Filters:
NameProjectTypeCompare
Tartu, Estonia V2G-QUESTS PED Relevant Case Study Compare
Utrecht, the Netherlands (District of Kanaleneiland) V2G-QUESTS PED Relevant Case Study Compare
Aveiro, Portugal V2G-QUESTS PED Relevant Case Study Compare
Győr Geothermal District Heating Project PED Relevant Case Study Compare
Jacobs Borchs Gate, Drammen PED Relevant Case Study Compare
Dietenbach, Freiburg im Breisgau PED Relevant Case Study Compare
SmartEnCity, Lecce SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study Compare
STARDUST, Trento STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study / PED Lab Compare
Klimatkontrakt Hyllie, Malmö PED Relevant Case Study Compare
EnStadt:Pfaff, Kaiserslautern PED Relevant Case Study / PED Lab Compare
mySMARTlife, Helsinki PED Relevant Case Study Compare
REPLICATE (pilot action in the Novoli-Cascine district on “le PIagge” buildings), Firenze PED Relevant Case Study Compare
Sinfonia, Bolzano PED Relevant Case Study Compare
Hunziker Areal, Zürich PED Relevant Case Study Compare
Hammarby Sjöstad 2.0, PED Relevant Case Study Compare
Sharing Cities, Milano PED Relevant Case Study Compare
District Heating Pozo Barredo, Mieres PED Relevant Case Study Compare
Cityfied (demo Linero), Lund PED Relevant Case Study Compare
Smart Otaniemi, Espoo PED Relevant Case Study / PED Lab Compare
Zukunftsquartier, Vienna PED Case Study Compare
Santa Chiara Open Lab, Trento PED Case Study Compare
Barrio La Pinada, Paterna PED Case Study / PED Lab Compare
Zero Village Bergen (ZVB) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Võru +CityxChange PED Case Study Compare
NTNU Campus within the Knowledge Axis, Trondheim ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Furuset project, Oslo ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Laser Valley – Land of Lights PED Case Study Compare
Ydalir project ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
NyBy – Ny Flyplass (New City – New Airport) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fornebu, Bærum ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fleuraye west, Carquefou PED Case Study Compare
Smart Energy Åland PED Case Study Compare
Romania, Alba Iulia PED ASCEND – Accelerate poSitive Clean ENergy Districts PED Case Study Compare
Romania, Alba Iulia PED InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Uncompare
Munich, Harthof district PED Case Study Compare
Lublin MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Compare
Bærum, Eiksveien 116 CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Compare
Findhorn, the Park InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Uncompare
Amsterdam, Buiksloterham PED ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities PED Case Study Uncompare
Schönbühel-Aggsbach, Schönbühel an der Donau PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Compare
Umeå, Ålidhem district PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Aalborg East PED Relevant Case Study / PED Lab Compare
Ankara, Çamlık District PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study / PED Relevant Case Study Compare
Trenčín MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Luxembourg, Betzdorf LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Vantaa, Aviapolis NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Vidin, Himik and Bononia MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Uncompare
Oslo, Verksbyen Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Uden, Loopkantstraat Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Relevant Case Study Compare
Zaragoza, Actur NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Relevant Case Study Compare
Aarhus, Brabrand BIPED – Building Intelligent Positive Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Riga, Ķīpsala, RTU smart student city ExPEDite – Enabling Positive Energy Districts through Digital Twins PED Case Study Uncompare
Izmir, District of Karşıyaka PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Istanbul, Ozyegin University Campus LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Espoo, Kera SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study / PED Relevant Case Study Compare
Borlänge, Rymdgatan’s Residential Portfolio PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Compare
Freiburg, Waldsee PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district PED Case Study Compare
Innsbruck, Campagne-Areal PED Relevant Case Study Compare
Graz, Reininghausgründe PED Case Study Compare
Stor-Elvdal, Campus Evenstad ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Relevant Case Study Compare
Oulu, Kaukovainio MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Halmstad, Fyllinge PED Relevant Case Study Uncompare
Lund, Brunnshög district PED Case Study Compare
Vienna, Am Kempelenpark PED Case Study Compare
Évora, Portugal POCITYF – A POsitive Energy CITY Transformation Framework PED Relevant Case Study / PED Lab Compare
Kladno, Sletiště (Sport Area), PED Winter Stadium SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study Compare
Groningen, PED South MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Groningen, PED North MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Maia, Sobreiro Social Housing SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Lab Compare
Lubia (Soria), CEDER-CIEMAT PED Lab Compare
Tampere, Ilokkaanpuisto district STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study Uncompare
Leon, Former Sugar Factory district MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Istanbul, Kadikoy district, Caferaga MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Espoo, Leppävaara district, Sello center SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Espoo, Espoonlahti district, Lippulaiva block SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Salzburg, Gneis district Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Barcelona, Santa Coloma de Gramenet Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Tartu, City centre area SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study / PED Lab Uncompare
Bologna, Pilastro-Roveri district GRETA – GReen Energy Transition Actions PED Relevant Case Study Compare
Barcelona, SEILAB & Energy SmartLab PED Lab Compare
Leipzig, Baumwollspinnerei district SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Kifissia, Energy community SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study
TitleKifissia, Energy community
Halmstad, Fyllinge
Tampere, Ilokkaanpuisto district
Riga, Ķīpsala, RTU smart student city
Vidin, Himik and Bononia
Tartu, City centre area
Romania, Alba Iulia PED
Amsterdam, Buiksloterham PED
Findhorn, the Park
A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED LabKifissia, Energy communityHalmstad, FyllingeTampere, Ilokkaanpuisto districtRiga, Ķīpsala, RTU smart student cityVidin, Himik and BononiaTartu, City centre areaRomania, Alba Iulia PEDAmsterdam, Buiksloterham PEDFindhorn, the Park
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P003: Categorisation of the PED site
PED case studynononoyesyesnoyesyesyes
PED relevant case studyyesyesyesnonoyesnonono
PED Lab.nononononoyesnonono
A1P004: Targets of the PED case study / PED Lab
Climate neutralitynonoyesyesyesyesyesyesyes
Annual energy surplusnonononoyesnoyesyesyes
Energy communityyesyesyesyesnonoyesyesyes
Circularitynononononoyesnoyesyes
Air quality and urban comfortyesnononononoyesnono
Electrificationyesnoyesnonoyesyesyesyes
Net-zero energy costnonononononononono
Net-zero emissionnonoyesnonoyesnoyesyes
Self-sufficiency (energy autonomous)nonoyesyesnonoyesnono
