Name | Project | Type | Compare |
---|---|---|---|
Romania, Alba Iulia PED | ASCEND – Accelerate poSitive Clean ENergy Districts | PED Case Study | Compare |
Romania, Alba Iulia PED | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Munich, Harthof district | PED Case Study | Compare | |
Lublin | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Bærum, Eiksveien 116 | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Findhorn, the Park | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Amsterdam, Buiksloterham PED | ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities | PED Case Study | Compare |
Schönbühel-Aggsbach, Schönbühel an der Donau | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Umeå, Ålidhem district | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Uncompare |
Aalborg East | PED Relevant Case Study / PED Lab | Compare | |
Ankara, Çamlık District | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study / PED Relevant Case Study | Compare |
Trenčín | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Uncompare |
Luxembourg, Betzdorf | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Vantaa, Aviapolis | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Vidin, Himik and Bononia | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Oslo, Verksbyen | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Uden, Loopkantstraat | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Relevant Case Study | Uncompare |
Zaragoza, Actur | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Relevant Case Study | Compare |
Aarhus, Brabrand | BIPED – Building Intelligent Positive Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Riga, Ķīpsala, RTU smart student city | ExPEDite – Enabling Positive Energy Districts through Digital Twins | PED Case Study | Uncompare |
Izmir, District of Karşıyaka | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Istanbul, Ozyegin University Campus | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Espoo, Kera | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study / PED Relevant Case Study | Compare |
Borlänge, Rymdgatan’s Residential Portfolio | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Freiburg, Waldsee | PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district | PED Case Study | Uncompare |
Innsbruck, Campagne-Areal | PED Relevant Case Study | Compare | |
Graz, Reininghausgründe | PED Case Study | Compare | |
Stor-Elvdal, Campus Evenstad | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Relevant Case Study | Compare |
Oulu, Kaukovainio | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Uncompare |
Halmstad, Fyllinge | PED Relevant Case Study | Compare | |
Lund, Brunnshög district | PED Case Study | Compare | |
Vienna, Am Kempelenpark | PED Case Study | Compare | |
Évora, Portugal | POCITYF – A POsitive Energy CITY Transformation Framework | PED Relevant Case Study / PED Lab | Uncompare |
Kladno, Sletiště (Sport Area), PED Winter Stadium | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
Groningen, PED South | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Groningen, PED North | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Maia, Sobreiro Social Housing | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Lab | Compare |
Lubia (Soria), CEDER-CIEMAT | PED Lab | Compare | |
Tampere, Ilokkaanpuisto district | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study | Uncompare |
Leon, Former Sugar Factory district | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Istanbul, Kadikoy district, Caferaga | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Espoo, Leppävaara district, Sello center | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Espoo, Espoonlahti district, Lippulaiva block | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Salzburg, Gneis district | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Barcelona, Santa Coloma de Gramenet | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Tartu, City centre area | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study / PED Lab | |
Bologna, Pilastro-Roveri district | GRETA – GReen Energy Transition Actions | PED Relevant Case Study | Compare |
Barcelona, SEILAB & Energy SmartLab | PED Lab | Compare | |
Leipzig, Baumwollspinnerei district | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Kifissia, Energy community | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
Title | Tartu, City centre area | Riga, Ķīpsala, RTU smart student city | Trenčín | Freiburg, Waldsee | Uden, Loopkantstraat | Tampere, Ilokkaanpuisto district | Oulu, Kaukovainio | Umeå, Ålidhem district | Évora, Portugal |
---|---|---|---|---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | |||||||||
A1P001: Name of the PED case study / PED Lab | Tartu, City centre area | Riga, Ķīpsala, RTU smart student city | Trenčín | Freiburg, Waldsee | Uden, Loopkantstraat | Tampere, Ilokkaanpuisto district | Oulu, Kaukovainio | Umeå, Ålidhem district | Évora, Portugal |
A1P002: Map / aerial view / photos / graphic details / leaflet | |||||||||
A1P002: Map / aerial view / photos / graphic details / leaflet |
|
|
| ||||||
A1P003: Categorisation of the PED site | |||||||||
PED case study | no | yes | yes | yes | no | no | yes | yes | no |
PED relevant case study | yes | no | no | no | yes | yes | no | no | yes |
PED Lab. | yes | no | no | no | no | no | no | no | yes |
A1P004: Targets of the PED case study / PED Lab | |||||||||
Climate neutrality | yes | yes | yes | yes | yes | yes | yes | yes | no |
Annual energy surplus | no | no | yes | no | yes | no | no | no | yes |
Energy community | no | yes | yes | yes | no | yes | no | no | yes |
Circularity | yes | no | no | no | no | no | yes | no | no |
Air quality and urban comfort | no | no | no | no | no | no | no | no | no |
Electrification | yes | no | no | yes | yes | yes | yes | no | no |
Net-zero energy cost | no | no | no | no | no | no | no | no | no |
Net-zero emission | yes | no | no | yes | no | yes | no | no | no |
Self-sufficiency (energy autonomous) | no | yes | yes | no | no | yes | no | no | no |
Maximise self-sufficiency | yes | yes | no | no | no | no | no | no | no |
Other | no | no | no | no | no | no | no | no | no |
Other (A1P004) | |||||||||
A1P005: Phase of the PED case study / PED Lab | |||||||||
A1P005: Project Phase of your case study/PED Lab | Implementation Phase | Planning Phase | Planning Phase | Planning Phase | In operation | Completed | In operation | Planning Phase | Implementation Phase |
A1P006: Start Date | |||||||||
A1P006: Start date | 02/16 | 01/24 | 06/19 | 11/21 | 06/17 | 04/14 | 10/22 | 10/19 | |
A1P007: End Date | |||||||||
A1P007: End date | 07/22 | 12/26 | 11/23 | 11/24 | 05/23 | 10/23 | 09/25 | 09/24 | |
A1P008: Reference Project | |||||||||
A1P008: Reference Project | |||||||||
A1P009: Data availability | |||||||||
A1P009: Data availability |
|
|
|
|
|
|
| ||
A1P009: Other | |||||||||
A1P010: Sources | |||||||||
