Name | Project | Type | Compare |
---|---|---|---|
Örebro-Vivalla | JUST PEPP | PED Relevant Case Study | Compare |
Tiurberget, Kongsvinger | JUST PEPP | PED Relevant Case Study | Compare |
Texel | JUST PEPP | PED Relevant Case Study | Compare |
Hällefors, Sweden | JUST PEPP | PED Relevant Case Study | Compare |
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona | OPEN4CEC | PED Lab | Compare |
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab | OPEN4CEC | PED Lab | Compare |
Pamplona | OPEN4CEC | PED Lab | Uncompare |
Trondheim, Svartlamon | OPEN4CEC | PED Lab | Compare |
Savona, The University of Genova, Savona Campus | OPEN4CEC | PED Lab | Compare |
Torres Vedras, Encosta de São Vicente | COPPER | PED Lab | Compare |
Malmö, Stadium area (Stadionområdet) | PED StepWise | PED Case Study | Compare |
Utrecht, Utrecht Science Park | PED StepWise | PED Relevant Case Study | Compare |
Vienna, Kriegerheimstätten | PED StepWise | PED Relevant Case Study | Compare |
Vienna, 16. District, Leben am Wilhelminenberg | HeatCOOP | PED Relevant Case Study | Uncompare |
Vienna, Laxenburgerstraße AH | HeatCOOP | PED Lab | Compare |
Tartu, Annelinn | V2G-QUESTS | PED Relevant Case Study | Compare |
Utrecht, Kanaleneiland | V2G-QUESTS | PED Relevant Case Study | Compare |
Aveiro, Aradas district | V2G-QUESTS | PED Relevant Case Study | Compare |
Győr Geothermal District Heating Project | PED Relevant Case Study | Uncompare | |
Jacobs Borchs Gate, Drammen | PED Relevant Case Study | Compare | |
Dietenbach, Freiburg im Breisgau | PED Relevant Case Study | Compare | |
Lecce, SmartEnCity | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study | Compare |
STARDUST, Trento | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study / PED Lab | Compare |
Klimatkontrakt Hyllie, Malmö | PED Relevant Case Study | Compare | |
EnStadt:Pfaff, Kaiserslautern | PED Relevant Case Study / PED Lab | Compare | |
mySMARTlife, Helsinki | PED Relevant Case Study | Compare | |
Firenze, Novoli-Cascine district on “le PIagge” buildings | PED Relevant Case Study | Compare | |
Sinfonia, Bolzano | PED Relevant Case Study | Compare | |
Hunziker Areal, Zürich | PED Relevant Case Study | Compare | |
Hammarby Sjöstad 2.0, | PED Relevant Case Study | Compare | |
Sharing Cities, Milano | PED Relevant Case Study | Compare | |
District Heating Pozo Barredo, Mieres | PED Relevant Case Study | Compare | |
Cityfied (demo Linero), Lund | PED Relevant Case Study | Compare | |
Smart Otaniemi, Espoo | PED Relevant Case Study / PED Lab | Compare | |
Zukunftsquartier, Vienna | PED Case Study | Compare | |
Santa Chiara Open Lab, Trento | PED Case Study | Compare | |
Barrio La Pinada, Paterna | PED Case Study / PED Lab | Compare | |
Zero Village Bergen (ZVB) | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
Võru +CityxChange | PED Case Study | Compare | |
NTNU Campus within the Knowledge Axis, Trondheim | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
Furuset project, Oslo | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
Laser Valley – Land of Lights | PED Case Study | Compare | |
Ydalir project | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
NyBy – Ny Flyplass (New City – New Airport) | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
Fornebu, Bærum | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Case Study | Compare |
Fleuraye west, Carquefou | PED Case Study | Compare | |
Smart Energy Åland | PED Case Study | Compare | |
Romania, Alba Iulia PED | ASCEND – Accelerate poSitive Clean ENergy Districts | PED Case Study | Compare |
Romania, Alba Iulia PED | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Munich, Harthof district | PED Case Study | Compare | |
Lublin | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Bærum, Eiksveien 116 | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Findhorn, the Park | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Amsterdam, Buiksloterham PED | ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities | PED Case Study | Compare |
Schönbühel-Aggsbach, Schönbühel an der Donau | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Umeå, Ålidhem district | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Aalborg East | PED Relevant Case Study / PED Lab | Compare | |
Ankara, Çamlık District | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study / PED Relevant Case Study | Compare |
Trenčín | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Luxembourg, Betzdorf | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Vantaa, Aviapolis | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Vidin, Himik and Bononia | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Oslo, Verksbyen | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Uden, Loopkantstraat | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Relevant Case Study | |
Zaragoza, Actur | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Relevant Case Study | Compare |
Aarhus, Brabrand | BIPED – Building Intelligent Positive Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Riga, Ķīpsala, RTU smart student city | ExPEDite – Enabling Positive Energy Districts through Digital Twins | PED Case Study | Compare |
Izmir, District of Karşıyaka | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Istanbul, Ozyegin University Campus | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Espoo, Kera | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study / PED Relevant Case Study | Compare |
Borlänge, Rymdgatan’s Residential Portfolio | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Freiburg, Waldsee | PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district | PED Case Study | Compare |
Innsbruck, Campagne-Areal | PED Relevant Case Study | Compare | |
Graz, Reininghausgründe | PED Case Study | Compare | |
