | (not specified) |
A1P024: More comments: | |||||
A1P024: More comments: | (not specified) | (not specified) | The urban morphology of Çamlık District differs in several ways, compared with the typical urban fabric in Türkiye, along with the capital city of Ankara. The houses on the site are composed of three-story attached single-housing units with multiple rows, creating a total of 257 housing units in total. Low-rise buildings coupled with suitably oriented rooftop surfaces brings about significant advantages in the site. Dense greenery in the site also results in reduced cooling energy demand in the buildings. | (not specified) | (not specified) |
A1P025: Estimated PED case study / PED LAB costs | |||||
A1P025: Estimated PED case study / PED LAB costs | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
Contact person for general enquiries | |||||
A1P026: Name ?Name of the person who filled out the form | Abel Magyari | Christoph Gollner | Prof. Dr. İpek Gürsel DİNO | Omar Shafqat | Oscar Puyal LAtorre |
A1P027: Organization ?Organization of the person who filled out the form (e.g., Municipality of, University of…) | ABUD | FFG | Middle East Technical University | Amsterdam University of Applied Sciences | Endef Engineering SL |
A1P028: Affiliation ?Affiliation of the person who filled out the form | Research Center / University | Other | Research Center / University | Research Center / University | SME / Industry |
A1P028: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P029: Email ?Contact e-mail of the person who filled out the form | magyari.abel@abud.hu | christoph.gollner@ffg.at | ipekg@metu.edu.tr | o.shafqat@hva.nl | oscar.puyal@endef.com |
Contact person for other special topics | |||||
A1P030: Name ?Name of the project manager of the site | Strassl Ingeborg | (not specified) | Assoc. Prof. Onur Taylan | Omar Shafqat | (not specified) |
A1P031: Email ?Contact e-mail of the project manager of the site | inge.strassl@salzburg.gv.at | (not specified) | otaylan@metu.edu.tr | o.shafqat@hva.nl | (not specified) |
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes |
A2P001: Fields of application | |||||
A2P001: Fields of application ?Energy efficiency simply means using less energy to perform the same task – that is, eliminating energy waste Energy flexibility In the electricity system, flexibility helps to maintain or restore the stability of a system, because only by reacting flexibly to constantly changing conditions - fluctuating electricity consumption, fluctuating electricity generation – the system is balanced. Energy production In terms of Renewable Energy production. E-mobility refers to clean and efficient transport, using electric vehicles, powered either by batteries or by hydrogen fuel cells. Digital technologies are set to make energy systems around the world more connected, intelligent, efficient, reliable and sustainable. Stunning advances in data, analytics and connectivity are enabling a range of new digital applications such as smart appliances, shared mobility, and 3D printing. Digitalized energy systems in the future may be able to identify who needs energy and deliver it at the right time, in the right place and at the lowest cost Water use refers to water actually used by end users (e.g. households, services, agriculture, industry) within a territory for a specific purpose such as domestic use, irrigation or industrial processing. Waste Management The new agenda for waste management thus focuses upon the development of more appropriate, sustainable definitions so that what is now commonly perceived as being waste will in fact be increasingly seen as resource-rich, |
|
|
|
|
|
A2P001: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P002: Tools/strategies/methods applied for each of the above-selected fields | |||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | - Dynamic district, and building scale energy modelling - Microclimate modelling - Klimaaktiv certification system - Energy community - Flexibility with shared heating and electricity systems | (not specified) | The energy consumption and efficiency of the energy model of Çamlık Site, created using EnergyPlus software, have been evaluated under the scenarios specified below. At each stage, a new system was incorporated to explore the potential of the area becoming a PED. In this context, four scenarios were created to compare different energy scenarios for the Ankara pilot area and to observe the impact of the included systems on energy efficiency: V_base; V_ER; V_ER,HP; V_ER,HP,PV. The basic scenario (V_base) was created using the current state without any improvement to the building envelope. This scenario was developed to determine the annual energy needs of the entire site without any intervention and serves as a reference point for the other developed models. The second scenario (V_ER) was created to improve the building envelopes of all residential units in the area, altering the U-values according to Türkiye's current building standards (TS-825). The third scenario (V_ER,HP) primarily includes a heat pump model that can use electrical energy to produce higher thermal energy and is added on top of the improvements in the second scenario. Finally, the V_ER,HP,PV scenario combines building envelope improvements, the heat pump, and the solar PV system. | City vision, Innovation Ateliers | (not specified) |
A2P003: Application of ISO52000 | |||||
A2P003: Application of ISO52000 | Yes | (not specified) | Yes | Yes | (not specified) |
A2P004: Appliances included in the calculation of the energy balance | |||||
A2P004: Appliances included in the calculation of the energy balance | No | (not specified) | Yes | No | (not specified) |
A2P005: Mobility included in the calculation of the energy balance | |||||
A2P005: Mobility included in the calculation of the energy balance | No | (not specified) | No | No | (not specified) |
A2P006: Description of how mobility is included (or not included) in the calculation | |||||
A2P006: Description of how mobility is included (or not included) in the calculation | (not specified) | (not specified) | Mobility is not included in the calculations. | (not specified) | (not specified) |