Any publication, link to website, deliverable referring to the PED/PED Lab |
|
|
|
| |||||
A1P011: Geographic coordinates | |||||||||
X Coordinate (longitude): | 26.722737 | 24.08168339 | 18.046870515442922 | 7.885857135842917 | 5.6191 | 23.798083 | 25.517595084093507 | 20.2630 | -7.909377 |
Y Coordinate (latitude): | 58.380713 | 56.95245956 | 48.899251380340274 | 47.986535207080045 | 51.6606 | 61.464088 | 64.99288098173132 | 63.8258 | 38.570804 |
A1P012: Country | |||||||||
A1P012: Country | Estonia | Latvia | Slovakia | Germany | Netherlands | Finland | Finland | Sweden | Portugal |
A1P013: City | |||||||||
A1P013: City | Tartu | Riga | Trencin | Freiburg im Breisgau | Uden | Tampere | Oulu | Umeå | Évora |
A1P014: Climate Zone (Köppen Geiger classification) | |||||||||
A1P014: Climate Zone (Köppen Geiger classification). | Dfb | Cfb | Cfb | Cfb | Cfb | Dfb | Dfc | Dfb | Csa |
A1P015: District boundary | |||||||||
A1P015: District boundary | Functional | Geographic | Functional | Virtual | Geographic | Virtual | Geographic | Geographic | |
Other | Regional (close to virtual) | ||||||||
A1P016: Ownership of the case study/PED Lab | |||||||||
A1P016: Ownership of the case study/PED Lab: | Private | Public | Mixed | Mixed | Private | Mixed | Mixed | Public | Mixed |
A1P017: Ownership of the land / physical infrastructure | |||||||||
A1P017: Ownership of the land / physical infrastructure: | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners | Single Owner | Multiple Owners | Single Owner | Single Owner | Multiple Owners |
A1P018: Number of buildings in PED | |||||||||
A1P018: Number of buildings in PED | 18 | 15 | 10 | 2941 | 1 | 6 | 6 | ||
A1P019: Conditioned space | |||||||||
A1P019: Conditioned space [m²] | 35217 | 170000 | 2000 | 284070 | 2360 | 9.000 | 19700 | 42000 | |
A1P020: Total ground area | |||||||||
A1P020: Total ground area [m²] | 793144 | 119264 | 75000 | 4920000 | 3860 | 25.000 | 60000 | 52000 | |
A1P021: Floor area ratio: Conditioned space / total ground area | |||||||||
A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 1 | 0 | 0 | 1 | 0 | 0 | 1 | 0 |
A1P022: Financial schemes | |||||||||
A1P022a: Financing - PRIVATE - Real estate | yes | no | yes | no | yes | yes | yes | no | no |
A1P022a: Add the value in EUR if available [EUR] | 6500000 | 7804440 | |||||||
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no | no | no | no | no |
A1P022b: Add the value in EUR if available [EUR] | |||||||||
A1P022c: Financing - PRIVATE - Other | no | no | no | no | no | yes | no | no | no |
A1P022c: Add the value in EUR if available [EUR] | |||||||||
A1P022d: Financing - PUBLIC - EU structural funding | yes | no | yes | no | no | no | no | no | no |
A1P022d: Add the value in EUR if available [EUR] | 4000000 | ||||||||
A1P022e: Financing - PUBLIC - National funding | yes | no | no | no | no | yes | no | no | no |
A1P022e: Add the value in EUR if available [EUR] | 8000000 | ||||||||
A1P022f: Financing - PUBLIC - Regional funding | no | no | no | no | no | no | no | no | no |
A1P022f: Add the value in EUR if available [EUR] | |||||||||
A1P022g: Financing - PUBLIC - Municipal funding | no | no | yes | yes | no | no | yes | no | no |
A1P022g: Add the value in EUR if available [EUR] | |||||||||
A1P022h: Financing - PUBLIC - Other | no | no | yes | no | no | no | no | no | no |
A1P022h: Add the value in EUR if available [EUR] | |||||||||
A1P022i: Financing - RESEARCH FUNDING - EU | no | yes | no | yes | no | yes | yes | no | yes |
A1P022i: Add the value in EUR if available [EUR] | 7500000 | 19998275 | |||||||
A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | yes | no | no | no | no | no |
A1P022j: Add the value in EUR if available [EUR] | |||||||||
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no | no | no | no | no |
A1P022k: Add the value in EUR if available [EUR] | |||||||||
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no | no | no | no | no |
A1P022l: Add the value in EUR if available [EUR] | |||||||||
A1P022: Other | |||||||||
A1P023: Economic Targets | |||||||||
A1P023: Economic Targets |
|
|
|
|
| ||||
A1P023: Other | Developing and demonstrating new solutions | ||||||||
A1P024: More comments: | |||||||||
A1P024: More comments: | The project is a follow-up from the “Social Beautiful” concept which was developed in collaboration between Labyrint (Support in sheltered housing), Area (housing company), the municipality of Uden, and Hendriks Coppelmans (developer). The concept aims to provide an answer to changes in various policy areas and the changing demands of society. The Social Beautiful concept consists of the following elements: 1. Living, working, and community services are brought together in one location. A multifunctional residential and service centre is being realized at the location. 2. Housing is shaped by the realization of financially accessible homes suitable for the target group. The housing design is tailored to the target group. it may also include sheltered / protected living. 3. Work takes place at the location or from the same location. The work has a social function within the neighbourhood. Wage-related work must contribute to providing structure in the daily activities of the residents. 4. Neighbourhood management is organized from the location in the surrounding neighbourhood. A service package is provided from the residential and service centre that contributes to the ability of neighbourhood residents to live independently for longer, to strengthen the social network, and to improve the quality of life and safety in the neighbourhood. 5. The houses are suitable for use at all times for regular rental. Communal facilities must be realized within the contours of a regular apartment. The objective is to offer a suitable living and working situation to a group of vulnerable citizens. In this way they become a fully-fledged part of society. They not only make use of the facilities themselves, but also give substance to the level of facilities in the municipality. Due to the integrated approach, they experience a greater sense of well-being and security. | ||||||||
A1P025: Estimated PED case study / PED LAB costs | |||||||||
A1P025: Estimated PED case study / PED LAB costs [mil. EUR] | 25 | 0 | 7804440 | 5 | |||||
Contact person for general enquiries | |||||||||
A1P026: Name | Jaanus Tamm | Judith Stiekema | Vladimír Škola | Dr. Annette Steingrube | Tonje Healey Trulsrud | Senior Scientist Terttu Vainio | Samuli Rinne | Gireesh Nair | João Bravo Dias |
A1P027: Organization | Tartu City Government | OASC | City of Trencin | Fraunhofer Institute for solar energy systems | Norwegian University of Science and Technology (NTNU) | VTT Technical Research Centre of Finland | City of Oulu | Umea Municipality | EDP Labelec |
A1P028: Affiliation | Municipality / Public Bodies | Other | Other | Research Center / University | Research Center / University | Research Center / University | Municipality / Public Bodies | Municipality / Public Bodies | SME / Industry |