Stor-Elvdal, Campus Evenstad | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Relevant Case Study | Compare |
Oulu, Kaukovainio | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Halmstad, Fyllinge | PED Relevant Case Study | Compare | |
Lund, Brunnshög district | PED Case Study | Compare | |
Vienna, Am Kempelenpark | PED Case Study | Compare | |
Évora, Portugal | POCITYF – A POsitive Energy CITY Transformation Framework | PED Relevant Case Study / PED Lab | Compare |
Kladno, Sletiště (Sport Area), PED Winter Stadium | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Uncompare |
Groningen, PED South | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Groningen, PED North | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Maia, Sobreiro Social Housing | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Lab | Compare |
Lubia (Soria), CEDER-CIEMAT | PED Lab | Compare | |
Tampere, Ilokkaanpuisto district | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study | Compare |
Leon, Former Sugar Factory district | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Istanbul, Kadikoy district, Caferaga | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Espoo, Leppävaara district, Sello center | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Espoo, Espoonlahti district, Lippulaiva block | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Salzburg, Gneis district | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Barcelona, Santa Coloma de Gramenet | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Tartu, City centre area | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study / PED Lab | Compare |
Bologna, Pilastro-Roveri district | GRETA – GReen Energy Transition Actions | PED Relevant Case Study | Compare |
Barcelona, SEILAB & Energy SmartLab | PED Lab | Compare | |
Leipzig, Baumwollspinnerei district | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Kifissia, Energy community | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Uncompare |
Title | Uden, Loopkantstraat | Győr, Geothermal District Heating Project | Pamplona | Vienna, 16. District, Leben am Wilhelminenberg | Kladno, Sletiště (Sport Area), PED Winter Stadium | Kifissia, Energy community |
---|---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | ||||||
A1P001: Name of the PED case study / PED Lab | Uden, Loopkantstraat | Győr, Geothermal District Heating Project | Pamplona | Vienna, 16. District, Leben am Wilhelminenberg | Kladno, Sletiště (Sport Area), PED Winter Stadium | Kifissia, Energy community |
A1P002: Map / aerial view / photos / graphic details / leaflet | ||||||
A1P002: Map / aerial view / photos / graphic details / leaflet |
|
| ||||
A1P003: Categorisation of the PED site | ||||||
PED case study | no | no | no | no | no | no |
PED relevant case study | yes | yes | no | yes | yes | yes |
PED Lab. | no | no | yes | no | no | no |
A1P004: Targets of the PED case study / PED Lab | ||||||
Climate neutrality | yes | yes | yes | yes | yes | no |
Annual energy surplus | yes | no | no | no | yes | no |
Energy community | no | no | yes | yes | yes | yes |
Circularity | no | no | no | no | no | no |
Air quality and urban comfort | no | no | no | no | no | yes |
Electrification | yes | no | no | no | yes | yes |
Net-zero energy cost | no | no | no | no | no | no |
Net-zero emission | no | no | no | no | no | no |
Self-sufficiency (energy autonomous) | no | no | no | no | no | no |
Maximise self-sufficiency | no | no | no | no | no | no |
Other | no | yes | no | no | no | no |
Other (A1P004) | Energy efficient; Carbon-free | |||||
A1P005: Phase of the PED case study / PED Lab | ||||||
A1P005: Project Phase of your case study/PED Lab | In operation | Completed | Implementation Phase | Planning Phase | Planning Phase | Planning Phase |
A1P006: Start Date | ||||||
A1P006: Start date | 06/17 | 12/13 | 06/24 | 03/24 | 2022 | |
A1P007: End Date | ||||||
A1P007: End date | 05/23 | 10/18 | 07/28 | 12/27 | ||
A1P008: Reference Project | ||||||
A1P008: Reference Project | ||||||
A1P009: Data availability | ||||||
A1P009: Data availability |
| |||||
A1P009: Other | ||||||
A1P010: Sources | ||||||
Any publication, link to website, deliverable referring to the PED/PED Lab |
| |||||
A1P011: Geographic coordinates | ||||||
X Coordinate (longitude): | 5.6191 | 17.868124 | -1.64323 | 16.303112 | 14.09296 | 23.814588 |
Y Coordinate (latitude): | 51.6606 | 47.651452 | 42.81687 | 48.218501 | 50.13715 | 38.077349 |
A1P012: Country | ||||||
A1P012: Country | Netherlands | Hungary | Spain | Austria | Czech Republic | Greece |
A1P013: City | ||||||
A1P013: City | Uden | Győr | Pamplona | Vienna | Kladno | Municipality of Kifissia |
A1P014: Climate Zone (Köppen Geiger classification) | ||||||
A1P014: Climate Zone (Köppen Geiger classification). | Cfb | Cfb | Cfb | Cfb | Cfb | Csa |
A1P015: District boundary | ||||||
A1P015: District boundary | Geographic | Geographic | Virtual | Geographic | Virtual | |
Other | V1* (ca 8 buildings) | The energy will be produced by a PV plant installed on the terrace of a municipal building. Members of the energy community (that is under formation) will benefit from the energy produced via virtual net metering. PV instalment and the buildings (owned by the members of the community) will be within the boundaries of the Municipality but not necessary in the same area/district/neighbourhood | ||||
A1P016: Ownership of the case study/PED Lab | ||||||
A1P016: Ownership of the case study/PED Lab: | Private | Mixed | Mixed | Private | Mixed | |
A1P017: Ownership of the land / physical infrastructure | ||||||
A1P017: Ownership of the land / physical infrastructure: | Single Owner | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners | |
A1P018: Number of buildings in PED | ||||||
A1P018: Number of buildings in PED | 1 | 8 | ||||