Maximise self-sufficiencynononoyesnoyesyesnoyes
Othernonononononononono
Other (A1P004)
A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED LabPlanning PhasePlanning PhaseCompletedPlanning PhasePlanning PhaseImplementation PhaseImplementation PhaseImplementation PhaseIn operation
A1P006: Start Date
A1P006: Start date01/2104/1401/2412/1802/1601/2411/1901/62
A1P007: End Date
A1P007: End date01/3010/2312/2612/3007/2212/2610/25
A1P008: Reference Project
A1P008: Reference Project
A1P009: Data availability
A1P009: Data availability
  • General statistical datasets
  • Monitoring data available within the districts,
  • Open data city platform – different dashboards,
  • Meteorological open data
  • Monitoring data available within the districts,
  • Meteorological open data,
  • General statistical datasets,
  • GIS open datasets
  • Monitoring data available within the districts,
  • Open data city platform – different dashboards
  • Monitoring data available within the districts,
  • General statistical datasets,
  • GIS open datasets
  • Monitoring data available within the districts
  • Monitoring data available within the districts,
  • Meteorological open data
A1P009: Otherhttps://smartcity-atelier.eu/about/lighthouse-cities/amsterdam/
A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
      • None yet, but coming
        • Historical sources,
        • GIS of the municipality,
        • Basic BEMs
            A1P011: Geographic coordinates
            X Coordinate (longitude):23.81458812.9205423.79808324.0816833922.882626.72273723.5801120980232354.9041-3.6099
            Y Coordinate (latitude):38.07734956.6519461.46408856.9524595643.993658.38071346.07701527868011552.367657.6530
            A1P012: Country
            A1P012: CountryGreeceSwedenFinlandLatviaBulgariaEstoniaRomaniaNetherlandsUnited Kingdom
            A1P013: City
            A1P013: CityMunicipality of KifissiaHalmstadTampereRigaVidinTartuAlba IuliaAmsterdamFindhorn
            A1P014: Climate Zone (Köppen Geiger classification)
            A1P014: Climate Zone (Köppen Geiger classification).CsaDwbDfbCfbCfaDfbDfbCfbDwc
            A1P015: District boundary
            A1P015: District boundaryVirtualGeographicVirtualGeographicGeographicFunctionalFunctionalFunctionalGeographic
            OtherThe energy will be produced by a PV plant installed on the terrace of a municipal building. Members of the energy community (that is under formation) will benefit from the energy produced via virtual net metering. PV instalment and the buildings (owned by the members of the community) will be within the boundaries of the Municipality but not necessary in the same area/district/neighbourhoodGeographic
            A1P016: Ownership of the case study/PED Lab
            A1P016: Ownership of the case study/PED Lab:MixedMixedPublicMixedPrivatePublicMixedMixed
            A1P017: Ownership of the land / physical infrastructure
            A1P017: Ownership of the land / physical infrastructure:Multiple OwnersMultiple OwnersMultiple OwnersMultiple OwnersMultiple OwnersSingle OwnerMultiple OwnersMultiple Owners
            A1P018: Number of buildings in PED
            A1P018: Number of buildings in PED2506157418660160
            A1P019: Conditioned space
            A1P019: Conditioned space [m²]9.00017000098759.533521728500
            A1P020: Total ground area
            A1P020: Total ground area [m²]25.000119264195234.807931448423.45180000
            A1P021: Floor area ratio: Conditioned space / total ground area
            A1P021: Floor area ratio: Conditioned space / total ground area000110000
            A1P022: Financial schemes
            A1P022a: Financing - PRIVATE - Real estatenoyesyesnonoyesnoyesyes
            A1P022a: Add the value in EUR if available [EUR]6500000
            A1P022b: Financing - PRIVATE - ESCO schemenonononononononono
            A1P022b: Add the value in EUR if available [EUR]
            A1P022c: Financing - PRIVATE - Othernonoyesnononononono
            A1P022c: Add the value in EUR if available [EUR]
            A1P022d: Financing - PUBLIC - EU structural fundingnononononoyesyesnono
            A1P022d: Add the value in EUR if available [EUR]4000000
            A1P022e: Financing - PUBLIC - National fundingnonoyesnoyesyesyesnoyes
            A1P022e: Add the value in EUR if available [EUR]8000000
            A1P022f: Financing - PUBLIC - Regional fundingnonononononoyesnono
            A1P022f: Add the value in EUR if available [EUR]
            A1P022g: Financing - PUBLIC - Municipal fundingnonononononoyesnono
            A1P022g: Add the value in EUR if available [EUR]
            A1P022h: Financing - PUBLIC - Othernonononononononono
            A1P022h: Add the value in EUR if available [EUR]
            A1P022i: Financing - RESEARCH FUNDING - EUnoyesyesyesnononoyesyes
            A1P022i: Add the value in EUR if available [EUR]7500000
            A1P022j: Financing - RESEARCH FUNDING - Nationalnonononononononono
            A1P022j: Add the value in EUR if available [EUR]
            A1P022k: Financing - RESEARCH FUNDING - Local/regionalnonononononononono
            A1P022k: Add the value in EUR if available [EUR]
            A1P022l: Financing - RESEARCH FUNDING - Othernonononononononono
            A1P022l: Add the value in EUR if available [EUR]
            A1P022: Other
            A1P023: Economic Targets
            A1P023: Economic Targets
            • Boosting local and sustainable production
            • Boosting local and sustainable production
            • Boosting local businesses,
            • Boosting local and sustainable production
            • Positive externalities
            • Job creation,
            • Positive externalities,
            • Other
            • Boosting local businesses,
            • Boosting local and sustainable production,
            • Boosting consumption of local and sustainable products
            A1P023: OtherBoosting sustainability for public schools
            A1P024: More comments:
            A1P024: More comments:
            A1P025: Estimated PED case study / PED LAB costs
            A1P025: Estimated PED case study / PED LAB costs [mil. EUR]253.5
            Contact person for general enquiries
            A1P026: NameArtemis Giavasoglou, Kleopatra KalampokaMarkus OlofsgårdSenior Scientist Terttu VainioJudith StiekemaDaniela KostovaJaanus TammTudor DrâmbăreanOmar ShafqatStefano Nebiolo
            A1P027: OrganizationMunicipality of Kifissia – SPARCS local teamAFRYVTT Technical Research Centre of FinlandOASCGreen Synergy ClusterTartu City GovernmentMunicipality of Alba IuliaAmsterdam University of Applied SciencesFindhorn Innovation Research and Education CIC
            A1P028: AffiliationMunicipality / Public BodiesOtherResearch Center / UniversityOtherOtherMunicipality / Public BodiesMunicipality / Public BodiesResearch Center / UniversityResearch Center / University
            A1P028: Othernot for profit private organisationClusterMaria Elena Seemann
            A1P029: Emailgiavasoglou@kifissia.grmarkus.olofsgard@afry.comterttu.vainio@vtt.fijudith@oascities.orgdaniela@greensynergycluster.euJaanus.tamm@tartu.eetudor.drambarean@apulum.roo.shafqat@hva.nlstefanonebiolo@gmail.com
            Contact person for other special topics
            A1P030: NameStavros Zapantis - vice mayorKaspar AlevMaria-Elena SeemannOmar Shafqat
            A1P031: Emailstavros.zapantis@gmail.comKaspar.alev@tartu.eemaria.seemann@apulum.roapulo.shafqat@hva.nl
            Pursuant to the General Data Protection RegulationYesYesYesYesYesYesYesYes
