Örebro-Vivalla JUST PEPP PED Relevant Case Study Compare
Tiurberget, Kongsvinger JUST PEPP PED Relevant Case Study Compare
Texel JUST PEPP PED Relevant Case Study Compare
Hällefors, Sweden JUST PEPP PED Relevant Case Study Compare
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona OPEN4CEC PED Lab Uncompare
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab OPEN4CEC PED Lab Uncompare
Pamplona OPEN4CEC PED Lab Compare
Trondheim, Svartlamon OPEN4CEC PED Lab Compare
Savona, The University of Genova, Savona Campus OPEN4CEC PED Lab Compare
Torres Vedras, Encosta de São Vicente COPPER PED Lab Compare
Malmö, Stadium area (Stadionområdet) PED StepWise PED Case Study Compare
Utrecht, Utrecht Science Park PED StepWise PED Relevant Case Study Compare
Vienna, Kriegerheimstätten PED StepWise PED Relevant Case Study Uncompare
Vienna, 16. District, Leben am Wilhelminenberg HeatCOOP PED Relevant Case Study Compare
Vienna, Laxenburgerstraße AH HeatCOOP PED Lab Compare
Tartu, Annelinn V2G-QUESTS PED Relevant Case Study Compare
Utrecht, Kanaleneiland V2G-QUESTS PED Relevant Case Study Compare
Aveiro, Aradas district V2G-QUESTS PED Relevant Case Study Compare
Győr Geothermal District Heating Project PED Relevant Case Study Compare
Jacobs Borchs Gate, Drammen PED Relevant Case Study Compare
Dietenbach, Freiburg im Breisgau PED Relevant Case Study Compare
Lecce, SmartEnCity SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study Compare
STARDUST, Trento STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study / PED Lab Compare
Klimatkontrakt Hyllie, Malmö PED Relevant Case Study Compare
EnStadt:Pfaff, Kaiserslautern PED Relevant Case Study / PED Lab Compare
mySMARTlife, Helsinki PED Relevant Case Study Compare
Firenze, Novoli-Cascine district on “le PIagge” buildings PED Relevant Case Study Compare
Sinfonia, Bolzano PED Relevant Case Study Compare
Hunziker Areal, Zürich PED Relevant Case Study Compare
Hammarby Sjöstad 2.0, PED Relevant Case Study Compare
Sharing Cities, Milano PED Relevant Case Study Compare
District Heating Pozo Barredo, Mieres PED Relevant Case Study Compare
Cityfied (demo Linero), Lund PED Relevant Case Study Uncompare
Smart Otaniemi, Espoo PED Relevant Case Study / PED Lab Compare
Zukunftsquartier, Vienna PED Case Study Compare
Santa Chiara Open Lab, Trento PED Case Study Uncompare
Barrio La Pinada, Paterna PED Case Study / PED Lab Compare
Zero Village Bergen (ZVB) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Võru +CityxChange PED Case Study Compare
NTNU Campus within the Knowledge Axis, Trondheim ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Furuset project, Oslo ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Laser Valley – Land of Lights PED Case Study Compare
Ydalir project ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
NyBy – Ny Flyplass (New City – New Airport) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fornebu, Bærum ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fleuraye west, Carquefou PED Case Study Compare
Smart Energy Åland PED Case Study Compare
Romania, Alba Iulia PED ASCEND – Accelerate poSitive Clean ENergy Districts PED Case Study Compare
Romania, Alba Iulia PED InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Compare
Munich, Harthof district PED Case Study Compare
Lublin MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Compare
Bærum, Eiksveien 116 CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Compare
Findhorn, the Park InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Compare
Amsterdam, Buiksloterham PED ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities PED Case Study Compare
Schönbühel-Aggsbach, Schönbühel an der Donau PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Uncompare
Umeå, Ålidhem district PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Aalborg East PED Relevant Case Study / PED Lab Compare
Ankara, Çamlık District PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study / PED Relevant Case Study Compare
Trenčín MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Luxembourg, Betzdorf LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Vantaa, Aviapolis NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Vidin, Himik and Bononia MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Oslo, Verksbyen Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Uden, Loopkantstraat Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Relevant Case Study Compare
Zaragoza, Actur NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Relevant Case Study Compare
Aarhus, Brabrand BIPED – Building Intelligent Positive Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Riga, Ķīpsala, RTU smart student city ExPEDite – Enabling Positive Energy Districts through Digital Twins PED Case Study Compare
Izmir, District of Karşıyaka PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Istanbul, Ozyegin University Campus LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Espoo, Kera SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study / PED Relevant Case Study Compare