A1P019: Conditioned space | ||||||
A1P019: Conditioned space [m²] | 2360 | |||||
A1P020: Total ground area | ||||||
A1P020: Total ground area [m²] | 3860 | 23550000 | ||||
A1P021: Floor area ratio: Conditioned space / total ground area | ||||||
A1P021: Floor area ratio: Conditioned space / total ground area | 1 | 0 | 0 | 0 | 0 | 0 |
A1P022: Financial schemes | ||||||
A1P022a: Financing - PRIVATE - Real estate | yes | no | no | yes | yes | no |
A1P022a: Add the value in EUR if available [EUR] | 7804440 | |||||
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | yes | no |
A1P022b: Add the value in EUR if available [EUR] | ||||||
A1P022c: Financing - PRIVATE - Other | no | no | no | no | no | no |
A1P022c: Add the value in EUR if available [EUR] | ||||||
A1P022d: Financing - PUBLIC - EU structural funding | no | yes | no | no | yes | no |
A1P022d: Add the value in EUR if available [EUR] | ||||||
A1P022e: Financing - PUBLIC - National funding | no | no | no | no | no | no |
A1P022e: Add the value in EUR if available [EUR] | ||||||
A1P022f: Financing - PUBLIC - Regional funding | no | no | no | no | no | no |
A1P022f: Add the value in EUR if available [EUR] | ||||||
A1P022g: Financing - PUBLIC - Municipal funding | no | no | yes | no | yes | no |
A1P022g: Add the value in EUR if available [EUR] | ||||||
A1P022h: Financing - PUBLIC - Other | no | no | no | no | no | no |
A1P022h: Add the value in EUR if available [EUR] | ||||||
A1P022i: Financing - RESEARCH FUNDING - EU | no | no | no | no | yes | no |
A1P022i: Add the value in EUR if available [EUR] | ||||||
A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | no | yes | no |
A1P022j: Add the value in EUR if available [EUR] | ||||||
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no | no |
A1P022k: Add the value in EUR if available [EUR] | ||||||
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no | no |
A1P022l: Add the value in EUR if available [EUR] | ||||||
A1P022: Other | ||||||
A1P023: Economic Targets | ||||||
A1P023: Economic Targets |
| |||||
A1P023: Other | ||||||
A1P024: More comments: | ||||||
A1P024: More comments: | The project is a follow-up from the “Social Beautiful” concept which was developed in collaboration between Labyrint (Support in sheltered housing), Area (housing company), the municipality of Uden, and Hendriks Coppelmans (developer). The concept aims to provide an answer to changes in various policy areas and the changing demands of society. The Social Beautiful concept consists of the following elements: 1. Living, working, and community services are brought together in one location. A multifunctional residential and service centre is being realized at the location. 2. Housing is shaped by the realization of financially accessible homes suitable for the target group. The housing design is tailored to the target group. it may also include sheltered / protected living. 3. Work takes place at the location or from the same location. The work has a social function within the neighbourhood. Wage-related work must contribute to providing structure in the daily activities of the residents. 4. Neighbourhood management is organized from the location in the surrounding neighbourhood. A service package is provided from the residential and service centre that contributes to the ability of neighbourhood residents to live independently for longer, to strengthen the social network, and to improve the quality of life and safety in the neighbourhood. 5. The houses are suitable for use at all times for regular rental. Communal facilities must be realized within the contours of a regular apartment. The objective is to offer a suitable living and working situation to a group of vulnerable citizens. In this way they become a fully-fledged part of society. They not only make use of the facilities themselves, but also give substance to the level of facilities in the municipality. Due to the integrated approach, they experience a greater sense of well-being and security. | |||||
A1P025: Estimated PED case study / PED LAB costs | ||||||
A1P025: Estimated PED case study / PED LAB costs [mil. EUR] | 7804440 | |||||
Contact person for general enquiries | ||||||
A1P026: Name | Tonje Healey Trulsrud | Christoph Gollner | Oscar Puyal LAtorre | Rachel Leutgöb (e7) | David Škorňa | Artemis Giavasoglou, Kleopatra Kalampoka |
A1P027: Organization | Norwegian University of Science and Technology (NTNU) | FFG | Endef Engineering SL | e7 GmbH | Město Kladno | Municipality of Kifissia – SPARCS local team |
A1P028: Affiliation | Research Center / University | Other | SME / Industry | Research Center / University | Municipality / Public Bodies | Municipality / Public Bodies |
A1P028: Other | ||||||
A1P029: Email | tonje.h.trulsrud@ntnu.no | christoph.gollner@ffg.at | oscar.puyal@endef.com | rachel.leutgoeb@e-sieben.at | david.skorna@mestokladno.cz | giavasoglou@kifissia.gr |
Contact person for other special topics | ||||||
A1P030: Name | Michal Kuzmič | Stavros Zapantis - vice mayor | ||||
A1P031: Email | michal.kuzmic@cvut.cz | stavros.zapantis@gmail.com | ||||
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes | |
A2P001: Fields of application | ||||||
A2P001: Fields of application |
|
|
|
|
|
|
A2P001: Other | ||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | ||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | Energy efficiency: Energy efficient envelope, with good insulation, triple glazing windows and airtight envelope. (EPC = 0) Energy Flexibility: MCP controls for the heat pump in the apartments. Energy production: PV panels on the roof, Ground source heat pumps Waste management: construction waste was kept to a minimum and sorted and collected separately as much as possible. Indoor air quality: Exhaust ventilation and opening of windows Construction materials: low carbon emission building materials | Trnsys, PV modelling tools, CAD | ||||