            A2P001: Fields of application
            A2P001: Fields of application
            • Energy production
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies
            • Energy efficiency,
            • Energy production,
            • Digital technologies
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies
            • Energy efficiency,
            • Energy production
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Urban comfort (pollution, heat island, noise level etc.),
            • Digital technologies,
            • Indoor air quality
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Urban comfort (pollution, heat island, noise level etc.),
            • Digital technologies,
            • Construction materials
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies,
            • Water use,
            • Waste management,
            • Construction materials
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Waste management
            A2P001: Other
            A2P002: Tools/strategies/methods applied for each of the above-selected fields
            A2P002: Tools/strategies/methods applied for each of the above-selected fieldslink based regulation of electricity gridEnergy efficiency: - A-class buildings - Heating by GSHP Energy production: - Installation of photovoltaic (PV) Digital technologies: - Smart control and monitoring of HVAC and indoor circumstances E-mobility - Installation of charging stations for electric vehicles;A suite of replicable modeling tools will enable stakeholders to analyze planning actions towards positive energy in a cost-effective fashion, aiding their evidence based decision-making process. The tools will be able to model the district’s energy production and demand, optimize for flexibility and simulate mobility and transport. By employing gamification and co-creation approaches, the project will enhance public awareness and engagement in energy efficiency. The project will culminate in the publication of practical guidelines, reusable models, algorithms, and training materials to aid other cities to replicate the digital twin for their districts, fostering widespread adoption of sustainable energy practices.Energy efficiency: - buildings retrofitting - combined public and private financing - low temperature central heating - LED lighting Energy production: - installation of photovoltaic (PV) systems for renewable on-site energy production; Digital technologies: - smart-meters smart home system. Smart city information platform E-mobility - Installation of new charging stations for electric vehicles; - e-bike/bikesharing services implementation. Urban comfort and air quality - Control units for air pollutants concentration (PM2.5, PM10, NO2) - Sustainable Energy and Climate Action Plan - SECAP)Thermal rehabilitation of the main building, and investments in the energy efficiency and consumption fields.City vision, Innovation Ateliers
            A2P003: Application of ISO52000
            A2P003: Application of ISO52000NoNoNoNoNoYesYes
            A2P004: Appliances included in the calculation of the energy balance
            A2P004: Appliances included in the calculation of the energy balanceNoYesYesNoYesYesNo
            A2P005: Mobility included in the calculation of the energy balance
            A2P005: Mobility included in the calculation of the energy balanceYesNoYesYesNoNoNo
            A2P006: Description of how mobility is included (or not included) in the calculation
            A2P006: Description of how mobility is included (or not included) in the calculationThe university operates a fleet of 13 electric vehicles (EV) (61kW power each). There are 5 EV charging stations on campus.There will be 1 EV station placed nearby the main building. This would be the link to the mobility field.
            A2P007: Annual energy demand in buildings / Thermal demand
            A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum]080009.10.982
            A2P008: Annual energy demand in buildings / Electric Demand
            A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum]0.750000.0484411.2
            A2P009: Annual energy demand for e-mobility
            A2P009: Annual energy demand for e-mobility [GWh/annum]
            A2P010: Annual energy demand for urban infrastructure
            A2P010: Annual energy demand for urban infrastructure [GWh/annum]
            A2P011: Annual renewable electricity production on-site during target year
            A2P011: PVyesyesyesnonoyesyesyesyes
            A2P011: PV - specify production in GWh/annum [GWh/annum]0.7
            A2P011: Windnononoyesnonononoyes
            A2P011: Wind - specify production in GWh/annum [GWh/annum]
            A2P011: Hydrononononononononono
            A2P011: Hydro - specify production in GWh/annum [GWh/annum]
            A2P011: Biomass_elnononononononoyesno
            A2P011: Biomass_el - specify production in GWh/annum [GWh/annum]
            A2P011: Biomass_peat_elnonononononononono
            A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum]
            A2P011: PVT_elnononoyesnonononono
            A2P011: PVT_el - specify production in GWh/annum [GWh/annum]
            A2P011: Othernonononononononono
            A2P011: Other - specify production in GWh/annum [GWh/annum]
            A2P012: Annual renewable thermal production on-site during target year
            A2P012: Geothermalnoyesyesnonononoyesno
            A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum]
            A2P012: Solar Thermalnononononoyesnonoyes
            A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum]0.5
            A2P012: Biomass_heatnononoyesnononoyesyes
            A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum]
            A2P012: Waste heat+HPnononononononoyesyes
            A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum]
            A2P012: Biomass_peat_heatnonononononononono
            A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum]
            A2P012: PVT_thnonononononononono
            A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum]
            A2P012: Biomass_firewood_thnonononononononoyes
            A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum]
            A2P012: Othernonononononoyesnono
            A2P012 - Other: Please specify production in GWh/annum [GWh/annum]
            A2P013: Renewable resources on-site - Additional notes
            A2P013: Renewable resources on-site - Additional notesPV plant of energy community locates outside of the city, not on the slotConventional power generation: The university’s heat supply is designed as a local centralized heat supply system. Electrical power, generated in combined heat and power (CHP) units, is delivered to the distribution network and sold to energy traders as regulated by local legislation and norms. There are two natural gas burners acting as heat sources (3MW and 6MW capacity), and two CHP units (1.6MW and 0.45MW thermal capacity). All heating is supplied from the CHP plants. Renewable Energy Sources (RES): a wind turbine (3.6 kW) and PV panels (11.7 kW) are connected to the faculty microgrid. In the future it is planned to power the campus entirely from local RES.Only PVs - 940 PVs on the main building3x225 kW wind turbines + 100 kW PV
            A2P014: Annual energy use
            A2P014: Annual energy use [GWh/annum]0.70.0000484411.2
            A2P015: Annual energy delivered
            A2P015: Annual energy delivered [GWh/annum]0.0001133311.2
            A2P016: Annual non-renewable electricity production on-site during target year