Borlänge, Rymdgatan’s Residential Portfolio PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Compare
Freiburg, Waldsee PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district PED Case Study Compare
Innsbruck, Campagne-Areal PED Relevant Case Study Compare
Graz, Reininghausgründe PED Case Study Compare
Stor-Elvdal, Campus Evenstad ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Relevant Case Study Uncompare
Oulu, Kaukovainio MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Halmstad, Fyllinge PED Relevant Case Study
Lund, Brunnshög district PED Case Study Compare
Vienna, Am Kempelenpark PED Case Study Compare
Évora, Portugal POCITYF – A POsitive Energy CITY Transformation Framework PED Relevant Case Study / PED Lab Compare
Kladno, Sletiště (Sport Area), PED Winter Stadium SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study Compare
Groningen, PED South MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Groningen, PED North MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Maia, Sobreiro Social Housing SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Lab Compare
Lubia (Soria), CEDER-CIEMAT PED Lab Compare
Tampere, Ilokkaanpuisto district STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study Compare
Leon, Former Sugar Factory district MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Istanbul, Kadikoy district, Caferaga MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Espoo, Leppävaara district, Sello center SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Espoo, Espoonlahti district, Lippulaiva block SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Salzburg, Gneis district Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Barcelona, Santa Coloma de Gramenet Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Tartu, City centre area SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study / PED Lab Compare
Bologna, Pilastro-Roveri district GRETA – GReen Energy Transition Actions PED Relevant Case Study Uncompare
Barcelona, SEILAB & Energy SmartLab PED Lab Uncompare
Leipzig, Baumwollspinnerei district SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Kifissia, Energy community SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study Compare
TitleHalmstad, Fyllinge
Barcelona, SEILAB & Energy SmartLab
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab
Cityfied (demo Linero), Lund
Santa Chiara Open Lab, Trento
Schönbühel-Aggsbach, Schönbühel an der Donau
Stor-Elvdal, Campus Evenstad
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona
Vienna, Kriegerheimstätten
Bologna, Pilastro-Roveri district
A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED LabHalmstad, FyllingeBarcelona, SEILAB & Energy SmartLabBucharest, The Bucharest University of Economic Studies (ASE) PED LabCityfied (demo Linero), LundSanta Chiara Open Lab, TrentoSchönbühel-Aggsbach, Schönbühel an der DonauStor-Elvdal, Campus EvenstadCerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de BarcelonaVienna, KriegerheimstättenBologna, Pilastro-Roveri district
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P003: Categorisation of the PED site
PED case studynonononoyesnonononono
PED relevant case studyyesnonoyesnoyesyesnoyesyes
PED Lab.noyesyesnonononoyesnono
A1P004: Targets of the PED case study / PED Lab
Climate neutralitynonoyesyesyesyesyesyesyesyes
Annual energy surplusnonononononoyesnonono
Energy communityyesyesnononoyesnononoyes
Circularitynononononononononono
Air quality and urban comfortnonononononononoyesno
Electrificationnoyesnonononononoyesno
Net-zero energy costnononononoyesnononono
Net-zero emissionnoyesnoyesnononononono
Self-sufficiency (energy autonomous)noyesnononononononono
Maximise self-sufficiencynononononoyesnononono
Othernoyesyesyesyesnoyesyesnono
Other (A1P004)Green ITSmart BuildingsSocial aspects/affordabilityenergy efficientEnergy-flexibility: PV generation/home consumption behaviour emulation at LAB
A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED LabPlanning PhaseIn operationPlanning PhaseCompletedIn operationImplementation PhaseIn operationPlanning PhasePlanning PhasePlanning Phase
A1P006: Start Date
A1P006: Start date01/2101/201103/2501/1412/1701/1309/2501/2309/19
A1P007: End Date
A1P007: End date01/3002/201312/2712/1912/2412/2612/3010/23
A1P008: Reference Project
A1P008: Reference Project
A1P009: Data availability
A1P009: Data availability
  • General statistical datasets
  • General statistical datasets
  • Monitoring data available within the districts
  • Monitoring data available within the districts,
  • Meteorological open data
  • Open data city platform – different dashboards,
  • Meteorological open data,
  • General statistical datasets,
  • GIS open datasets
A1P009: Other
A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
            • Boeri, A., Boulanger, S., Turci, G., Pagliula, S. (2021) Strategie e tecnologie abilitanti per PED misti: efficienza tra smart cities e industria 4.0. TECHNE, 22, 180-190,