A2P003: Application of ISO52000 | ||||||
A2P003: Application of ISO52000 | Yes | No | ||||
A2P004: Appliances included in the calculation of the energy balance | ||||||
A2P004: Appliances included in the calculation of the energy balance | No | Yes | ||||
A2P005: Mobility included in the calculation of the energy balance | ||||||
A2P005: Mobility included in the calculation of the energy balance | No | No | ||||
A2P006: Description of how mobility is included (or not included) in the calculation | ||||||
A2P006: Description of how mobility is included (or not included) in the calculation | not included | Not yet included. | ||||
A2P007: Annual energy demand in buildings / Thermal demand | ||||||
A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum] | 0.148 | 1 | 1.4 | |||
A2P008: Annual energy demand in buildings / Electric Demand | ||||||
A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum] | 0.109 | 0.3 | ||||
A2P009: Annual energy demand for e-mobility | ||||||
A2P009: Annual energy demand for e-mobility [GWh/annum] | ||||||
A2P010: Annual energy demand for urban infrastructure | ||||||
A2P010: Annual energy demand for urban infrastructure [GWh/annum] | ||||||
A2P011: Annual renewable electricity production on-site during target year | ||||||
A2P011: PV | yes | no | no | no | yes | yes |
A2P011: PV - specify production in GWh/annum [GWh/annum] | 0.058 | 1.1 | ||||
A2P011: Wind | no | no | no | no | no | no |
A2P011: Wind - specify production in GWh/annum [GWh/annum] | ||||||
A2P011: Hydro | no | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum [GWh/annum] | ||||||
A2P011: Biomass_el | no | no | no | no | no | no |
A2P011: Biomass_el - specify production in GWh/annum [GWh/annum] | ||||||
A2P011: Biomass_peat_el | no | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum] | ||||||
A2P011: PVT_el | no | no | no | no | no | no |
A2P011: PVT_el - specify production in GWh/annum [GWh/annum] | ||||||
A2P011: Other | no | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Annual renewable thermal production on-site during target year | ||||||
A2P012: Geothermal | yes | no | no | no | no | no |
A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Solar Thermal | no | no | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Biomass_heat | no | no | no | no | no | no |
A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Waste heat+HP | no | no | no | no | yes | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum] | 1.7 | |||||
A2P012: Biomass_peat_heat | no | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: PVT_th | no | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Biomass_firewood_th | no | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P012: Other | no | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum [GWh/annum] | ||||||
A2P013: Renewable resources on-site - Additional notes | ||||||
A2P013: Renewable resources on-site - Additional notes | *Annual energy use below is presentedin primary energy consumption | Waste heat from cooling the ice rink. | ||||
A2P014: Annual energy use | ||||||
A2P014: Annual energy use [GWh/annum] | 0.194 | 2.1 | ||||
A2P015: Annual energy delivered | ||||||
A2P015: Annual energy delivered [GWh/annum] | 0.0368 | |||||
A2P016: Annual non-renewable electricity production on-site during target year | ||||||
A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum] | ||||||
A2P017: Annual non-renewable thermal production on-site during target year | ||||||
A2P017: Gas | no | no | no | no | no | no |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||
A2P017: Coal | no | no | no | no | no | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||
A2P017: Oil | no | no | no | no | no | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||
A2P017: Other | no | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||
A2P018: Annual renewable electricity imports from outside the boundary during target year | ||||||
A2P018: PV | no | no | no | no | no | no |
A2P018 - PV: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: Wind | no | no | no | no | no | no |
A2P018 - Wind: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: Hydro | no | no | no | no | no | no |
A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: Biomass_el | no | no | no | no | no | no |
A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: Biomass_peat_el | no | no | no | no | no | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: PVT_el | no | no | no | no | no | no |
A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P018: Other | no | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available [GWh/annum] | ||||||
A2P019: Annual renewable thermal imports from outside the boundary during target year | ||||||
A2P019: Geothermal | no | no | no | no | no | no |
A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Solar Thermal | no | no | no | no | no | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Biomass_heat | no | no | no | no | no | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Waste heat+HP | no | no | no | no | no | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Biomass_peat_heat | no | no | no | no | no | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: PVT_th | no | no | no | no | no | no |
A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Biomass_firewood_th | no | no | no | no | no | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P019: Other | no | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum [GWh/annum] | ||||||
A2P020: Share of RES on-site / RES outside the boundary | ||||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | ||||||
A2P021: GHG-balance calculated for the PED [tCO2/annum] | -0.00043 | -104 | ||||