A1P028: Other | not for profit private organisation | Project Manager | |||||||
A1P029: Email | Jaanus.tamm@tartu.ee | judith@oascities.org | vladimir.skola@trencin.sk | Annette.Steingrube@ise.fraunhofer.de | tonje.h.trulsrud@ntnu.no | terttu.vainio@vtt.fi | samuli.rinne@ouka.fi | gireesh.nair@umu.se | joao.bravodias@edp.pt |
Contact person for other special topics | |||||||||
A1P030: Name | Kaspar Alev | Vladimír Škola | Samuli Rinne | ||||||
A1P031: Email | Kaspar.alev@tartu.ee | vladimir.skola@trencin.sk | samuli.rinne@ouka.fi | ||||||
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes |
A2P001: Fields of application | |||||||||
A2P001: Fields of application |
|
|
|
|
|
|
|
|
|
A2P001: Other | |||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | |||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | Energy efficiency: - buildings retrofitting - combined public and private financing - low temperature central heating - LED lighting Energy production: - installation of photovoltaic (PV) systems for renewable on-site energy production; Digital technologies: - smart-meters smart home system. Smart city information platform E-mobility - Installation of new charging stations for electric vehicles; - e-bike/bikesharing services implementation. Urban comfort and air quality - Control units for air pollutants concentration (PM2.5, PM10, NO2) - Sustainable Energy and Climate Action Plan - SECAP) | A suite of replicable modeling tools will enable stakeholders to analyze planning actions towards positive energy in a cost-effective fashion, aiding their evidence based decision-making process. The tools will be able to model the district’s energy production and demand, optimize for flexibility and simulate mobility and transport. By employing gamification and co-creation approaches, the project will enhance public awareness and engagement in energy efficiency. The project will culminate in the publication of practical guidelines, reusable models, algorithms, and training materials to aid other cities to replicate the digital twin for their districts, fostering widespread adoption of sustainable energy practices. | Energy system modeling | Energy efficiency: Energy efficient envelope, with good insulation, triple glazing windows and airtight envelope. (EPC = 0) Energy Flexibility: MCP controls for the heat pump in the apartments. Energy production: PV panels on the roof, Ground source heat pumps Waste management: construction waste was kept to a minimum and sorted and collected separately as much as possible. Indoor air quality: Exhaust ventilation and opening of windows Construction materials: low carbon emission building materials | Energy efficiency: - A-class buildings - Heating by GSHP Energy production: - Installation of photovoltaic (PV) Digital technologies: - Smart control and monitoring of HVAC and indoor circumstances E-mobility - Installation of charging stations for electric vehicles; | Different kinds of waste heat streams are utilized by heat pumps. These are district heating return water (actually this is an indirect way to cool down the flue gas in the scrubber), ventilation exhaust air and sewage water. As a normal case, in ventilation also air-to-air heat exchanges are used. PV power is harvested also, in vertical and more horizontal panels. Buildings are well insulated to decrease the needed amount of heating energy in the first place. | Simulation tools: City Energy Analyst and Polysun | ||
A2P003: Application of ISO52000 | |||||||||
A2P003: Application of ISO52000 | No | No | Yes | Yes | No | No | No | No | |
A2P004: Appliances included in the calculation of the energy balance | |||||||||
A2P004: Appliances included in the calculation of the energy balance | Yes | Yes | Yes | No | Yes | No | Yes | Yes | |
A2P005: Mobility included in the calculation of the energy balance | |||||||||
A2P005: Mobility included in the calculation of the energy balance | No | Yes | Yes | No | No | No | No | Yes | |
A2P006: Description of how mobility is included (or not included) in the calculation | |||||||||
A2P006: Description of how mobility is included (or not included) in the calculation | The university operates a fleet of 13 electric vehicles (EV) (61kW power each). There are 5 EV charging stations on campus. | All energy demands are included in energy balance, either fuel demands or electrical demand of transport sector; Projection is made of future share of electric mobilty, rest is covered with synthetic fuels to achieve climate neutrality | not included | Not included. However, there is a charging place for a shared EV in one building. | |||||
A2P007: Annual energy demand in buildings / Thermal demand | |||||||||
A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum] | 9.1 | 8000 | 135.715 | 0.148 | 0 | 2.1 | |||
A2P008: Annual energy demand in buildings / Electric Demand | |||||||||
A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum] | 5000 | 31.76 | 0.109 | 0.7 | 0.2 | 0 | |||
A2P009: Annual energy demand for e-mobility | |||||||||
A2P009: Annual energy demand for e-mobility [GWh/annum] | |||||||||
A2P010: Annual energy demand for urban infrastructure | |||||||||
A2P010: Annual energy demand for urban infrastructure [GWh/annum] | |||||||||
A2P011: Annual renewable electricity production on-site during target year | |||||||||
A2P011: PV | yes | no | no | no | yes | yes | yes | yes | no |
A2P011: PV - specify production in GWh/annum [GWh/annum] | 0.058 | 0.7 | 0.1 | 0.249 | |||||
A2P011: Wind | no | yes | no | no | no | no | no | no | no |
A2P011: Wind - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Hydro | no | no | no | no | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Biomass_el | no | no | no | no | no | no | no | no | no |
A2P011: Biomass_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Biomass_peat_el | no | no | no | no | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: PVT_el | no | yes | no | no | no | no | no | no | no |
A2P011: PVT_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Other | no | no | no | no | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Annual renewable thermal production on-site during target year | |||||||||
A2P012: Geothermal | no | no | no | no | yes | yes | no | no | no |
A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Solar Thermal | yes | no | no | no | no | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum] | 0.5 | ||||||||
A2P012: Biomass_heat | no | yes | no | no | no | no | no | no | no |
A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Waste heat+HP | no | no | no | no | no | no | yes | no | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum] | 2.2 | ||||||||
A2P012: Biomass_peat_heat | no | no | no | no | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: PVT_th | no | no | no | no | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Biomass_firewood_th | no | no | no | no | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Other | no | no | no | no | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P013: Renewable resources on-site - Additional notes | |||||||||