A2P007: Annual energy demand in buildings / Thermal demand | |||||
A2P007: Annual energy demand in buildings / Thermal demand | (not specified) | (not specified) | 3.446 GWh/annum | (not specified) | (not specified) |
A2P008: Annual energy demand in buildings / Electric Demand | |||||
A2P008: Annual energy demand in buildings / Electric Demand | (not specified) | (not specified) | 0.528 GWh/annum | (not specified) | (not specified) |
A2P009: Annual energy demand for e-mobility | |||||
A2P009: Annual energy demand for e-mobility | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P010: Annual energy demand for urban infrastructure | |||||
A2P010: Annual energy demand for urban infrastructure | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Annual renewable electricity production on-site during target year | |||||
A2P011: PV | yes | no | yes | yes | no |
A2P011: PV - specify production in GWh/annum | 0.7770664 GWh/annum | (not specified) | 3.4240 GWh/annum | (not specified) | (not specified) |
A2P011: Wind | no | no | no | no | no |
A2P011: Wind - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Hydro | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Biomass_el | no | no | no | yes | no |
A2P011: Biomass_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Biomass_peat_el | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: PVT_el | no | no | no | no | no |
A2P011: PVT_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Other | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Annual renewable thermal production on-site during target year | |||||
A2P012: Geothermal | yes | no | no | yes | no |
A2P012 - Geothermal: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Solar Thermal | no | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_heat | no | no | no | yes | no |
A2P012 - Biomass_heat: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Waste heat+HP | no | no | no | yes | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_peat_heat | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: PVT_th | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_firewood_th | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Other | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P013: Renewable resources on-site - Additional notes | |||||
A2P013: Renewable resources on-site - Additional notes | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P014: Annual energy use | |||||
A2P014: Annual energy use | 0.819016 GWh/annum | (not specified) | 3.976 GWh/annum | (not specified) | (not specified) |
A2P015: Annual energy delivered | |||||
A2P015: Annual energy delivered | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P016: Annual non-renewable electricity production on-site during target year | |||||
A2P016: Annual non-renewable electricity production on-site during target year | -1 GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Annual non-renewable thermal production on-site during target year | |||||
A2P017: Gas | no | no | yes | yes | no |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Coal | no | no | no | yes | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Oil | no | no | no | yes | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Other | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Annual renewable electricity imports from outside the boundary during target year | |||||
A2P018: PV | no | no | no | yes | no |
A2P018 - PV: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Wind | no | no | no | yes | no |
A2P018 - Wind: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Hydro | no | no | no | yes | no |
A2P018 - Hydro: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Biomass_el | no | no | no | yes | no |
A2P018 - Biomass_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Biomass_peat_el | no | no | no | yes | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: PVT_el | no | no | no | yes | no |
A2P018 - PVT_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Other | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Annual renewable thermal imports from outside the boundary during target year | |||||
A2P019: Geothermal | no | no | no | yes | no |
A2P019 Geothermal: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Solar Thermal | no | no | no | yes | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_heat | no | no | no | yes | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Waste heat+HP | no | no | no | yes | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_peat_heat | no | no | no | yes | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: PVT_th | no | no | no | yes | no |
A2P019 PVT_th: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_firewood_th | no | no | no | yes | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Other | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P020: Share of RES on-site / RES outside the boundary | |||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | |||||
A2P021: GHG-balance calculated for the PED | (not specified) | (not specified) | (not specified) | 250 tCO2/annum | (not specified) |
A2P022: KPIs related to the PED case study / PED Lab | |||||
A2P022: Safety & Security | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Health | CO2) levels, Predicted Mean Vote,Predicted Percentage of Dissatisfied, Temperature, Relative Humidity, Illuminance, Daylight factor, Sound pressure levels | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Education | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Mobility | (not specified) | Mode of transport; Access to public transport | (not specified) | (not specified) | (not specified) |
A2P022: Energy | Non-renewable primary energy balance, Renewable energy ratio, Grid Purchase factor, Load cover factor/Self-generation, Supply cover factor/Self-consumption, Net energy/Net power, Peak delivered/exported power, Connection capacity credit, Total greenhouse gas emissions | Energy efficiency in buildings; Net energy need; Gross energy need; Total energy need | (not specified) | (not specified) | (not specified) |