A2P022: KPIs related to the PED case study / PED Lab | ||||||
A2P022: Safety & Security | Personal Safety | |||||
A2P022: Health | Healthy community | |||||
A2P022: Education | ||||||
A2P022: Mobility | Sustainable mobility | |||||
A2P022: Energy | NOn-renewable primary energy balance, renewable energy ratio, grid purchase factor, load cover factor/self-generation, supply cover factor/self-consumption, net energy/net power, peak delivered/peak expoted, total greenhouse gas emission | Yes | Energy demand (heating and hot water), Energy demand (cooling), Cooling demand, Distributin losses, PV production, RES production, OER, Primafry Non-renewable energy balance, AMR, HMR, CO2 balance | |||
A2P022: Water | ||||||
A2P022: Economic development | capital costs, operational cots, overall economic performance (5 KPIs) | Investment cost, Caputal cost, Operation cost, payback period, NPV, cummulated cash flow, savings, Life cycle, ROI, SROI | ||||
A2P022: Housing and Community | demographic composition, diverse community, social cohesion | Number of people interested in participating in an energy community | ||||
A2P022: Waste | ||||||
A2P022: Other | Smartness and flecibility, Indoor Environmental Quality, Social performance - Equity (affordable housing, access to servicees and amenitioes, afforability of energy, living conditions, sustinable mobility, universal design) | |||||
A2P023: Technological Solutions / Innovations - Energy Generation | ||||||
A2P023: Photovoltaics | yes | no | yes | yes | yes | no |
A2P023: Solar thermal collectors | no | yes | no | no | no | no |
A2P023: Wind Turbines | no | no | no | no | no | no |
A2P023: Geothermal energy system | yes | yes | no | yes | no | no |
A2P023: Waste heat recovery | no | no | no | no | yes | no |
A2P023: Waste to energy | no | no | no | no | no | no |
A2P023: Polygeneration | no | no | no | no | no | no |
A2P023: Co-generation | no | no | no | no | no | no |
A2P023: Heat Pump | yes | no | no | yes | yes | no |
A2P023: Hydrogen | no | no | no | no | no | no |
A2P023: Hydropower plant | no | no | no | no | no | no |
A2P023: Biomass | no | no | no | no | no | no |
A2P023: Biogas | no | no | no | no | no | no |
A2P023: Other | ||||||
A2P024: Technological Solutions / Innovations - Energy Flexibility | ||||||
A2P024: A2P024: Information and Communication Technologies (ICT) | no | no | no | no | yes | no |
A2P024: Energy management system | yes | no | no | no | yes | no |
A2P024: Demand-side management | yes | no | no | no | yes | no |
A2P024: Smart electricity grid | no | no | no | no | no | no |
A2P024: Thermal Storage | no | no | no | yes | no | no |
A2P024: Electric Storage | no | no | no | no | no | no |
A2P024: District Heating and Cooling | no | yes | no | yes | yes | no |
A2P024: Smart metering and demand-responsive control systems | yes | no | yes | no | yes | no |
A2P024: P2P – buildings | no | no | no | no | no | no |
A2P024: Other | ||||||
A2P025: Technological Solutions / Innovations - Energy Efficiency | ||||||
A2P025: Deep Retrofitting | no | no | no | yes | yes | no |
A2P025: Energy efficiency measures in historic buildings | no | no | no | yes | no | no |
A2P025: High-performance new buildings | yes | no | no | no | no | no |
A2P025: Smart Public infrastructure (e.g. smart lighting) | no | no | no | no | no | no |
A2P025: Urban data platforms | no | no | no | no | yes | no |
A2P025: Mobile applications for citizens | no | no | no | no | no | no |
A2P025: Building services (HVAC & Lighting) | yes | no | no | no | yes | no |
A2P025: Smart irrigation | no | no | no | no | no | no |
A2P025: Digital tracking for waste disposal | no | no | no | no | no | no |
A2P025: Smart surveillance | no | no | yes | no | no | no |
A2P025: Other | ||||||
A2P026: Technological Solutions / Innovations - Mobility | ||||||
A2P026: Efficiency of vehicles (public and/or private) | no | no | no | no | no | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | no | no | no | no | no | no |
A2P026: e-Mobility | no | no | no | no | no | no |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | no | no | no |
A2P026: Car-free area | no | no | no | no | no | no |
A2P026: Other | ||||||
A2P027: Mobility strategies - Additional notes | ||||||
A2P027: Mobility strategies - Additional notes | ||||||
A2P028: Energy efficiency certificates | ||||||
A2P028: Energy efficiency certificates | Yes | Yes | ||||
A2P028: If yes, please specify and/or enter notes | EPC = 0, energy neutral building | National standards apply. | Energy Performance Certificate - in Greece it is mandatory in order to buy or rent a house or a dwelling | |||
A2P029: Any other building / district certificates | ||||||
A2P029: Any other building / district certificates | No | No | ||||
A2P029: If yes, please specify and/or enter notes | ||||||
A3P001: Relevant city /national strategy | ||||||
A3P001: Relevant city /national strategy |
|
| ||||
A3P002: Quantitative targets included in the city / national strategy | ||||||
A3P002: Quantitative targets included in the city / national strategy | Carbon neutrality 2050 | |||||
A3P003: Strategies towards decarbonization of the gas grid | ||||||
A3P003: Strategies towards decarbonization of the gas grid |
| |||||
A3P003: Other | ||||||
A3P004: Identification of needs and priorities | ||||||
A3P004: Identification of needs and priorities | ||||||
A3P005: Sustainable behaviour | ||||||
A3P005: Sustainable behaviour | ||||||
A3P006: Economic strategies | ||||||
A3P006: Economic strategies |
|
| ||||
A3P006: Other | ||||||
A3P007: Social models | ||||||
A3P007: Social models |
|
|
|
| ||
A3P007: Other | ||||||
A3P008: Integrated urban strategies | ||||||
A3P008: Integrated urban strategies |
| |||||
A3P008: Other | ||||||
A3P009: Environmental strategies | ||||||