            • Barroco Fontes Cunha F., Carani C., Nucci C.A., Castro C., Santana Silva M., Andrade Torres E. (2021) Transitioning to a low carbon society through energy communities: Lessons learned from Brazil and Italy, ENERGY RESEARCH & SOCIAL SCIENCE, 2021, 75, 1-19.,
            • GRETA Project, Pilastro-Roveri case study. Available at: https://projectgreta.eu/case-study/renewable-energy-district/
            A1P011: Geographic coordinates
            X Coordinate (longitude):12.920542.126.0973943259149813.24337511.12663315.396911.0787707735317462.11214552443609616.47541611.397323
            Y Coordinate (latitude):56.6519441.344.4472496751992955.69922346.06368548.275261.4260442039911241.5003086008059248.23401144.507106
            A1P012: Country
            A1P012: CountrySwedenSpainRomaniaSwedenItalyAustriaNorwaySpainAustriaItaly
            A1P013: City
            A1P013: CityHalmstadBarcelona and TarragonaBucharestLundTrentoSchönbühel an der DonauEvenstad, Stor-Elvdal municipalityCerdanyola del VallesViennaBologna
            A1P014: Climate Zone (Köppen Geiger classification)
            A1P014: Climate Zone (Köppen Geiger classification).DwbCsaCsaCfbCfaDfbDwcCsaCfbCfa
            A1P015: District boundary
            A1P015: District boundaryGeographicVirtualGeographicGeographicGeographicFunctionalGeographicGeographic
            Other
            A1P016: Ownership of the case study/PED Lab
            A1P016: Ownership of the case study/PED Lab:MixedPublicPublicMixedMixedPrivatePublicPublicPrivateMixed
            A1P017: Ownership of the land / physical infrastructure
            A1P017: Ownership of the land / physical infrastructure:Multiple OwnersSingle OwnerSingle OwnerMultiple OwnersMultiple OwnersMultiple OwnersSingle OwnerSingle OwnerSingle OwnerMultiple Owners
            A1P018: Number of buildings in PED
            A1P018: Number of buildings in PED25000221962
            A1P019: Conditioned space
            A1P019: Conditioned space [m²]47710000
            A1P020: Total ground area
            A1P020: Total ground area [m²]4858000024501240007800000
            A1P021: Floor area ratio: Conditioned space / total ground area
            A1P021: Floor area ratio: Conditioned space / total ground area0000000000
            A1P022: Financial schemes
            A1P022a: Financing - PRIVATE - Real estateyesnonononoyesnononono
            A1P022a: Add the value in EUR if available [EUR]
            A1P022b: Financing - PRIVATE - ESCO schemenononononononononono
            A1P022b: Add the value in EUR if available [EUR]
            A1P022c: Financing - PRIVATE - Othernonononoyesnononoyesno
            A1P022c: Add the value in EUR if available [EUR]
            A1P022d: Financing - PUBLIC - EU structural fundingnononononononononono
            A1P022d: Add the value in EUR if available [EUR]
            A1P022e: Financing - PUBLIC - National fundingnonononoyesyesyesnonoyes
            A1P022e: Add the value in EUR if available [EUR]41000000
            A1P022f: Financing - PUBLIC - Regional fundingnononononoyesnononoyes
            A1P022f: Add the value in EUR if available [EUR]
            A1P022g: Financing - PUBLIC - Municipal fundingnonononoyesnonononoyes
            A1P022g: Add the value in EUR if available [EUR]
            A1P022h: Financing - PUBLIC - Othernonoyesyesnononoyesnono
            A1P022h: Add the value in EUR if available [EUR]
            A1P022i: Financing - RESEARCH FUNDING - EUyesnonononononononoyes
            A1P022i: Add the value in EUR if available [EUR]
            A1P022j: Financing - RESEARCH FUNDING - Nationalnonononononoyesnonono
            A1P022j: Add the value in EUR if available [EUR]
            A1P022k: Financing - RESEARCH FUNDING - Local/regionalnononononononononoyes
            A1P022k: Add the value in EUR if available [EUR]
            A1P022l: Financing - RESEARCH FUNDING - Othernononoyesyesnonononono
            A1P022l: Add the value in EUR if available [EUR]
            A1P022: Other
            A1P023: Economic Targets
            A1P023: Economic Targets
            • Boosting local and sustainable production
            • Job creation,
            • Boosting local and sustainable production
            • Boosting local businesses,
            • Boosting local and sustainable production
            • Job creation,
            • Positive externalities,
            • Boosting local businesses
            A1P023: Other
            A1P024: More comments:
            A1P024: More comments:Semi-Virtual Energy Integration Laboratory (SEILAB) The Energy Smart Lab is an infrastructure conceived as a flexible and versatile platform for innovative technological developments for both industry and competitive R+D projects. The areas of expertise of this laboratory pivot around the following technologies: – Power Electronics for the integration and control of the elements within a building or community: Renewable Energy Sources (RES), Energy Storage Systems and Electric Vehicles (EV) – ICT Platform for smart communications and energy management of systems, building, networks and communities. – Energy System Integration technologies for smart and flexible buildings and grids including RES and EV. The laboratory operation is based on the hardware emulation approach, which allows for real physical equipment to be operated under a broad range of scenarios without depending on the real occurrence of the boundary conditions suitable for the experimental validation. The laboratory is pioneer in addressing the concept and implementation of Microgrids and aims to become a leading experimental facility for improving the optimal development of Flexible Energy Buildings and Flexibility Aggregation.The Pilastro-Roveri area is a large peri-urban district in the northeast of the city of Bologna (about 650 hectares). In particular, the northern area is mainly characterised by the residential sector of Rione Pilastro, a significant complex of social housing built in the 1960s in response to the housing emergency due to migrations from southern Italy and nowadays satisfying more global migrations. The southern area is instead characterised by the presence of the production district called Roveri. The area appears relevant for the research as it has several evolution potentials towards a climate-neutral district. In particular some key factors are interesting: - the presence of one of the largest photovoltaic parks in Europe on the roofs of CAAB, characterised by a production of 11,350,000 Kw/h of primary energy; - the presence of companies attentive to the issues of climate change and energy, able to act as facilitators for the area. This is the case of FIVE, a leader in the production of electric bicycles, whose plant is the first nZEB (nearly Zero Energy Building) productive building in the city; - the high presence of industrial buildings of different sizes needing a reduction in energy consumption; - the presence of obsolete, sometimes in decay, and of general highly energy-intensive buildings in the Pilastro area, accompanied by spread phenomena of energy poverty; - the presence of spaces that could be converted (e.g. unused warehouses, unexploited green areas, etc.); - the presence of an active community, characterised by numerous associations, but also by social challenges linked to multiple vulnerabilities; - the presence of local actors interested in the development of the area (including the Municipality, the University, Confindustria, ENEA, Confartigianato, etc.). Two main research projects are actually ongoing in the area, applying solutions towards energy improvement and transition strategies to guide the area towards climate neutrality: - GECO - Green Energy Community, funded by EIT Climate-KIC and active since 2019, aims to trigger a virtuous path of energy sharing between companies and citizens through the creation of an energy community. - GRETA - Green Energy Transition Actions, funded by the H2020 programme, aims to understand drivers and barriers on the involvement of citizens in the energy transition processes, by formulating Community Transition Pathways and Energy Citizenship Contracts. [from: Boeri, A., Boulanger, S., Turci, G., Pagliula, S. (2021) Strategie e tecnologie abilitanti per PED misti: efficienza tra smart cities e industria 4.0. TECHNE, 22, 180-190]
            A1P025: Estimated PED case study / PED LAB costs
            A1P025: Estimated PED case study / PED LAB costs [mil. EUR]
            Contact person for general enquiries
            A1P026: NameMarkus OlofsgårdDr. Jaume Salom, Dra. Cristina CorcheroAdela BaraChristoph GollnerChristoph GollnerGhazal EtminanÅse Lekang SørensenJose Lopez VicarioGerhard Hofer (e7 GmbH)Prof. Danila Longo
            A1P027: OrganizationAFRYIRECThe Bucharest University of Economic StudiesFFGFFGGhazal.Etminan@ait.ac.atSINTEF / The Research Centre on Zero Emission Neighbourhoods (ZEN) in Smart CitiesUniversitat Autonoma Barcelona (UAB)e7 GmbHUniversity of Bologna - Architecture Department
            A1P028: AffiliationOtherResearch Center / UniversityResearch Center / UniversityOtherOtherResearch Center / UniversityResearch Center / UniversityResearch Center / UniversitySME / IndustryResearch Center / University
            A1P028: Other
            A1P029: Emailmarkus.olofsgard@afry.comJsalom@irec.catBara.adela@ie.ase.rochristoph.gollner@ffg.atchristoph.gollner@ffg.atGhazal.Etminan@ait.ac.atase.sorensen@sintef.nojose.vicario@uab.catgerhard.hofer@e-sieben.at
            Contact person for other special topics
            A1P030: Name
            A1P031: Email
            Pursuant to the General Data Protection RegulationYesYesYesYesYesYesYesYesYesYes
            A2P001: Fields of application
            A2P001: Fields of application
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies
            • Energy efficiency,
            • Energy flexibility,
            • Digital technologies,
            • Indoor air quality
            • Energy efficiency,
            • Energy production
            • Energy efficiency,