            A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum]00
            A2P017: Annual non-renewable thermal production on-site during target year
            A2P017: Gasnononoyesnononoyesno
            A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Coalnononononononoyesno
            A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Oilnononononononoyesno
            A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Othernonononononoyesnono
            A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P018: Annual renewable electricity imports from outside the boundary during target year
            A2P018: PVnononononononoyesno
            A2P018 - PV: specify production in GWh/annum if available [GWh/annum]
            A2P018: Windnononononononoyesno
            A2P018 - Wind: specify production in GWh/annum if available [GWh/annum]
            A2P018: Hydronononononononoyesno
            A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum]
            A2P018: Biomass_elnononononononoyesno
            A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: Biomass_peat_elnononononononoyesno
            A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: PVT_elnononononononoyesno
            A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: Othernonononononoyesnono
            A2P018 - Other: specify production in GWh/annum if available [GWh/annum]
            A2P019: Annual renewable thermal imports from outside the boundary during target year
            A2P019: Geothermalnononononononoyesno
            A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Solar Thermalnononononononoyesno
            A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_heatnononononononoyesno
            A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Waste heat+HPnononononononoyesno
            A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_peat_heatnononononononoyesno
            A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum]
            A2P019: PVT_thnononononononoyesno
            A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_firewood_thnononononononoyesno
            A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Othernonononononoyesnono
            A2P019 Other: Please specify imports in GWh/annum [GWh/annum]
            A2P020: Share of RES on-site / RES outside the boundary
            A2P020: Share of RES on-site / RES outside the boundary000000000
            A2P021: GHG-balance calculated for the PED
            A2P021: GHG-balance calculated for the PED [tCO2/annum]0980250
            A2P022: KPIs related to the PED case study / PED Lab
            A2P022: Safety & Securityyes
            A2P022: Healthyes
            A2P022: Educationyes
            A2P022: Mobilityyes
            A2P022: Energyyes
            A2P022: Wateryes
            A2P022: Economic developmentyes
            A2P022: Housing and Community
            A2P022: Waste
            A2P022: Other
            A2P023: Technological Solutions / Innovations - Energy Generation
            A2P023: Photovoltaicsnoyesyesnoyesyesyesyesyes
            A2P023: Solar thermal collectorsnonononononoyesnoyes
            A2P023: Wind Turbinesnonononononononoyes
            A2P023: Geothermal energy systemnonoyesnoyesnonoyesno
            A2P023: Waste heat recoverynonoyesnonononoyesyes
            A2P023: Waste to energynononononononoyesno
            A2P023: Polygenerationnonononononoyesnono
            A2P023: Co-generationnonononononoyesnono
            A2P023: Heat Pumpnonoyesnoyesnoyesyesyes
            A2P023: Hydrogennonononononononono
            A2P023: Hydropower plantnonononononononono
            A2P023: Biomassnononononoyesnoyesyes
            A2P023: Biogasnononononoyesnoyesno
            A2P023: Other
            A2P024: Technological Solutions / Innovations - Energy Flexibility
            A2P024: A2P024: Information and Communication Technologies (ICT)noyesyesyesnoyesyesyesno
            A2P024: Energy management systemnonoyesyesnoyesyesyesyes
            A2P024: Demand-side managementnoyesyesyesnonoyesyesno
            A2P024: Smart electricity gridnoyesnoyesnonoyesyesno
            A2P024: Thermal Storagenononoyesnononoyesyes
            A2P024: Electric Storagenononoyesyesnoyesyesyes
            A2P024: District Heating and Coolingnononoyesnoyesnoyesyes
            A2P024: Smart metering and demand-responsive control systemsnoyesyesyesnonoyesyesno
            A2P024: P2P – buildingsnonononononoyesyesno
            A2P024: OtherElectric grid as virtual battery
            A2P025: Technological Solutions / Innovations - Energy Efficiency
            A2P025: Deep Retrofittingnonononoyesyesyesyesno
            A2P025: Energy efficiency measures in historic buildingsnononononononoyesno
            A2P025: High-performance new buildingsnonoyesnonononoyesyes
            A2P025: Smart Public infrastructure (e.g. smart lighting)nononononoyesyesyesno
            A2P025: Urban data platformsnononoyesnoyesyesyesno
            A2P025: Mobile applications for citizensnonoyesyesnoyesnoyesno
            A2P025: Building services (HVAC & Lighting)nonoyesyesnonoyesyesno
            A2P025: Smart irrigationnononononononoyesno
            A2P025: Digital tracking for waste disposalnononononononoyesno
            A2P025: Smart surveillancenononononoyesnonono
            A2P025: Other
            A2P026: Technological Solutions / Innovations - Mobility
            A2P026: Efficiency of vehicles (public and/or private)nononononoyesyesyesno
            A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances)nononononoyesyesyesno
            A2P026: e-Mobilitynononononoyesyesyesyes
            A2P026: Soft mobility infrastructures and last mile solutionsnononononononoyesno
            A2P026: Car-free areanononononononoyesno
            A2P026: Other
            A2P027: Mobility strategies - Additional notes
            A2P027: Mobility strategies - Additional notesThe new mobility plan integrates the PED area
            A2P028: Energy efficiency certificates
            A2P028: Energy efficiency certificatesNoYesNoYesYes
            A2P028: If yes, please specify and/or enter notesEnergy Performance Certificate - in Greece it is mandatory in order to buy or rent a house or a dwelling
            A2P029: Any other building / district certificates
            A2P029: Any other building / district certificatesNoNoNoYes
            A2P029: If yes, please specify and/or enter notes
            A3P001: Relevant city /national strategy
            A3P001: Relevant city /national strategy
            • Energy master planning (SECAP, etc.),
            • Promotion of energy communities (REC/CEC)
            • Promotion of energy communities (REC/CEC)
            • Smart cities strategies,
            • Energy master planning (SECAP, etc.),
            • Promotion of energy communities (REC/CEC),
            • Climate change adaption plan/strategy (e.g. Climate City contract),
            • National / international city networks addressing sustainable urban development and climate neutrality
            • Smart cities strategies,
            • Promotion of energy communities (REC/CEC),
            • Climate change adaption plan/strategy (e.g. Climate City contract),
            • National / international city networks addressing sustainable urban development and climate neutrality
            • Energy master planning (SECAP, etc.),
            • New development strategies
            • Energy master planning (SECAP, etc.)