A2P013: Renewable resources on-site - Additional notes | Conventional power generation: The university’s heat supply is designed as a local centralized heat supply system. Electrical power, generated in combined heat and power (CHP) units, is delivered to the distribution network and sold to energy traders as regulated by local legislation and norms. There are two natural gas burners acting as heat sources (3MW and 6MW capacity), and two CHP units (1.6MW and 0.45MW thermal capacity). All heating is supplied from the CHP plants. Renewable Energy Sources (RES): a wind turbine (3.6 kW) and PV panels (11.7 kW) are connected to the faculty microgrid. In the future it is planned to power the campus entirely from local RES. | 53 MW PV potential in all three quarters; no other internal renewable energy potentials known | *Annual energy use below is presentedin primary energy consumption | PV plant of energy community locates outside of the city, not on the slot | Heat is produced from DH return, refrigeration and exhaust air. The mentioned 2200 MWh/a includes HP el. consumption (about 1/6 of that) | ||||
A2P014: Annual energy use | |||||||||
A2P014: Annual energy use [GWh/annum] | 132.5 | 0.194 | 0.7 | 2.3 | 6.1 | ||||
A2P015: Annual energy delivered | |||||||||
A2P015: Annual energy delivered [GWh/annum] | 0.0368 | ||||||||
A2P016: Annual non-renewable electricity production on-site during target year | |||||||||
A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum] | 0 | 0 | |||||||
A2P017: Annual non-renewable thermal production on-site during target year | |||||||||
A2P017: Gas | no | yes | no | no | no | no | no | no | no |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Coal | no | no | no | no | no | no | no | no | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Oil | no | no | no | no | no | no | no | no | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Other | no | no | no | no | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P018: Annual renewable electricity imports from outside the boundary during target year | |||||||||
A2P018: PV | no | no | no | no | no | no | yes | no | no |
A2P018 - PV: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Wind | no | no | no | no | no | no | yes | no | no |
A2P018 - Wind: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Hydro | no | no | no | no | no | no | yes | no | no |
A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Biomass_el | no | no | no | no | no | no | yes | no | no |
A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Biomass_peat_el | no | no | no | no | no | no | yes | no | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: PVT_el | no | no | no | no | no | no | no | no | no |
A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Other | no | no | no | no | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P019: Annual renewable thermal imports from outside the boundary during target year | |||||||||
A2P019: Geothermal | no | no | no | no | no | no | no | no | no |
A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Solar Thermal | no | no | no | no | no | no | no | no | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_heat | no | no | no | no | no | no | yes | yes | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum] | 0.7 | ||||||||
A2P019: Waste heat+HP | no | no | no | no | no | no | no | yes | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_peat_heat | no | no | no | no | no | no | no | no | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: PVT_th | no | no | no | no | no | no | no | no | no |
A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_firewood_th | no | no | no | no | no | no | no | no | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Other | no | no | no | no | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P020: Share of RES on-site / RES outside the boundary | |||||||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 | 0 | 3.2857142857143 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | |||||||||
A2P021: GHG-balance calculated for the PED [tCO2/annum] | 980 | -0.00043 | 0 | 0 | |||||
A2P022: KPIs related to the PED case study / PED Lab | |||||||||
A2P022: Safety & Security | Personal Safety | ||||||||
A2P022: Health | Healthy community | Encouraging a healthy lifestyle | |||||||
A2P022: Education | |||||||||
A2P022: Mobility | yes | Sustainable mobility | Modal Split, Fuel mix in mobility, Energy use for transportation, Access to public transport, Public infrastructure promoting low-carbon mobility, Number of public EV charging stations, Energy delivered for EV charging | ||||||
A2P022: Energy | yes | NOn-renewable primary energy balance, renewable energy ratio, grid purchase factor, load cover factor/self-generation, supply cover factor/self-consumption, net energy/net power, peak delivered/peak expoted, total greenhouse gas emission | Final energy consumption, Primary energy consumption, Energy imported to PED, Energy exported from PED, RES production, PED energy balance, Energy savings in the PED, GHG emissions, Reduction of emissions, Final energy consumption per capita, Primary energy consumption per capita, Primary energy sources (shares), Buildings connected to DH-network or renewable energy grid, GHG emissions per capita, System flexibility for energy players, RES storage usage, Peak load reduction | Energy | |||||
A2P022: Water | |||||||||
A2P022: Economic development | capital costs, operational cots, overall economic performance (5 KPIs) | Total investments, Payback time, Economic value of savings | |||||||
A2P022: Housing and Community | yes | demographic composition, diverse community, social cohesion | Development of housing prices, Housing cost overburden rate, Citizen engagement/empowerment to climate conscious actions, Inhabitants in dense areas, Energy poverty | ||||||
A2P022: Waste | Recycling rate | ||||||||
A2P022: Other | Smartness and flecibility, Indoor Environmental Quality, Social performance - Equity (affordable housing, access to servicees and amenitioes, afforability of energy, living conditions, sustinable mobility, universal design) | Smart Cities strategies, Quality of open data | |||||||
A2P023: Technological Solutions / Innovations - Energy Generation | |||||||||
A2P023: Photovoltaics | yes | no | no | yes | yes | yes | yes | yes | yes |
A2P023: Solar thermal collectors | no | no | no | yes | no | no | no | no | yes |
A2P023: Wind Turbines | no | no | no | no | no | no | no | no | no |
A2P023: Geothermal energy system | no | no | no | yes | yes | yes | no | no | no |
A2P023: Waste heat recovery | no | no | no | yes | no | yes | yes | no | no |
A2P023: Waste to energy | no | no | no | yes | no | no | no | no | no |
A2P023: Polygeneration | no | no | no | no | no | no | no | no | no |