A2P022: Water | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Economic development | Investment costs, Share of investments covered by grants, Maintenance-related costs, Requirement-related costs, Operation-related costs, Other costs, Net Present Value, Internal Rate of Return, Economic Value Added, Payback Period, nZEB Cost Comparison | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Housing and Community | Access to services, Affordability of energy, Affordability of housing, Democratic legitimacy, Living conditions, Social cohesion, Personal safety, Energy consciousness | Delivery and proximity to amenities | (not specified) | (not specified) | Number of people interested in participating in an energy community |
A2P022: Waste | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Other | (not specified) | GHG emissions; Power/load; Life cycle cost (LCC); Demographic needs and consultation plan; Public Space | (not specified) | (not specified) | (not specified) |
A2P023: Technological Solutions / Innovations - Energy Generation | |||||
A2P023: Photovoltaics | yes | no | yes | yes | yes |
A2P023: Solar thermal collectors | no | yes | no | no | no |
A2P023: Wind Turbines | no | no | no | no | no |
A2P023: Geothermal energy system | yes | yes | no | yes | no |
A2P023: Waste heat recovery | no | yes | no | yes | no |
A2P023: Waste to energy | no | no | no | yes | no |
A2P023: Polygeneration | no | no | no | no | no |
A2P023: Co-generation | no | no | no | no | no |
A2P023: Heat Pump | no | yes | yes | yes | no |
A2P023: Hydrogen | no | no | no | no | no |
A2P023: Hydropower plant | no | no | no | no | no |
A2P023: Biomass | no | no | no | yes | no |
A2P023: Biogas | no | no | no | yes | no |
A2P023: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P024: Technological Solutions / Innovations - Energy Flexibility | |||||
A2P024: A2P024: Information and Communication Technologies (ICT) | no | no | no | yes | no |
A2P024: Energy management system | yes | no | no | yes | no |
A2P024: Demand-side management | yes | no | no | yes | no |
A2P024: Smart electricity grid | yes | no | no | yes | no |
A2P024: Thermal Storage | no | no | no | yes | no |
A2P024: Electric Storage | no | no | no | yes | no |
A2P024: District Heating and Cooling | no | yes | no | yes | no |
A2P024: Smart metering and demand-responsive control systems | no | no | no | yes | yes |
A2P024: P2P – buildings | yes | no | no | yes | no |
A2P024: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P025: Technological Solutions / Innovations - Energy Efficiency | |||||
A2P025: Deep Retrofitting | no | no | yes | yes | no |
A2P025: Energy efficiency measures in historic buildings | no | no | no | yes | no |
A2P025: High-performance new buildings | yes | no | no | yes | no |
A2P025: Smart Public infrastructure (e.g. smart lighting) | no | no | no | yes | no |
A2P025: Urban data platforms | no | no | no | yes | no |
A2P025: Mobile applications for citizens | no | no | no | yes | no |
A2P025: Building services (HVAC & Lighting) | yes | no | yes | yes | no |
A2P025: Smart irrigation | no | no | no | yes | no |
A2P025: Digital tracking for waste disposal | no | no | no | yes | no |
A2P025: Smart surveillance | no | no | no | no | yes |
A2P025: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P026: Technological Solutions / Innovations - Mobility | |||||
A2P026: Efficiency of vehicles (public and/or private) | no | no | no | yes | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | yes | no | no | yes | no |
A2P026: e-Mobility | yes | no | no | yes | no |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | yes | no |
A2P026: Car-free area | no | no | no | yes | no |
A2P026: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P027: Mobility strategies - Additional notes | |||||
A2P027: Mobility strategies - Additional notes | Shared mobility: a mobility point will be implemented and ensure the flexible use of different mobility services. | (not specified) | (not specified) | (not specified) | (not specified) |
A2P028: Energy efficiency certificates | |||||
A2P028: Energy efficiency certificates | Yes | (not specified) | No | (not specified) | (not specified) |
A2P028: If yes, please specify and/or enter notes | Energy Performance Certificate | (not specified) | (not specified) | (not specified) | (not specified) |
A2P029: Any other building / district certificates | |||||
A2P029: Any other building / district certificates | Yes | (not specified) | No | (not specified) | (not specified) |
A2P029: If yes, please specify and/or enter notes | Klimaaktiv certificate, Greenpass certificate | (not specified) | (not specified) | (not specified) | (not specified) |
A3P001: Relevant city /national strategy | |||||
A3P001: Relevant city /national strategy | (not specified) | (not specified) |
|
| (not specified) |
A3P002: Quantitative targets included in the city / national strategy | |||||
A3P002: Quantitative targets included in the city / national strategy | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P003: Strategies towards decarbonization of the gas grid | |||||
A3P003: Strategies towards decarbonization of the gas grid |
| (not specified) |
|
| (not specified) |
A3P003: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P004: Identification of needs and priorities | |||||
A3P004: Identification of needs and priorities | (not specified) | (not specified) | According to the model developed for the district, the electrification of heating and cooling is necessary with heat pumps. Rooftop photovoltaic panels also have the potential for renewable energy generation. Through net-metering practices, the district is expected to reach energy positivity through this scenario. | (not specified) | (not specified) |
A3P005: Sustainable behaviour | |||||
A3P005: Sustainable behaviour | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P006: Economic strategies | |||||
A3P006: Economic strategies |
| (not specified) | (not specified) |
| (not specified) |
A3P006: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P007: Social models | |||||
A3P007: Social models |
|
|
|
|
|
A3P007: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P008: Integrated urban strategies | |||||
A3P008: Integrated urban strategies |
| (not specified) |
|
| (not specified) |