            • Energy flexibility,
            • Energy production
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies,
            • Construction materials
            • Energy efficiency,
            • Energy flexibility,
            • Digital technologies
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • Urban comfort (pollution, heat island, noise level etc.),
            • Other
            • Energy efficiency,
            • Energy flexibility,
            • Energy production,
            • E-mobility,
            • Digital technologies,
            • Waste management
            A2P001: OtherReducing CO2eq Emissions
            A2P002: Tools/strategies/methods applied for each of the above-selected fields
            A2P002: Tools/strategies/methods applied for each of the above-selected fieldslink based regulation of electricity gridEnergy SmartLab capacities - Building simulation model: thermal inertia and thermal loads of a building or community can be co-simulated with a building model. – System Operator and Aggregator simulation models: the interaction with remote control actions carried out by electricity System Operators or flexibility Aggregators can be simulated as well. – Grid simulation model: the physical interaction of the building with the grid power supply can be simulated enabling the experimental validation of flexibility services to the network. Energy SmartLab systems - SAFT Li-ion battery: maximum stored energy 20000 Wh, rated power 150 kW, rated discharge current 200 A, rated charge current 34 A, operating voltage 189 V – 227 V – 254 V, capacity 82 Ah. – Ultracapacitors: maximum stored energy 57 Wh, rated power 10 kW, rated current 20 A, peak current (<1s) 200 Apk, operating voltage 250 V – 500 V, capacity 1,65 F. – Electric vehicle second life battery: maximum stored energy 23300 Wh, rated power 40 kW, rated current 150 A, operating voltage 240 V – 400 V, capacity 32 Ah - 5 microgrid emulators (emulated power 5.5 kVA, max generation connected 10kVA, max consumption connected 10 kVA) - 1 grid emulator (Rated power: 200 kVA, Rated current per phase: 350 A, Rated current per neutral conductor: 35)Energy modelingCampus Evenstad is a small department at Inland Norway University of Applied Sciences, with 220 students. The vision for Campus Evenstad is an energy-flexible Campus Evenstad in an emission-free Europe. The area consists of approx. 20 buildings managed and owned by Statsbygg; the Norwegian government’s building commissioner, property manager and developer. The oldest building is from the 1700-century and the newest is the administration centre (2017) which is a Zero Emission Building (ZEB) with the highest ambitions (ZEB-COM). Their concept has been to realize Campus Evenstad as an energy pilot, where innovative energy solutions are demonstrated, showing how local areas can become more self-sufficient in energy. The energy system at Evenstad consists of several innovative energy solutions that are new in a Norwegian and European context. They are combined in local infrastructure for electricity and heat, which has led to new knowledge and learning about how the solutions work together, and how the interaction is between the local and the national energy system. The solutions consist of solar cells (PV), solar collectors, combined heat and power plant (CHP) based on wood chips, biofuel boiler, electric boiler, grid connection, district heating, heat storage, stationary battery and bidirectional electric vehicle (EV) charging (V2G). Statsbygg has gained a lot of operational experience from Campus Evenstad - both from individual technologies and from the interaction between these, which benefits Statsbygg's 2,200 buildings and 3 million m2 around Norway. Sharing of experiences is central. Campus Evenstad is a pilot in the Research Centre on Zero Emission Neighbourhoods (ZEN) in Smart Cities were several of the solutions has been developed and studied.Energy efficiency: - buildings energy retrofit supported by tax incentives (110%, façade bonus, eco-bonus, sismabonus, renovation bonus, etc.); - several activities - such as Workshops, Webinars, Roundtables, Urban Trekking, etc…- are encouraged in the area to deepen knowledge and raise awareness on energy issues among urban stakeholders (householders, occupants, workers, etc..); - reduction in energy consumption also through every day energy saving actions. The spread of energy poverty phenomena in the area is considered urgent both for the medium-low-income population living in Pilastro and for small and medium-sized enterprises placed in Roveri; - Project for a One-stop-shop to guide residents and enterprises towards more conscious energy behaviours (planned in Bologna SECAP). Energy production: - installation of new photovoltaic (PV) systems for renewable on-site energy production; - presence of a waste to energy plant connected to the district heating system; - presence of a large PV plant in the CAAB area - 11,350,000 Kw/h Energy flexibility: - testing energy