A2P023: Co-generation | no | no | no | yes | no | no | yes | no | no |
A2P023: Heat Pump | no | no | no | yes | yes | yes | yes | no | no |
A2P023: Hydrogen | no | no | no | yes | no | no | no | no | no |
A2P023: Hydropower plant | no | no | no | yes | no | no | no | no | no |
A2P023: Biomass | yes | no | no | yes | no | no | yes | no | no |
A2P023: Biogas | yes | no | no | yes | no | no | no | no | no |
A2P023: Other | |||||||||
A2P024: Technological Solutions / Innovations - Energy Flexibility | |||||||||
A2P024: A2P024: Information and Communication Technologies (ICT) | yes | yes | no | yes | no | yes | yes | yes | yes |
A2P024: Energy management system | yes | yes | yes | yes | yes | yes | yes | no | yes |
A2P024: Demand-side management | no | yes | no | yes | yes | yes | no | yes | no |
A2P024: Smart electricity grid | no | yes | no | yes | no | no | no | no | yes |
A2P024: Thermal Storage | no | yes | yes | yes | no | no | yes | no | yes |
A2P024: Electric Storage | no | yes | yes | yes | no | no | no | no | yes |
A2P024: District Heating and Cooling | yes | yes | yes | yes | no | no | yes | no | no |
A2P024: Smart metering and demand-responsive control systems | no | yes | no | yes | yes | yes | no | no | yes |
A2P024: P2P – buildings | no | no | no | yes | no | no | no | no | yes |
A2P024: Other | Electric grid as virtual battery | District Heating | |||||||
A2P025: Technological Solutions / Innovations - Energy Efficiency | |||||||||
A2P025: Deep Retrofitting | yes | no | yes | yes | no | no | yes | yes | no |
A2P025: Energy efficiency measures in historic buildings | no | no | yes | yes | no | no | no | no | yes |
A2P025: High-performance new buildings | no | no | no | no | yes | yes | yes | no | no |
A2P025: Smart Public infrastructure (e.g. smart lighting) | yes | no | no | no | no | no | no | no | no |
A2P025: Urban data platforms | yes | yes | no | yes | no | no | yes | no | yes |
A2P025: Mobile applications for citizens | yes | yes | no | no | no | yes | no | no | yes |
A2P025: Building services (HVAC & Lighting) | no | yes | yes | no | yes | yes | yes | no | yes |
A2P025: Smart irrigation | no | no | no | no | no | no | no | no | no |
A2P025: Digital tracking for waste disposal | no | no | no | no | no | no | no | no | yes |
A2P025: Smart surveillance | yes | no | no | no | no | no | no | no | yes |
A2P025: Other | |||||||||
A2P026: Technological Solutions / Innovations - Mobility | |||||||||
A2P026: Efficiency of vehicles (public and/or private) | yes | no | no | yes | no | no | yes | no | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | yes | no | no | yes | no | no | yes | no | no |
A2P026: e-Mobility | yes | no | no | yes | no | no | yes | no | yes |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | yes | no | no | yes | no | yes |
A2P026: Car-free area | no | no | no | no | no | no | no | no | no |
A2P026: Other | |||||||||
A2P027: Mobility strategies - Additional notes | |||||||||
A2P027: Mobility strategies - Additional notes | SUMP AVAILABLE | ||||||||
A2P028: Energy efficiency certificates | |||||||||
A2P028: Energy efficiency certificates | Yes | No | No | Yes | Yes | Yes | Yes | No | |
A2P028: If yes, please specify and/or enter notes | EPC = 0, energy neutral building | The obligatory buildijng energy classification | |||||||
A2P029: Any other building / district certificates | |||||||||
A2P029: Any other building / district certificates | No | No | No | No | No | No | |||
A2P029: If yes, please specify and/or enter notes | |||||||||
A3P001: Relevant city /national strategy | |||||||||
A3P001: Relevant city /national strategy |
|
|
|
|
|
|
| ||
A3P002: Quantitative targets included in the city / national strategy | |||||||||
A3P002: Quantitative targets included in the city / national strategy | Climate neutrality by 2035 | Carbon neutrality by 2035 | |||||||
A3P003: Strategies towards decarbonization of the gas grid | |||||||||
A3P003: Strategies towards decarbonization of the gas grid |
|
| |||||||
A3P003: Other | SECAP developed in 2023 | NA | |||||||
A3P004: Identification of needs and priorities | |||||||||
A3P004: Identification of needs and priorities | SELF SUSTAINABILITY, SELF EFFICIENCY | Freiburg has ambitious goals and wants to achieve climate neutrality until 2035, the PED concept could help to develop suitable strategies on district level | Developing and demonstrating solutions for carbon neutrality | ||||||
A3P005: Sustainable behaviour | |||||||||
A3P005: Sustainable behaviour | BASED ON SECAP DEVELOPED IN 2023 | Energy efficiency by renovation measures for buildings and measures for saving electricity; electrification by installation of heat pumps and photovoltaics and switching to electric cars, additional measures not directly related to PED like sustainable diet and sharing economy | E. g. visualizing energy and water consumption | ||||||
A3P006: Economic strategies | |||||||||
A3P006: Economic strategies |
|
|
|
|
| ||||
A3P006: Other | |||||||||
A3P007: Social models | |||||||||
A3P007: Social models |
|
|
|
|
|
|
| ||
A3P007: Other | |||||||||
A3P008: Integrated urban strategies | |||||||||
A3P008: Integrated urban strategies |
|
|
|
|
|
| |||
A3P008: Other | |||||||||
A3P009: Environmental strategies | |||||||||
A3P009: Environmental strategies |
|
|
|
|
| ||||
A3P009: Other | |||||||||
A3P010: Legal / Regulatory aspects | |||||||||
A3P010: Legal / Regulatory aspects | |||||||||
B1P001: PED/PED relevant concept definition | |||||||||
B1P001: PED/PED relevant concept definition | ExPEDite aims at creating and deploying a novel digital twin, allowing for real-time monitoring, visualization and management of district-level energy flows. Cities consume 65% of the world’s energy supply and are responsible for 70% of the CO² emissions, hence sharing a lot of the responsibility for climate change. We are faced with the challenge of redesigning our existing cities to make them more sustainable, resilient, inclusive and safe. Developing Positive Energy Districts (PEDs), is a breakthrough way to deal with the issue of urban emissions and applying adaptation and mitigation strategies to climate change, while ensuring that these urban areas generate an annual surplus of renewable energy and net zero greenhouse gas emissions. PEDs must address environmental, economic and social issues, providing solutions to energy consumption, production, emissions, transport & mobility and livability. By constantly monitoring and evaluating parameters through existing and/or novel sensor systems (e.g., renewable energy production/supply, transport conditions, air quality, energy demand, meteorological conditions, etc.), unconventional techniques may be applied to provide more sustainable options for the district’s needs. | GOOD MIX OF PUBLIC PRIVATE BUILDINGS | Assessment methods for this ped (and for germany) is defined in this project at the moment and will be tested at that case study | The demonstration projects is a new residential development, which consists of an apartment complex which includes 39 apartments spread over 3 floors. It is a sustainble plus energy neighbouhood, and has reached a plus energy balance on its first year in operation. It has MPC controls on the individual heat pumps to improve the energy flexibility of the apartments. It includes the "social beatiful" concepts with a strong emphasis on the social sustainability of the project. | The original idea is that the area produces at least as much it consumes. | The PED main objective is to achieve the energy transition while preserving cultural heritage and improving citizen’s quality of life. | |||