A3P009: Environmental strategies |
|
|
|
| ||
A3P009: Other | ||||||
A3P010: Legal / Regulatory aspects | ||||||
A3P010: Legal / Regulatory aspects | ||||||
B1P001: PED/PED relevant concept definition | ||||||
B1P001: PED/PED relevant concept definition | The demonstration projects is a new residential development, which consists of an apartment complex which includes 39 apartments spread over 3 floors. It is a sustainble plus energy neighbouhood, and has reached a plus energy balance on its first year in operation. It has MPC controls on the individual heat pumps to improve the energy flexibility of the apartments. It includes the "social beatiful" concepts with a strong emphasis on the social sustainability of the project. | Onsite Energy Ratio > 1 | ||||
B1P002: Motivation behind PED/PED relevant project development | ||||||
B1P002: Motivation behind PED/PED relevant project development | The need for social housing and the ambition to create a great living environment with a high-performance apartment complex, supplied with renewable energy. It results in lower energy bills for the tenants and high-quality homes. | Strategic, economic | ||||
B1P003: Environment of the case study area | ||||||
B2P003: Environment of the case study area | Suburban area | Urban area | Urban area | |||
B1P004: Type of district | ||||||
B2P004: Type of district |
|
|
| |||
B1P005: Case Study Context | ||||||
B1P005: Case Study Context |
|
|
| |||
B1P006: Year of construction | ||||||
B1P006: Year of construction | ||||||
B1P007: District population before intervention - Residential | ||||||
B1P007: District population before intervention - Residential | ||||||
B1P008: District population after intervention - Residential | ||||||
B1P008: District population after intervention - Residential | ||||||
B1P009: District population before intervention - Non-residential | ||||||
B1P009: District population before intervention - Non-residential | ||||||
B1P010: District population after intervention - Non-residential | ||||||
B1P010: District population after intervention - Non-residential | ||||||
B1P011: Population density before intervention | ||||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 | 0 |
B1P012: Population density after intervention | ||||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0 | 0 | 0 |
B1P013: Building and Land Use before intervention | ||||||
B1P013: Residential | no | no | no | no | yes | no |
B1P013 - Residential: Specify the sqm [m²] | ||||||
B1P013: Office | no | no | no | no | yes | no |
B1P013 - Office: Specify the sqm [m²] | ||||||
B1P013: Industry and Utility | no | no | no | no | no | no |
B1P013 - Industry and Utility: Specify the sqm [m²] | ||||||
B1P013: Commercial | no | no | no | no | no | no |
B1P013 - Commercial: Specify the sqm [m²] | ||||||
B1P013: Institutional | no | no | no | no | no | no |
B1P013 - Institutional: Specify the sqm [m²] | ||||||
B1P013: Natural areas | no | no | no | no | no | no |
B1P013 - Natural areas: Specify the sqm [m²] | ||||||
B1P013: Recreational | no | no | no | no | yes | no |
B1P013 - Recreational: Specify the sqm [m²] | ||||||
B1P013: Dismissed areas | no | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm [m²] | ||||||
B1P013: Other | no | no | no | no | no | no |
B1P013 - Other: Specify the sqm [m²] | ||||||
B1P014: Building and Land Use after intervention | ||||||
B1P014: Residential | yes | no | no | no | yes | no |
B1P014 - Residential: Specify the sqm [m²] | 2394 | |||||
B1P014: Office | no | no | no | no | yes | no |
B1P014 - Office: Specify the sqm [m²] | ||||||
B1P014: Industry and Utility | no | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm [m²] | ||||||
B1P014: Commercial | no | no | no | no | no | no |
B1P014 - Commercial: Specify the sqm [m²] | ||||||
B1P014: Institutional | no | no | no | no | no | no |
B1P014 - Institutional: Specify the sqm [m²] | ||||||
B1P014: Natural areas | no | no | no | no | no | no |
B1P014 - Natural areas: Specify the sqm [m²] | ||||||
B1P014: Recreational | no | no | no | no | yes | no |
B1P014 - Recreational: Specify the sqm [m²] | ||||||
B1P014: Dismissed areas | no | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm [m²] | ||||||
B1P014: Other | no | no | no | no | no | no |
B1P014 - Other: Specify the sqm [m²] | ||||||
B2P001: PED Lab concept definition | ||||||
B2P001: PED Lab concept definition | ||||||
B2P002: Installation life time | ||||||
B2P002: Installation life time | ||||||
B2P003: Scale of action | ||||||
B2P003: Scale | ||||||
B2P004: Operator of the installation | ||||||
B2P004: Operator of the installation | ||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | ||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | ||||||
B2P006: Circular Economy Approach | ||||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | ||||||
B2P006: Other | ||||||
B2P007: Motivation for developing the PED Lab | ||||||
B2P007: Motivation for developing the PED Lab | ||||||
B2P007: Other | ||||||
B2P008: Lead partner that manages the PED Lab | ||||||
B2P008: Lead partner that manages the PED Lab | ||||||
B2P008: Other | ||||||
B2P009: Collaborative partners that participate in the PED Lab | ||||||
B2P009: Collaborative partners that participate in the PED Lab | ||||||
B2P009: Other | ||||||
B2P010: Synergies between the fields of activities | ||||||
B2P010: Synergies between the fields of activities | ||||||
B2P011: Available facilities to test urban configurations in PED Lab | ||||||
B2P011: Available facilities to test urban configurations in PED Lab | ||||||
B2P011: Other | ||||||
B2P012: Incubation capacities of PED Lab | ||||||
B2P012: Incubation capacities of PED Lab | ||||||
B2P013: Availability of the facilities for external people | ||||||
B2P013: Availability of the facilities for external people | ||||||