A3P008: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P009: Environmental strategies | |||||
A3P009: Environmental strategies |
| (not specified) |
|
|
|
A3P009: Other | (not specified) | (not specified) | Energy Positive, Low Emission Zone | (not specified) | (not specified) |
A3P010: Legal / Regulatory aspects | |||||
A3P010: Legal / Regulatory aspects | (not specified) | (not specified) | (not specified) | Regulatory sandbox | (not specified) |
B1P001: PED/PED relevant concept definition | |||||
B1P001: PED/PED relevant concept definition | (not specified) | (not specified) | Çamlık District, unlike many other districts in Ankara, has a specific urban morphology that draws near the other pilot zones considered by the partners of PED-ACT. The site has three-storey single housing units, along with a fair amount of greenery around. Furthermore, the roof areas enable large amounts of PV installment, which results in higher amounts of local renewable energy potential. Therefore, the district is a good fit for PED development. | Functional PED | (not specified) |
B1P002: Motivation behind PED/PED relevant project development | |||||
B1P002: Motivation behind PED/PED relevant project development | (not specified) | (not specified) | PED-ACT project. | Brown field development of a former industrial neighbourhood into a low-carbon, smart Positive Energy District with mixed uses. | (not specified) |
B1P003: Environment of the case study area | |||||
B2P003: Environment of the case study area | Suburban area | Suburban area | Suburban area | Urban area | (not specified) |
B1P004: Type of district | |||||
B2P004: Type of district |
|
|
|
| (not specified) |
B1P005: Case Study Context | |||||
B1P005: Case Study Context |
|
|
|
| (not specified) |
B1P006: Year of construction | |||||
B1P006: Year of construction | 2024 | (not specified) | 1986 | (not specified) | (not specified) |
B1P007: District population before intervention - Residential | |||||
B1P007: District population before intervention - Residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P008: District population after intervention - Residential | |||||
B1P008: District population after intervention - Residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P009: District population before intervention - Non-residential | |||||
B1P009: District population before intervention - Non-residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P010: District population after intervention - Non-residential | |||||
B1P010: District population after intervention - Non-residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P011: Population density before intervention | |||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 |
B1P012: Population density after intervention | |||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0 | 0 |
B1P013: Building and Land Use before intervention | |||||
B1P013: Residential | no | no | yes | no | no |
B1P013 - Residential: Specify the sqm | (not specified) | (not specified) | 50800 m² | (not specified) | (not specified) |
B1P013: Office | no | no | no | no | no |
B1P013 - Office: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Industry and Utility | no | no | no | yes | no |
B1P013 - Industry and Utility: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Commercial | no | no | no | no | no |
B1P013 - Commercial: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Institutional | no | no | no | no | no |
B1P013 - Institutional: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Natural areas | yes | no | no | no | no |
B1P013 - Natural areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Recreational | no | no | no | no | no |
B1P013 - Recreational: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Dismissed areas | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Other | no | no | no | no | no |
B1P013 - Other: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Building and Land Use after intervention | |||||
B1P014: Residential | yes | yes | yes | yes | no |
B1P014 - Residential: Specify the sqm | (not specified) | (not specified) | 50800 m² | (not specified) | (not specified) |
B1P014: Office | no | no | no | yes | no |
B1P014 - Office: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Industry and Utility | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Commercial | no | no | no | yes | no |
B1P014 - Commercial: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Institutional | no | no | no | no | no |
B1P014 - Institutional: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Natural areas | yes | no | no | no | no |
B1P014 - Natural areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Recreational | no | no | no | yes | no |
B1P014 - Recreational: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Dismissed areas | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Other | no | yes | no | no | no |
B1P014 - Other: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P001: PED Lab concept definition | |||||
B2P001: PED Lab concept definition | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P002: Installation life time | |||||
B2P002: Installation life time | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P003: Scale of action | |||||
B2P003: Scale | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P004: Operator of the installation | |||||
B2P004: Operator of the installation | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P006: Circular Economy Approach | |||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P006: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P007: Motivation for developing the PED Lab | |||||
B2P007: Motivation for developing the PED Lab | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P007: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P008: Lead partner that manages the PED Lab | |||||
B2P008: Lead partner that manages the PED Lab | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P008: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P009: Collaborative partners that participate in the PED Lab | |||||
B2P009: Collaborative partners that participate in the PED Lab | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P009: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P010: Synergies between the fields of activities | |||||