B1P002: Motivation behind PED/PED relevant project development | |||||||||
B1P002: Motivation behind PED/PED relevant project development | Expected outcome 1 Increased number of (tangible) city planning actions for positive clean energy districts using the (proto-)PED design, development and management digital twin tools (based on pre-market research learnings) using open-standards based components which can be reused elsewhere. 2 Increased integration of existing smaller scale management systems (e.g. Building management systems) with open-standards based operational city platforms using sectorial data (e.g. building data, mobility, urban planning, etc.). 3 Enhanced data gathering approaches with identification of relevant multidimensional data sets (e.g. meteorological, load profile, social, geo-spatial, etc.) high-resolution real-time data streams (e.g. renewable energy production, energy consumption), and relevant forecasting data, drawing also on the work of common European data spaces. 4 Increased number of city planning departments / approaches using common data and (replicable) elements and processes. 5 Consolidated city sensor network specifications, complemented by appropriate data gathering approaches for soft data. 6 Improved performance of AI based self-learning systems for optimization of positive clean energy districts and bottom-up complex models. 7 Enhanced innovation capacity of local/regional administrations and accelerated uptake of shared, smart and sustainable zero emission solutions. | Replication of unique PED know how | City is interested in transforming the quarter, as many buildings are old, have private owner structures and have decentralised heating systems. As the city wants to become climate neutral by 2035 action is needed now. In the research project PED urban the idea is to focus on the future energy system of the quarter and use it as a case study to develop a common assessment method for PEDs in alignment with european efforts in that regard | The need for social housing and the ambition to create a great living environment with a high-performance apartment complex, supplied with renewable energy. It results in lower energy bills for the tenants and high-quality homes. | Developing systems towards carbon neutrality. Also urban renewal. | POCITYF brings together eight cities (Lightouse and Fellow cities), all having cultural heritage areas in their territory. All are intrinsically motivated to participate in the necessary energy transition not only for their conventional city districts of mixed-used, but also for districts with individually specificities as those belonging in their cultural heritage, which at the moment may be acting as barriers for their further environmental sustainability, but after POCITYF will be acting as a promising building retrofits roadmap for similar and other EU cities. | |||
B1P003: Environment of the case study area | |||||||||
B2P003: Environment of the case study area | Urban area | Urban area | Urban area | Suburban area | Suburban area | Suburban area | Suburban area | Urban area | Urban area |
B1P004: Type of district | |||||||||
B2P004: Type of district |
|
|
|
|
|
|
|
| |
B1P005: Case Study Context | |||||||||
B1P005: Case Study Context |
|
|
|
|
|
|
|
| |
B1P006: Year of construction | |||||||||
B1P006: Year of construction | |||||||||
B1P007: District population before intervention - Residential | |||||||||
B1P007: District population before intervention - Residential | 4500 | 5898 | 0 | 3500 | |||||
B1P008: District population after intervention - Residential | |||||||||
B1P008: District population after intervention - Residential | 5898 | 300 | 3500 | ||||||
B1P009: District population before intervention - Non-residential | |||||||||
B1P009: District population before intervention - Non-residential | |||||||||
B1P010: District population after intervention - Non-residential | |||||||||
B1P010: District population after intervention - Non-residential | |||||||||
B1P011: Population density before intervention | |||||||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
B1P012: Population density after intervention | |||||||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0.0011987804878049 | 0 | 12 | 0.058333333333333 | 0 | 0 |
B1P013: Building and Land Use before intervention | |||||||||
B1P013: Residential | yes | no | no | yes | no | no | yes | yes | no |
B1P013 - Residential: Specify the sqm [m²] | |||||||||
B1P013: Office | no | no | no | yes | no | no | no | no | no |
B1P013 - Office: Specify the sqm [m²] | |||||||||
B1P013: Industry and Utility | no | no | no | yes | no | no | no | no | no |
B1P013 - Industry and Utility: Specify the sqm [m²] | |||||||||
B1P013: Commercial | yes | no | no | yes | no | no | yes | no | no |
B1P013 - Commercial: Specify the sqm [m²] | |||||||||
B1P013: Institutional | no | no | no | yes | no | no | no | no | no |
B1P013 - Institutional: Specify the sqm [m²] | |||||||||
B1P013: Natural areas | yes | no | no | yes | no | yes | yes | no | no |
B1P013 - Natural areas: Specify the sqm [m²] | |||||||||
B1P013: Recreational | yes | no | no | yes | no | no | yes | no | no |
B1P013 - Recreational: Specify the sqm [m²] | |||||||||
B1P013: Dismissed areas | no | no | no | no | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm [m²] | |||||||||
B1P013: Other | no | no | no | no | no | no | no | no | no |
B1P013 - Other: Specify the sqm [m²] | |||||||||
B1P014: Building and Land Use after intervention | |||||||||
B1P014: Residential | yes | no | no | yes | yes | yes | yes | yes | no |
B1P014 - Residential: Specify the sqm [m²] | 2394 | ||||||||
B1P014: Office | no | no | no | yes | no | no | no | no | no |
B1P014 - Office: Specify the sqm [m²] | |||||||||
B1P014: Industry and Utility | no | no | no | yes | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm [m²] | |||||||||
B1P014: Commercial | yes | no | no | yes | no | no | yes | no | no |
B1P014 - Commercial: Specify the sqm [m²] | |||||||||
B1P014: Institutional | no | no | no | yes | no | no | no | no | no |
B1P014 - Institutional: Specify the sqm [m²] | |||||||||
B1P014: Natural areas | yes | no | no | yes | no | no | yes | no | no |
B1P014 - Natural areas: Specify the sqm [m²] | |||||||||
B1P014: Recreational | yes | no | no | yes | no | no | yes | no | no |