B2P014: Monitoring measures | ||||||
B2P014: Monitoring measures | ||||||
B2P015: Key Performance indicators | ||||||
B2P015: Key Performance indicators | ||||||
B2P016: Execution of operations | ||||||
B2P016: Execution of operations | ||||||
B2P017: Capacities | ||||||
B2P017: Capacities | ||||||
B2P018: Relations with stakeholders | ||||||
B2P018: Relations with stakeholders | ||||||
B2P019: Available tools | ||||||
B2P019: Available tools | ||||||
B2P019: Available tools | ||||||
B2P020: External accessibility | ||||||
B2P020: External accessibility | ||||||
C1P001: Unlocking Factors | ||||||
C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 5 - Very important |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P001: Energy Communities, P2P, Prosumers concepts | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P001: Storage systems and E-mobility market penetration | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | |
C1P001: Decreasing costs of innovative materials | 4 - Important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 4 - Important | 4 - Important | 4 - Important |
C1P001: The ability to predict Multiple Benefits | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | |
C1P001: The ability to predict the distribution of benefits and impacts | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 3 - Moderately important | |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 3 - Moderately important | 5 - Very important |
C1P001: Social acceptance (top-down) | 5 - Very important | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 2 - Slightly important | 5 - Very important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 4 - Important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 3 - Moderately important |
C1P001: Presence of integrated urban strategies and plans | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P001: Multidisciplinary approaches available for systemic integration | 5 - Very important | 1 - Unimportant | 4 - Important | 4 - Important | 3 - Moderately important | 3 - Moderately important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important | 4 - Important |
C1P001: Availability of RES on site (Local RES) | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | |
C1P001: Any other UNLOCKING FACTORS (if any) | Collaboration with the local partners | |||||
C1P002: Driving Factors | ||||||
C1P002: Climate Change adaptation need | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 5 - Very important | 1 - Unimportant | 5 - Very important | 5 - Very important | 4 - Important | 5 - Very important |
C1P002: Rapid urbanization trend and need of urban expansions | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant |
C1P002: Urban re-development of existing built environment | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 3 - Moderately important |
C1P002: Economic growth need | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 4 - Important | 2 - Slightly important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important |
C1P002: Territorial and market attractiveness | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important |
C1P002: Energy autonomy/independence | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 5 - Very important |
C1P002: Any other DRIVING FACTOR | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | |
C1P002: Any other DRIVING FACTOR (if any) | ||||||
C1P003: Administrative barriers | ||||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important | 4 - Important |
C1P003: Lack of good cooperation and acceptance among partners | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Lack of public participation | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P003: Lack of institutions/mechanisms to disseminate information | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important |
C1P003:Long and complex procedures for authorization of project activities | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P003: Complicated and non-comprehensive public procurement | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important | 4 - Important |
C1P003: Fragmented and or complex ownership structure | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 3 - Moderately important |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 3 - Moderately important |
C1P003: Lack of internal capacities to support energy transition | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important |
C1P003: Any other Administrative BARRIER | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | |
C1P003: Any other Administrative BARRIER (if any) | Delay in the Environmental Dialogue processing in the municipality | Fragmented financial support; lack of experimental budget for complex projects, etc. | ||||
C1P004: Policy barriers | ||||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P004: Lacking or fragmented local political commitment and support on the long term | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important | 4 - Important |
C1P004: Lack of Cooperation & support between national-regional-local entities | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 4 - Important | 3 - Moderately important |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | |
C1P004: Any other Political BARRIER (if any) | Different priorities; overall problematic system od decentralization powers; non-fuctioning model of local development funding, etc. | |||||
C1P005: Legal and Regulatory barriers | ||||||
C1P005: Inadequate regulations for new technologies | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 3 - Moderately important | 4 - Important |
C1P005: Regulatory instability | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important |