            • Smart cities strategies,
            • Urban Renewal Strategies,
            • Energy master planning (SECAP, etc.),
            • New development strategies,
            • Promotion of energy communities (REC/CEC),
            • Climate change adaption plan/strategy (e.g. Climate City contract),
            • National / international city networks addressing sustainable urban development and climate neutrality
            • Smart cities strategies,
            • Energy master planning (SECAP, etc.),
            • New development strategies,
            • Promotion of energy communities (REC/CEC),
            • Climate change adaption plan/strategy (e.g. Climate City contract),
            • National / international city networks addressing sustainable urban development and climate neutrality
            A3P002: Quantitative targets included in the city / national strategy
            A3P002: Quantitative targets included in the city / national strategy40% reduction in emissions by 2030 according to the Covenant of Mayors
            A3P003: Strategies towards decarbonization of the gas grid
            A3P003: Strategies towards decarbonization of the gas grid
            • Biogas,
            • Hydrogen
            • Electrification of Heating System based on Heat Pumps
            • Electrification of Heating System based on Heat Pumps,
            • Electrification of Cooking Methods,
            • Biogas,
            • Hydrogen
            • Electrification of Heating System based on Heat Pumps
            A3P003: Other
            A3P004: Identification of needs and priorities
            A3P004: Identification of needs and priorities- Thermal rehabilitation - Heat pumps - Smart system capable o various connections and data export - Usage of the energy produced by PVs placed on 3 buildings within the PED
            A3P005: Sustainable behaviour
            A3P005: Sustainable behaviour- Education - Replacement of the non-performant PVs - Professional maintenance of the PV system - Reduce of consumptions - Intelligent systems to recover heat - Intelligent system to permit the usage of domestic water from the heating system
            A3P006: Economic strategies
            A3P006: Economic strategies
            • Local trading
            • Open data business models,
            • Circular economy models
            • Open data business models,
            • Innovative business models,
            • Demand management Living Lab
            • Innovative business models,
            • PPP models,
            • Life Cycle Cost,
            • Existing incentives
            • Open data business models,
            • Innovative business models,
            • Life Cycle Cost,
            • Circular economy models,
            • Demand management Living Lab
            • Innovative business models,
            • Life Cycle Cost,
            • Circular economy models,
            • Demand management Living Lab,
            • Local trading,
            • Existing incentives
            A3P006: Other
            A3P007: Social models
            A3P007: Social models
            • Behavioural Change / End-users engagement,
            • Citizen/owner involvement in planning and maintenance
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Quality of Life,
            • Prevention of energy poverty
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Citizen Social Research,
            • Policy Forums,
            • Social incentives,
            • Quality of Life,
            • Prevention of energy poverty,
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Citizen Social Research,
            • Policy Forums,
            • Social incentives,
            • Quality of Life,
            • Strategies towards social mix,
            • Affordability,
            • Prevention of energy poverty,
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Citizen Social Research,
            • Social incentives,
            • Quality of Life,
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Quality of Life
            A3P007: Other
            A3P008: Integrated urban strategies
            A3P008: Integrated urban strategies
            • Strategic urban planning
            • Strategic urban planning,
            • Digital twinning and visual 3D models,
            • SECAP Updates
            • Digital twinning and visual 3D models
            • Strategic urban planning,
            • City Vision 2050,
            • SECAP Updates
            • Strategic urban planning,
            • City Vision 2050,
            • SECAP Updates
            • Strategic urban planning,
            • District Energy plans,
            • City Vision 2050,
            • SECAP Updates,
            • Building / district Certification
            • Strategic urban planning,
            • Digital twinning and visual 3D models,
            • District Energy plans,
            • City Vision 2050,
            • SECAP Updates,
            • Building / district Certification
            A3P008: Other
            A3P009: Environmental strategies
            A3P009: Environmental strategies
            • Energy Neutral,
            • Carbon-free
            • Energy Neutral,
            • Net zero carbon footprint,
            • Carbon-free,
            • Greening strategies,
            • Sustainable Urban drainage systems (SUDS),
            • Nature Based Solutions (NBS)
            • Energy Neutral
            • Pollutants Reduction,
            • Greening strategies
            • Net zero carbon footprint,
            • Carbon-free,
            • Pollutants Reduction,
            • Greening strategies,
            • Sustainable Urban drainage systems (SUDS),
            • Nature Based Solutions (NBS)
            • Energy Neutral,
            • Low Emission Zone,
            • Net zero carbon footprint,
            • Carbon-free,
            • Life Cycle approach,
            • Pollutants Reduction,
            • Greening strategies,
            • Sustainable Urban drainage systems (SUDS),
            • Cool Materials,
            • Nature Based Solutions (NBS)
            • Energy Neutral,
            • Life Cycle approach
            • Energy Neutral,
            • Net zero carbon footprint
            A3P009: Other
            A3P010: Legal / Regulatory aspects
            A3P010: Legal / Regulatory aspectsRegulatory sandbox
            B1P001: PED/PED relevant concept definition
            B1P001: PED/PED relevant concept definitionExPEDite aims at creating and deploying a novel digital twin, allowing for real-time monitoring, visualization and management of district-level energy flows. Cities consume 65% of the world’s energy supply and are responsible for 70% of the CO² emissions, hence sharing a lot of the responsibility for climate change. We are faced with the challenge of redesigning our existing cities to make them more sustainable, resilient, inclusive and safe. Developing Positive Energy Districts (PEDs), is a breakthrough way to deal with the issue of urban emissions and applying adaptation and mitigation strategies to climate change, while ensuring that these urban areas generate an annual surplus of renewable energy and net zero greenhouse gas emissions. PEDs must address environmental, economic and social issues, providing solutions to energy consumption, production, emissions, transport & mobility and livability. By constantly monitoring and evaluating parameters through existing and/or novel sensor systems (e.g., renewable energy production/supply, transport conditions, air quality, energy demand, meteorological conditions, etc.), unconventional techniques may be applied to provide more sustainable options for the district’s needs.Positive energy districtFunctional PED
            B1P002: Motivation behind PED/PED relevant project development
            B1P002: Motivation behind PED/PED relevant project developmentExpected outcome 1 Increased number of (tangible) city planning actions for positive clean energy districts using the (proto-)PED design, development and management digital twin tools (based on pre-market research learnings) using open-standards based components which can be reused elsewhere. 2 Increased integration of existing smaller scale management systems (e.g. Building management systems) with open-standards based operational city platforms using sectorial data (e.g. building data, mobility, urban planning, etc.). 3 Enhanced data gathering approaches with identification of relevant multidimensional data sets (e.g. meteorological, load profile, social, geo-spatial, etc.) high-resolution real-time data streams (e.g. renewable energy production, energy consumption), and relevant forecasting data, drawing also on the work of common European data spaces. 4 Increased number of city planning departments / approaches using common data and (replicable) elements and processes. 5 Consolidated city sensor network specifications, complemented by appropriate data gathering approaches for soft data. 6 Improved performance of AI based self-learning systems for optimization of positive clean energy districts and bottom-up complex models. 7 Enhanced innovation capacity of local/regional administrations and accelerated uptake of shared, smart and sustainable zero emission solutions.Creation of an area which aims to be sustainable in terms of energy sufficiency and efficiency.Brown field development of a former industrial neighbourhood into a low-carbon, smart Positive Energy District with mixed uses.