B1P014 - Recreational: Specify the sqm [m²] | |||||||||
B1P014: Dismissed areas | no | no | no | no | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm [m²] | |||||||||
B1P014: Other | no | no | no | no | no | no | no | no | no |
B1P014 - Other: Specify the sqm [m²] | |||||||||
B2P001: PED Lab concept definition | |||||||||
B2P001: PED Lab concept definition | |||||||||
B2P002: Installation life time | |||||||||
B2P002: Installation life time | |||||||||
B2P003: Scale of action | |||||||||
B2P003: Scale | District | District | |||||||
B2P004: Operator of the installation | |||||||||
B2P004: Operator of the installation | |||||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||||||
B2P006: Circular Economy Approach | |||||||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | No | ||||||||
B2P006: Other | |||||||||
B2P007: Motivation for developing the PED Lab | |||||||||
B2P007: Motivation for developing the PED Lab |
| ||||||||
B2P007: Other | |||||||||
B2P008: Lead partner that manages the PED Lab | |||||||||
B2P008: Lead partner that manages the PED Lab | Municipality | ||||||||
B2P008: Other | |||||||||
B2P009: Collaborative partners that participate in the PED Lab | |||||||||
B2P009: Collaborative partners that participate in the PED Lab |
| ||||||||
B2P009: Other | |||||||||
B2P010: Synergies between the fields of activities | |||||||||
B2P010: Synergies between the fields of activities | |||||||||
B2P011: Available facilities to test urban configurations in PED Lab | |||||||||
B2P011: Available facilities to test urban configurations in PED Lab |
|
| |||||||
B2P011: Other | |||||||||
B2P012: Incubation capacities of PED Lab | |||||||||
B2P012: Incubation capacities of PED Lab |
|
| |||||||
B2P013: Availability of the facilities for external people | |||||||||
B2P013: Availability of the facilities for external people | |||||||||
B2P014: Monitoring measures | |||||||||
B2P014: Monitoring measures |
| ||||||||
B2P015: Key Performance indicators | |||||||||
B2P015: Key Performance indicators |
|
| |||||||
B2P016: Execution of operations | |||||||||
B2P016: Execution of operations | |||||||||
B2P017: Capacities | |||||||||
B2P017: Capacities | |||||||||
B2P018: Relations with stakeholders | |||||||||
B2P018: Relations with stakeholders | |||||||||
B2P019: Available tools | |||||||||
B2P019: Available tools |
| ||||||||
B2P019: Available tools | |||||||||
B2P020: External accessibility | |||||||||
B2P020: External accessibility | |||||||||
C1P001: Unlocking Factors | |||||||||
C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 4 - Important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P001: Energy Communities, P2P, Prosumers concepts | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 5 - Very important |
C1P001: Storage systems and E-mobility market penetration | 2 - Slightly important | 4 - Important | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important |
C1P001: Decreasing costs of innovative materials | 3 - Moderately important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 4 - Important | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P001: The ability to predict Multiple Benefits | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 5 - Very important | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P001: The ability to predict the distribution of benefits and impacts | 4 - Important | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important | 3 - Moderately important | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P001: Social acceptance (top-down) | 4 - Important | 4 - Important | 1 - Unimportant | 4 - Important | 5 - Very important | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 4 - Important | 4 - Important | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 4 - Important |
C1P001: Presence of integrated urban strategies and plans | 5 - Very important | 4 - Important | 1 - Unimportant | 4 - Important | 3 - Moderately important | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important |
C1P001: Multidisciplinary approaches available for systemic integration | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important | 5 - Very important | 3 - Moderately important | 4 - Important | 1 - Unimportant | 5 - Very important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 5 - Very important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P001: Availability of RES on site (Local RES) | 4 - Important | 4 - Important | 1 - Unimportant | 4 - Important | 5 - Very important | 5 - Very important | 4 - Important | 1 - Unimportant | 3 - Moderately important |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 4 - Important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important | 4 - Important | 1 - Unimportant | 4 - Important |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P001: Any other UNLOCKING FACTORS (if any) | |||||||||
C1P002: Driving Factors | |||||||||
C1P002: Climate Change adaptation need | 5 - Very important | 5 - Very important | 1 - Unimportant | 4 - Important | 5 - Very important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 5 - Very important | 4 - Important | 1 - Unimportant | 4 - Important | 5 - Very important | 5 - Very important | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P002: Rapid urbanization trend and need of urban expansions | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P002: Urban re-development of existing built environment | 3 - Moderately important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P002: Economic growth need | 2 - Slightly important | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 4 - Important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 4 - Important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P002: Territorial and market attractiveness | 3 - Moderately important | 4 - Important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P002: Energy autonomy/independence | 4 - Important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P002: Any other DRIVING FACTOR | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P002: Any other DRIVING FACTOR (if any) | |||||||||
C1P003: Administrative barriers | |||||||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 4 - Important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 5 - Very important |
C1P003: Lack of good cooperation and acceptance among partners | 2 - Slightly important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P003: Lack of public participation | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P003: Lack of institutions/mechanisms to disseminate information | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P003:Long and complex procedures for authorization of project activities | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 4 - Important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P003: Complicated and non-comprehensive public procurement | 4 - Important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P003: Fragmented and or complex ownership structure | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important |