B2P010: Synergies between the fields of activities | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P011: Available facilities to test urban configurations in PED Lab | |||||
B2P011: Available facilities to test urban configurations in PED Lab | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P011: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P012: Incubation capacities of PED Lab | |||||
B2P012: Incubation capacities of PED Lab | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P013: Availability of the facilities for external people | |||||
B2P013: Availability of the facilities for external people | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P014: Monitoring measures | |||||
B2P014: Monitoring measures | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P015: Key Performance indicators | |||||
B2P015: Key Performance indicators | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P016: Execution of operations | |||||
B2P016: Execution of operations | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P017: Capacities | |||||
B2P017: Capacities | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P018: Relations with stakeholders | |||||
B2P018: Relations with stakeholders | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P019: Available tools | |||||
B2P019: Available tools | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P019: Available tools | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P020: External accessibility | |||||
B2P020: External accessibility | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P001: Unlocking Factors | |||||
C1P001: Recent technological improvements for on-site RES production | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 1 - Unimportant |
C1P001: Energy Communities, P2P, Prosumers concepts | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P001: Storage systems and E-mobility market penetration | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P001: Decreasing costs of innovative materials | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 2 - Slightly important |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 3 - Moderately important |
C1P001: The ability to predict Multiple Benefits | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant |
C1P001: The ability to predict the distribution of benefits and impacts | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 5 - Very important |
C1P001: Social acceptance (top-down) | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 3 - Moderately important |
C1P001: Presence of integrated urban strategies and plans | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 2 - Slightly important |
C1P001: Multidisciplinary approaches available for systemic integration | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 4 - Important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 2 - Slightly important |
C1P001: Availability of RES on site (Local RES) | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P001: Any other UNLOCKING FACTORS (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P002: Driving Factors | |||||
C1P002: Climate Change adaptation need | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 3 - Moderately important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 5 - Very important |
C1P002: Rapid urbanization trend and need of urban expansions | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant |
C1P002: Urban re-development of existing built environment | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant |
C1P002: Economic growth need | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important |
C1P002: Territorial and market attractiveness | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant |
C1P002: Energy autonomy/independence | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant |
C1P002: Any other DRIVING FACTOR | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P002: Any other DRIVING FACTOR (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P003: Administrative barriers | |||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 3 - Moderately important |
C1P003: Lack of good cooperation and acceptance among partners | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P003: Lack of public participation | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 4 - Important |
C1P003: Lack of institutions/mechanisms to disseminate information | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important |
C1P003:Long and complex procedures for authorization of project activities | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P003: Complicated and non-comprehensive public procurement | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P003: Fragmented and or complex ownership structure | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant |
C1P003: Lack of internal capacities to support energy transition | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P003: Any other Administrative BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P003: Any other Administrative BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P004: Policy barriers | |||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 2 - Slightly important |
C1P004: Lacking or fragmented local political commitment and support on the long term | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P004: Lack of Cooperation & support between national-regional-local entities | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P004: Any other Political BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P005: Legal and Regulatory barriers | |||||
C1P005: Inadequate regulations for new technologies | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P005: Regulatory instability | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P005: Non-effective regulations | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 3 - Moderately important |
C1P005: Unfavorable local regulations for innovative technologies | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 2 - Slightly important |