            B1P003: Environment of the case study area
            B2P003: Environment of the case study areaSuburban areaSuburban areaUrban areaUrban areaUrban areaUrban areaUrban areaRural
            B1P004: Type of district
            B2P004: Type of district
            • New construction
            • New construction
            • Renovation
            • Renovation
            • Renovation
            • New construction
            • New construction
            B1P005: Case Study Context
            B1P005: Case Study Context
            • New Development
            • New Development
            • Retrofitting Area
            • Retrofitting Area
            • Retrofitting Area
            • New Development
            • New Development
            B1P006: Year of construction
            B1P006: Year of construction1976
            B1P007: District population before intervention - Residential
            B1P007: District population before intervention - Residential04500
            B1P008: District population after intervention - Residential
            B1P008: District population after intervention - Residential300
            B1P009: District population before intervention - Non-residential
            B1P009: District population before intervention - Non-residential
            B1P010: District population after intervention - Non-residential
            B1P010: District population after intervention - Non-residential
            B1P011: Population density before intervention
            B1P011: Population density before intervention000000000
            B1P012: Population density after intervention
            B1P012: Population density after intervention0012000000
            B1P013: Building and Land Use before intervention
            B1P013: Residentialnonononoyesyesnonono
            B1P013 - Residential: Specify the sqm [m²]64 787,57
            B1P013: Officenonononononononono
            B1P013 - Office: Specify the sqm [m²]
            B1P013: Industry and Utilitynononononononoyesno
            B1P013 - Industry and Utility: Specify the sqm [m²]
            B1P013: Commercialnonononoyesyesnonono
            B1P013 - Commercial: Specify the sqm [m²]262,33
            B1P013: Institutionalnonononononoyesnono
            B1P013 - Institutional: Specify the sqm [m²]
            B1P013: Natural areasnoyesyesnonoyesnonoyes
            B1P013 - Natural areas: Specify the sqm [m²]
            B1P013: Recreationalnononononoyesnonono
            B1P013 - Recreational: Specify the sqm [m²]
            B1P013: Dismissed areasnonononononononono
            B1P013 - Dismissed areas: Specify the sqm [m²]
            B1P013: Othernonononononononono
            B1P013 - Other: Specify the sqm [m²]
            B1P014: Building and Land Use after intervention
            B1P014: Residentialnonoyesnonoyesnoyesyes
            B1P014 - Residential: Specify the sqm [m²]
            B1P014: Officenononononononoyesyes
            B1P014 - Office: Specify the sqm [m²]
            B1P014: Industry and Utilitynonononononononono
            B1P014 - Industry and Utility: Specify the sqm [m²]
            B1P014: Commercialnononononoyesnoyesno
            B1P014 - Commercial: Specify the sqm [m²]
            B1P014: Institutionalnonononoyesnoyesnono
            B1P014 - Institutional: Specify the sqm [m²]35322.21
            B1P014: Natural areasnononononoyesnonoyes
            B1P014 - Natural areas: Specify the sqm [m²]
            B1P014: Recreationalnononononoyesnoyesno
            B1P014 - Recreational: Specify the sqm [m²]
            B1P014: Dismissed areasnonononononononono
            B1P014 - Dismissed areas: Specify the sqm [m²]
            B1P014: Othernonononononononono
            B1P014 - Other: Specify the sqm [m²]
            B2P001: PED Lab concept definition
            B2P001: PED Lab concept definition
            B2P002: Installation life time
            B2P002: Installation life time
            B2P003: Scale of action
            B2P003: ScaleDistrict
            B2P004: Operator of the installation
            B2P004: Operator of the installation
            B2P005: Replication framework: Applied strategy to reuse and recycling the materials
            B2P005: Replication framework: Applied strategy to reuse and recycling the materials
            B2P006: Circular Economy Approach
            B2P006: Do you apply any strategy to reuse and recycling the materials?No
            B2P006: Other
            B2P007: Motivation for developing the PED Lab
            B2P007: Motivation for developing the PED Lab
            • Strategic
            B2P007: Other
            B2P008: Lead partner that manages the PED Lab
            B2P008: Lead partner that manages the PED LabMunicipality
            B2P008: Other
            B2P009: Collaborative partners that participate in the PED Lab
            B2P009: Collaborative partners that participate in the PED Lab
            • Academia,
            • Private,
            • Industrial,
            • Citizens, public, NGO
            B2P009: Other
            B2P010: Synergies between the fields of activities
            B2P010: Synergies between the fields of activities
            B2P011: Available facilities to test urban configurations in PED Lab
            B2P011: Available facilities to test urban configurations in PED Lab
            • Buildings,
            • Prosumers,
            • Renewable generation,
            • Energy networks,
            • Lighting,
            • E-mobility,
            • Green areas,
            • User interaction/participation,
            • Information and Communication Technologies (ICT)
            B2P011: Other
            B2P012: Incubation capacities of PED Lab
            B2P012: Incubation capacities of PED Lab
            • Monitoring and evaluation infrastructure,
            • Pivoting and risk-mitigating measures
            B2P013: Availability of the facilities for external people
            B2P013: Availability of the facilities for external people
            B2P014: Monitoring measures
            B2P014: Monitoring measures
            • Available data,
            • Life Cycle Analysis
            B2P015: Key Performance indicators
            B2P015: Key Performance indicators
            • Energy,
            • Sustainability,
            • Social,
            • Economical / Financial
            B2P016: Execution of operations
            B2P016: Execution of operations
            B2P017: Capacities
            B2P017: Capacities
            B2P018: Relations with stakeholders
            B2P018: Relations with stakeholders
            B2P019: Available tools
            B2P019: Available tools
            • Social models
            B2P019: Available tools
            B2P020: External accessibility
            B2P020: External accessibility
            C1P001: Unlocking Factors
            C1P001: Recent technological improvements for on-site RES production5 - Very important3 - Moderately important4 - Important5 - Very important4 - Important3 - Moderately important4 - Important4 - Important1 - Unimportant
            C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock5 - Very important1 - Unimportant3 - Moderately important5 - Very important5 - Very important4 - Important4 - Important5 - Very important1 - Unimportant
            C1P001: Energy Communities, P2P, Prosumers concepts5 - Very important5 - Very important5 - Very important5 - Very important3 - Moderately important3 - Moderately important5 - Very important3 - Moderately important1 - Unimportant
            C1P001: Storage systems and E-mobility market penetration5 - Very important1 - Unimportant4 - Important4 - Important2 - Slightly important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P001: Decreasing costs of innovative materials4 - Important1 - Unimportant1 - Unimportant4 - Important2 - Slightly important3 - Moderately important1 - Unimportant3 - Moderately important1 - Unimportant
            C1P001: Financial mechanisms to reduce costs and maximize benefits4 - Important3 - Moderately important3 - Moderately important5 - Very important3 - Moderately important4 - Important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P001: The ability to predict Multiple Benefits2 - Slightly important5 - Very important5 - Very important3 - Moderately important3 - Moderately important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P001: The ability to predict the distribution of benefits and impacts4 - Important1 - Unimportant5 - Very important2 - Slightly important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)5 - Very important4 - Important2 - Slightly important5 - Very important5 - Very important4 - Important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P001: Social acceptance (top-down)5 - Very important4 - Important3 - Moderately important4 - Important4 - Important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)3 - Moderately important4 - Important5 - Very important5 - Very important5 - Very important3 - Moderately important2 - Slightly important2 - Slightly important1 - Unimportant
            C1P001: Presence of integrated urban strategies and plans3 - Moderately important5 - Very important5 - Very important4 - Important5 - Very important5 - Very important5 - Very important3 - Moderately important1 - Unimportant