C1P003: Lack of internal capacities to support energy transition | 4 - Important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P003: Any other Administrative BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P003: Any other Administrative BARRIER (if any) | Delay in the Environmental Dialogue processing in the municipality | ||||||||
C1P004: Policy barriers | |||||||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important |
C1P004: Lacking or fragmented local political commitment and support on the long term | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P004: Lack of Cooperation & support between national-regional-local entities | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P004: Any other Political BARRIER (if any) | |||||||||
C1P005: Legal and Regulatory barriers | |||||||||
C1P005: Inadequate regulations for new technologies | 4 - Important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P005: Regulatory instability | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P005: Non-effective regulations | 4 - Important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P005: Unfavorable local regulations for innovative technologies | 2 - Slightly important | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P005: Building code and land-use planning hindering innovative technologies | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 5 - Very important |
C1P005: Insufficient or insecure financial incentives | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 4 - Important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P005: Shortage of proven and tested solutions and examples | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 1 - Unimportant | 5 - Very important |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P005: Any other Legal and Regulatory BARRIER (if any) | laws favouring big energy companies | ||||||||
C1P006: Environmental barriers | |||||||||
C1P006: Environmental barriers | |||||||||
C1P007: Technical barriers | |||||||||
C1P007: Lack of skilled and trained personnel | 3 - Moderately important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important |
C1P007: Deficient planning | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P007: Retrofitting work in dwellings in occupied state | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P007: Lack of well-defined process | 3 - Moderately important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Inaccuracy in energy modelling and simulation | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P007: Lack/cost of computational scalability | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Grid congestion, grid instability | 2 - Slightly important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P007: Difficult definition of system boundaries | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Any other Thecnical BARRIER (if any) | |||||||||
C1P008: Social and Cultural barriers | |||||||||
C1P008: Inertia | 4 - Important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P008: Lack of values and interest in energy optimization measurements | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Low acceptance of new projects and technologies | 2 - Slightly important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important |
C1P008: Difficulty of finding and engaging relevant actors | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Lack of trust beyond social network | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Rebound effect | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Hostile or passive attitude towards environmentalism | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P008: Exclusion of socially disadvantaged groups | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Non-energy issues are more important and urgent for actors | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Hostile or passive attitude towards energy collaboration | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P008: Any other Social BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P008: Any other Social BARRIER (if any) | |||||||||
C1P009: Information and Awareness barriers | |||||||||
C1P009: Insufficient information on the part of potential users and consumers | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 4 - Important |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P009: Lack of awareness among authorities | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P009: Information asymmetry causing power asymmetry of established actors | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P009: High costs of design, material, construction, and installation | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P009: Any other Information and Awareness BARRIER (if any) | |||||||||
C1P010: Financial barriers | |||||||||
C1P010: Hidden costs | 5 - Very important | 4 - Important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P010: Insufficient external financial support and funding for project activities | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P010: Economic crisis | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P010: Risk and uncertainty | 4 - Important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 5 - Very important | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P010: Lack of consolidated and tested business models | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P010: Limited access to capital and cost disincentives | 4 - Important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P010: Any other Financial BARRIER (if any) | |||||||||
C1P011: Market barriers | |||||||||
C1P011: Split incentives | 4 - Important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P011: Energy price distortion | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 4 - Important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important |
C1P011: Any other Market BARRIER | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P011: Any other Market BARRIER (if any) | |||||||||
C1P012: Stakeholders involved | |||||||||
C1P012: Government/Public Authorities |
|
|
|
|
|
| |||
C1P012: Research & Innovation |
|
|
|
|
|
| |||
C1P012: Financial/Funding |
|
|
|
|
| ||||
C1P012: Analyst, ICT and Big Data |
|
|
|
|
| ||||
C1P012: Business process management |
|
|
|
|
| ||||
C1P012: Urban Services providers |
|
|
|
|
| ||||
C1P012: Real Estate developers |
|
|
|
|
|
| |||
C1P012: Design/Construction companies |
|
|
|
|
|
| |||
C1P012: End‐users/Occupants/Energy Citizens |
|
|
|
|
|
| |||
C1P012: Social/Civil Society/NGOs |
|
|
|
|
| ||||
C1P012: Industry/SME/eCommerce |
|
|
|
|
| ||||
C1P012: Other | |||||||||
C1P012: Other (if any) | |||||||||
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)