C1P005: Building code and land-use planning hindering innovative technologies | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P005: Insufficient or insecure financial incentives | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 2 - Slightly important |
C1P005: Shortage of proven and tested solutions and examples | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 2 - Slightly important |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P005: Any other Legal and Regulatory BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P006: Environmental barriers | |||||
C1P006: Environmental barriers | (not specified) | (not specified) | - Climate Variability: 5 - Topographical Constraints: 4 - Sunlight Availability: 5 - Air and Water Pollution: 2 - Water Scarcity: 1 - Environmental Regulations: 3 - Zoning Restrictions: 2 - Natural Disasters: 1 | (not specified) | (not specified) |
C1P007: Technical barriers | |||||
C1P007: Lack of skilled and trained personnel | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important |
C1P007: Deficient planning | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 5 - Very important |
C1P007: Retrofitting work in dwellings in occupied state | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant |
C1P007: Lack of well-defined process | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P007: Inaccuracy in energy modelling and simulation | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P007: Lack/cost of computational scalability | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 2 - Slightly important |
C1P007: Grid congestion, grid instability | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 1 - Unimportant |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P007: Difficult definition of system boundaries | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 2 - Slightly important |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Any other Thecnical BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P008: Social and Cultural barriers | |||||
C1P008: Inertia | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P008: Lack of values and interest in energy optimization measurements | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P008: Low acceptance of new projects and technologies | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 3 - Moderately important |
C1P008: Difficulty of finding and engaging relevant actors | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important |
C1P008: Lack of trust beyond social network | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P008: Rebound effect | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Hostile or passive attitude towards environmentalism | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P008: Exclusion of socially disadvantaged groups | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Non-energy issues are more important and urgent for actors | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important |
C1P008: Hostile or passive attitude towards energy collaboration | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Any other Social BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P009: Information and Awareness barriers | |||||
C1P009: Insufficient information on the part of potential users and consumers | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 3 - Moderately important |
C1P009: Lack of awareness among authorities | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important |
C1P009: Information asymmetry causing power asymmetry of established actors | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 2 - Slightly important |
C1P009: High costs of design, material, construction, and installation | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P009: Any other Information and Awareness BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P010: Financial barriers | |||||
C1P010: Hidden costs | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 2 - Slightly important |
C1P010: Insufficient external financial support and funding for project activities | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P010: Economic crisis | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 3 - Moderately important |
C1P010: Risk and uncertainty | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 3 - Moderately important |
C1P010: Lack of consolidated and tested business models | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P010: Limited access to capital and cost disincentives | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P010: Any other Financial BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P011: Market barriers | |||||
C1P011: Split incentives | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 3 - Moderately important |
C1P011: Energy price distortion | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 3 - Moderately important |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant |
C1P011: Any other Market BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Stakeholders involved | |||||
C1P012: Government/Public Authorities | (not specified) | (not specified) | (not specified) |
| (not specified) |
C1P012: Research & Innovation | (not specified) | (not specified) | (not specified) |
| (not specified) |
C1P012: Financial/Funding | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Analyst, ICT and Big Data | (not specified) | (not specified) | (not specified) |
| (not specified) |
C1P012: Business process management | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Urban Services providers | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Real Estate developers | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Design/Construction companies | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: End‐users/Occupants/Energy Citizens | (not specified) | (not specified) | (not specified) |
| (not specified) |
C1P012: Social/Civil Society/NGOs | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Industry/SME/eCommerce | (not specified) | (not specified) | (not specified) |
| (not specified) |
C1P012: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Other (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)