            C1P001: Multidisciplinary approaches available for systemic integration3 - Moderately important4 - Important3 - Moderately important5 - Very important5 - Very important4 - Important2 - Slightly important4 - Important1 - Unimportant
            C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects4 - Important1 - Unimportant4 - Important5 - Very important5 - Very important5 - Very important5 - Very important4 - Important1 - Unimportant
            C1P001: Availability of RES on site (Local RES)5 - Very important5 - Very important4 - Important5 - Very important4 - Important4 - Important3 - Moderately important1 - Unimportant
            C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders4 - Important3 - Moderately important5 - Very important4 - Important4 - Important4 - Important5 - Very important2 - Slightly important1 - Unimportant
            C1P001: Any other UNLOCKING FACTORS1 - Unimportant5 - Very important3 - Moderately important5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P001: Any other UNLOCKING FACTORS (if any)
            C1P002: Driving Factors
            C1P002: Climate Change adaptation need4 - Important3 - Moderately important5 - Very important5 - Very important4 - Important5 - Very important5 - Very important5 - Very important1 - Unimportant
            C1P002: Climate Change mitigation need (local RES production and efficiency)5 - Very important3 - Moderately important5 - Very important4 - Important5 - Very important5 - Very important5 - Very important5 - Very important1 - Unimportant
            C1P002: Rapid urbanization trend and need of urban expansions1 - Unimportant2 - Slightly important5 - Very important4 - Important3 - Moderately important1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant
            C1P002: Urban re-development of existing built environment3 - Moderately important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important3 - Moderately important2 - Slightly important5 - Very important1 - Unimportant
            C1P002: Economic growth need2 - Slightly important1 - Unimportant3 - Moderately important4 - Important5 - Very important2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant
            C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)3 - Moderately important1 - Unimportant3 - Moderately important4 - Important4 - Important4 - Important2 - Slightly important4 - Important1 - Unimportant
            C1P002: Territorial and market attractiveness2 - Slightly important1 - Unimportant3 - Moderately important4 - Important5 - Very important3 - Moderately important5 - Very important4 - Important1 - Unimportant
            C1P002: Energy autonomy/independence5 - Very important2 - Slightly important4 - Important4 - Important2 - Slightly important4 - Important5 - Very important2 - Slightly important1 - Unimportant
            C1P002: Any other DRIVING FACTOR1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P002: Any other DRIVING FACTOR (if any)
            C1P003: Administrative barriers
            C1P003: Difficulty in the coordination of high number of partners and authorities4 - Important1 - Unimportant4 - Important4 - Important1 - Unimportant4 - Important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P003: Lack of good cooperation and acceptance among partners3 - Moderately important1 - Unimportant1 - Unimportant4 - Important5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P003: Lack of public participation3 - Moderately important1 - Unimportant1 - Unimportant4 - Important5 - Very important1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant
            C1P003: Lack of institutions/mechanisms to disseminate information3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant
            C1P003:Long and complex procedures for authorization of project activities5 - Very important1 - Unimportant5 - Very important3 - Moderately important5 - Very important5 - Very important5 - Very important1 - Unimportant1 - Unimportant
            C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy4 - Important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important4 - Important5 - Very important1 - Unimportant1 - Unimportant
            C1P003: Complicated and non-comprehensive public procurement4 - Important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important4 - Important4 - Important1 - Unimportant1 - Unimportant
            C1P003: Fragmented and or complex ownership structure3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important5 - Very important1 - Unimportant2 - Slightly important1 - Unimportant
            C1P003: City administration & cross-sectoral attitude/approaches (silos)3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important2 - Slightly important3 - Moderately important1 - Unimportant
            C1P003: Lack of internal capacities to support energy transition3 - Moderately important1 - Unimportant4 - Important3 - Moderately important5 - Very important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P003: Any other Administrative BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P003: Any other Administrative BARRIER (if any)
            C1P004: Policy barriers
            C1P004: Lack of long-term and consistent energy plans and policies4 - Important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant
            C1P004: Lacking or fragmented local political commitment and support on the long term4 - Important4 - Important1 - Unimportant1 - Unimportant5 - Very important2 - Slightly important4 - Important1 - Unimportant1 - Unimportant
            C1P004: Lack of Cooperation & support between national-regional-local entities3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important3 - Moderately important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P004: Any other Political BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P004: Any other Political BARRIER (if any)
            C1P005: Legal and Regulatory barriers
            C1P005: Inadequate regulations for new technologies4 - Important1 - Unimportant1 - Unimportant4 - Important5 - Very important4 - Important1 - Unimportant3 - Moderately important1 - Unimportant
            C1P005: Regulatory instability3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important4 - Important3 - Moderately important1 - Unimportant
            C1P005: Non-effective regulations4 - Important1 - Unimportant4 - Important3 - Moderately important4 - Important4 - Important2 - Slightly important2 - Slightly important1 - Unimportant
            C1P005: Unfavorable local regulations for innovative technologies3 - Moderately important1 - Unimportant1 - Unimportant4 - Important5 - Very important2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant
            C1P005: Building code and land-use planning hindering innovative technologies4 - Important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P005: Insufficient or insecure financial incentives4 - Important3 - Moderately important2 - Slightly important3 - Moderately important5 - Very important3 - Moderately important4 - Important3 - Moderately important1 - Unimportant
            C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation4 - Important1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important4 - Important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P005: Shortage of proven and tested solutions and examples1 - Unimportant2 - Slightly important3 - Moderately important1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P005: Any other Legal and Regulatory BARRIER1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P005: Any other Legal and Regulatory BARRIER (if any)laws favouring big energy companies
            C1P006: Environmental barriers
            C1P006: Environmental barriers
            C1P007: Technical barriers
            C1P007: Lack of skilled and trained personnel4 - Important1 - Unimportant1 - Unimportant4 - Important5 - Very important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant
            C1P007: Deficient planning3 - Moderately important3 - Moderately important1 - Unimportant4 - Important5 - Very important1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant
            C1P007: Retrofitting work in dwellings in occupied state4 - Important1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important5 - Very important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P007: Lack of well-defined process4 - Important1 - Unimportant4 - Important4 - Important5 - Very important3 - Moderately important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P007: Inaccuracy in energy modelling and simulation4 - Important5 - Very important1 - Unimportant1 - Unimportant5 - Very important2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant
            C1P007: Lack/cost of computational scalability4 - Important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P007: Grid congestion, grid instability4 - Important1 - Unimportant1 - Unimportant4 - Important2 - Slightly important2 - Slightly important2 - Slightly important5 - Very important1 - Unimportant
            C1P007: Negative effects of project intervention on the natural environment3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant
            C1P007: Energy retrofitting work in dense and/or historical urban environment5 - Very important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant
            C1P007: Difficult definition of system boundaries3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant5 - Very important1 - Unimportant3 - Moderately important1 - Unimportant
            C1P007: Any other Thecnical BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P007: Any other Thecnical BARRIER (if any)
            C1P008: Social and Cultural barriers
            C1P008: Inertia4 - Important1 - Unimportant3 - Moderately important3 - Moderately important3 - Moderately important4 - Important4 - Important1 - Unimportant1 - Unimportant
            C1P008: Lack of values and interest in energy optimization measurements5 - Very important1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant
            C1P008: Low acceptance of new projects and technologies5 - Very important1 - Unimportant1 - Unimportant4 - Important4 - Important2 - Slightly important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P008: Difficulty of finding and engaging relevant actors5 - Very important4 - Important5 - Very important3 - Moderately important4 - Important3 - Moderately important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P008: Lack of trust beyond social network4 - Important1 - Unimportant3 - Moderately important3 - Moderately important4 - Important2 - Slightly important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P008: Rebound effect4 - Important1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant
            C1P008: Hostile or passive attitude towards environmentalism5 - Very important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Exclusion of socially disadvantaged groups2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Non-energy issues are more important and urgent for actors3 - Moderately important1 - Unimportant5 - Very important3 - Moderately important5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Hostile or passive attitude towards energy collaboration1 - Unimportant4 - Important3 - Moderately important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Any other Social BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Any other Social BARRIER (if any)
            C1P009: Information and Awareness barriers
            C1P009: Insufficient information on the part of potential users and consumers5 - Very important3 - Moderately important3 - Moderately important5 - Very important3 - Moderately important3 - Moderately important4 - Important1 - Unimportant
            C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts1 - Unimportant3 - Moderately important3 - Moderately important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important1 - Unimportant
            C1P009: Lack of awareness among authorities3 - Moderately important1 - Unimportant3 - Moderately important5 - Very important2 - Slightly important3 - Moderately important1 - Unimportant1 - Unimportant
            C1P009: Information asymmetry causing power asymmetry of established actors2 - Slightly important3 - Moderately important3 - Moderately important2 - Slightly important3 - Moderately important3 - Moderately important4 - Important1 - Unimportant
            C1P009: High costs of design, material, construction, and installation1 - Unimportant5 - Very important3 - Moderately important5 - Very important5 - Very important5 - Very important3 - Moderately important1 - Unimportant
            C1P009: Any other Information and Awareness BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P009: Any other Information and Awareness BARRIER (if any)
            C1P010: Financial barriers
            C1P010: Hidden costs1 - Unimportant4 - Important4 - Important3 - Moderately important5 - Very important4 - Important3 - Moderately important1 - Unimportant
            C1P010: Insufficient external financial support and funding for project activities1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important5 - Very important5 - Very important1 - Unimportant1 - Unimportant
            C1P010: Economic crisis1 - Unimportant4 - Important3 - Moderately important5 - Very important3 - Moderately important4 - Important4 - Important1 - Unimportant
            C1P010: Risk and uncertainty2 - Slightly important5 - Very important3 - Moderately important5 - Very important4 - Important2 - Slightly important4 - Important1 - Unimportant
            C1P010: Lack of consolidated and tested business models4 - Important3 - Moderately important3 - Moderately important5 - Very important3 - Moderately important4 - Important3 - Moderately important1 - Unimportant
            C1P010: Limited access to capital and cost disincentives1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important4 - Important4 - Important1 - Unimportant1 - Unimportant
            C1P010: Any other Financial BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P010: Any other Financial BARRIER (if any)
            C1P011: Market barriers
            C1P011: Split incentives1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important4 - Important1 - Unimportant3 - Moderately important1 - Unimportant
            C1P011: Energy price distortion1 - Unimportant1 - Unimportant5 - Very important5 - Very important3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant
            C1P011: Energy market concentration, gatekeeper actors (DSOs)1 - Unimportant5 - Very important5 - Very important3 - Moderately important4 - Important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P011: Any other Market BARRIER1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant4 - Important1 - Unimportant
            C1P011: Any other Market BARRIER (if any)
            C1P012: Stakeholders involved
            C1P012: Government/Public Authorities
            • Design/demand aggregation
            • Planning/leading
            • Planning/leading
            • Planning/leading,
            • Monitoring/operation/management
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • Planning/leading
            • Monitoring/operation/management
            C1P012: Research & Innovation
            • Planning/leading,
            • Construction/implementation,
            • Monitoring/operation/management
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • None
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • Monitoring/operation/management
            C1P012: Financial/Funding
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Monitoring/operation/management
            • Construction/implementation,
            • Monitoring/operation/management
            • Design/demand aggregation,
            • Construction/implementation
            C1P012: Analyst, ICT and Big Data
            • Monitoring/operation/management
            • Design/demand aggregation,
            • Monitoring/operation/management
            • Planning/leading,
            • Monitoring/operation/management
            • None
            • Planning/leading,
            • Monitoring/operation/management
            • Construction/implementation
            C1P012: Business process management
            • Design/demand aggregation
            • Planning/leading,
            • Construction/implementation
            • Monitoring/operation/management
            • None
            • Planning/leading
            C1P012: Urban Services providers
            • Design/demand aggregation
            • Planning/leading,
            • Design/demand aggregation,
            • Monitoring/operation/management
            • Planning/leading,
            • Monitoring/operation/management
            • Construction/implementation
            C1P012: Real Estate developers
            • Construction/implementation
            • Planning/leading,
            • Construction/implementation
            • Construction/implementation
            • None
            C1P012: Design/Construction companies
            • Design/demand aggregation
            • Planning/leading,
            • Construction/implementation
            • Construction/implementation
            • Design/demand aggregation,
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation
            C1P012: End‐users/Occupants/Energy Citizens
            • Monitoring/operation/management
            • None
            • Design/demand aggregation
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • Design/demand aggregation
            C1P012: Social/Civil Society/NGOs
            • Design/demand aggregation
            • None
            • Design/demand aggregation
            • Design/demand aggregation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            C1P012: Industry/SME/eCommerce
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • Construction/implementation
            • Design/demand aggregation,
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            • Construction/implementation
            C1P012: Other
            C1P012: Other (if any)
            Summary

            Authors (framework concept)

            Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)

            Contributors (to the content)

            Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)

            Implemented by

            Boutik.pt: Filipe Martins, Jamal Khan
            Marek Suchánek (Czech Technical University in Prague)