C1P005: Non-effective regulations | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important | 4 - Important |
C1P005: Unfavorable local regulations for innovative technologies | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P005: Building code and land-use planning hindering innovative technologies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important |
C1P005: Insufficient or insecure financial incentives | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important | 4 - Important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P005: Shortage of proven and tested solutions and examples | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | |
C1P005: Any other Legal and Regulatory BARRIER (if any) | ||||||
C1P006: Environmental barriers | ||||||
C1P006: Environmental barriers | ||||||
C1P007: Technical barriers | ||||||
C1P007: Lack of skilled and trained personnel | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 4 - Important | 4 - Important |
C1P007: Deficient planning | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P007: Retrofitting work in dwellings in occupied state | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 4 - Important |
C1P007: Lack of well-defined process | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P007: Inaccuracy in energy modelling and simulation | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P007: Lack/cost of computational scalability | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 4 - Important |
C1P007: Grid congestion, grid instability | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 3 - Moderately important | 5 - Very important |
C1P007: Difficult definition of system boundaries | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 4 - Important | 3 - Moderately important |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | |
C1P007: Any other Thecnical BARRIER (if any) | Inadequate regulation towards energy transition | |||||
C1P008: Social and Cultural barriers | ||||||
C1P008: Inertia | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 3 - Moderately important | 4 - Important |
C1P008: Lack of values and interest in energy optimization measurements | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P008: Low acceptance of new projects and technologies | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 5 - Very important | 5 - Very important |
C1P008: Difficulty of finding and engaging relevant actors | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P008: Lack of trust beyond social network | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P008: Rebound effect | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P008: Hostile or passive attitude towards environmentalism | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P008: Exclusion of socially disadvantaged groups | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important |
C1P008: Non-energy issues are more important and urgent for actors | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 5 - Very important | 3 - Moderately important |
C1P008: Hostile or passive attitude towards energy collaboration | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | |
C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | |
C1P008: Any other Social BARRIER (if any) | ||||||
C1P009: Information and Awareness barriers | ||||||
C1P009: Insufficient information on the part of potential users and consumers | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 3 - Moderately important | |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | |
C1P009: Lack of awareness among authorities | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 4 - Important | |
C1P009: Information asymmetry causing power asymmetry of established actors | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | |
C1P009: High costs of design, material, construction, and installation | 1 - Unimportant | 1 - Unimportant | 4 - Important | 5 - Very important | 5 - Very important | |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | |
C1P009: Any other Information and Awareness BARRIER (if any) | ||||||
C1P010: Financial barriers | ||||||
C1P010: Hidden costs | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 4 - Important | |
C1P010: Insufficient external financial support and funding for project activities | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 4 - Important | |
C1P010: Economic crisis | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important | |
C1P010: Risk and uncertainty | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 4 - Important | |
C1P010: Lack of consolidated and tested business models | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 4 - Important | |
C1P010: Limited access to capital and cost disincentives | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | |
C1P010: Any other Financial BARRIER (if any) | ||||||
C1P011: Market barriers | ||||||
C1P011: Split incentives | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | |
C1P011: Energy price distortion | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important | |
C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | |
C1P011: Any other Market BARRIER (if any) | ||||||
C1P012: Stakeholders involved | ||||||
C1P012: Government/Public Authorities |
|
| ||||
C1P012: Research & Innovation |
|
| ||||
C1P012: Financial/Funding | ||||||
C1P012: Analyst, ICT and Big Data | ||||||
C1P012: Business process management | ||||||
C1P012: Urban Services providers |
| |||||
C1P012: Real Estate developers |
|
| ||||
C1P012: Design/Construction companies |
| |||||
C1P012: End‐users/Occupants/Energy Citizens |
|
| ||||
C1P012: Social/Civil Society/NGOs | ||||||
C1P012: Industry/SME/eCommerce | ||||||
C1P012: Other | ||||||
C1P012: Other (if any) | ||||||
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)