community and collective self-consumption feasibility in Pilastro area through an active citizens involvement process; - testing energy community feasibility among SMEs in Roveri industrial area; - testing the potential of complementary energy consumption profiles between residential area (Pilastro) and industrial area (Roveri). Digital technologies: - smart-meters installation in some dwellings in order to monitor consumption and suggest more sustainable energy behaviors; - Blog Pilastro as a tool to inform about the main activities and events ongoing in the area; E-mobility - Installation of new charging stations for electric vehicles; - e-bike/bikesharing services recovery (in fact during Covid-19 in the area Mobike service was suspended) and implementation. Urban comfort and air quality - Control units for air pollutants concentration (PM2.5, PM10, NO2); - Microclimatic simulation
            A2P003: Application of ISO52000
            A2P003: Application of ISO52000NoNoNoYes
            A2P004: Appliances included in the calculation of the energy balance
            A2P004: Appliances included in the calculation of the energy balanceNoYesYesYesNo
            A2P005: Mobility included in the calculation of the energy balance
            A2P005: Mobility included in the calculation of the energy balanceYesYesNoYesNo
            A2P006: Description of how mobility is included (or not included) in the calculation
            A2P006: Description of how mobility is included (or not included) in the calculation– Electric vehicle second life battery: maximum stored energy 23300 Wh, rated power 40 kW, rated current 150 A, operating voltage 240 V – 400 V, capacity 32 AhAt Campus Evenstad there is infrastructure for EV charging and bidirectional charging (V2G). EV charging is included in the energy balance.
            A2P007: Annual energy demand in buildings / Thermal demand
            A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum]0.0660.774.97
            A2P008: Annual energy demand in buildings / Electric Demand
            A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum]0.0120.760.75
            A2P009: Annual energy demand for e-mobility
            A2P009: Annual energy demand for e-mobility [GWh/annum]
            A2P010: Annual energy demand for urban infrastructure
            A2P010: Annual energy demand for urban infrastructure [GWh/annum]
            A2P011: Annual renewable electricity production on-site during target year
            A2P011: PVyesyesnononoyesyesnonoyes
            A2P011: PV - specify production in GWh/annum [GWh/annum]0.065
            A2P011: Windnononononononononono
            A2P011: Wind - specify production in GWh/annum [GWh/annum]
            A2P011: Hydronononononononononono
            A2P011: Hydro - specify production in GWh/annum [GWh/annum]
            A2P011: Biomass_elnonononononoyesnonono
            A2P011: Biomass_el - specify production in GWh/annum [GWh/annum]0.050
            A2P011: Biomass_peat_elnononononononononono
            A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum]
            A2P011: PVT_elnononononononononono
            A2P011: PVT_el - specify production in GWh/annum [GWh/annum]
            A2P011: Othernononononononononono
            A2P011: Other - specify production in GWh/annum [GWh/annum]
            A2P012: Annual renewable thermal production on-site during target year
            A2P012: Geothermalyesnonononononononono
            A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum]
            A2P012: Solar Thermalnonononononoyesnonoyes
            A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum]0.045
            A2P012: Biomass_heatnonononononoyesnonoyes
            A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum]0.35
            A2P012: Waste heat+HPnononononononononono
            A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum]
            A2P012: Biomass_peat_heatnononononononononono
            A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum]
            A2P012: PVT_thnononononononononono
            A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum]
            A2P012: Biomass_firewood_thnononononononononono
            A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum]
            A2P012: Othernononononononononono
            A2P012 - Other: Please specify production in GWh/annum [GWh/annum]
            A2P013: Renewable resources on-site - Additional notes
            A2P013: Renewable resources on-site - Additional notesListed values are measurements from 2018. Renewable energy share is increasing.
            A2P014: Annual energy use
            A2P014: Annual energy use [GWh/annum]0.0791.500
            A2P015: Annual energy delivered
            A2P015: Annual energy delivered [GWh/annum]0.00111
            A2P016: Annual non-renewable electricity production on-site during target year
            A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum]
            A2P017: Annual non-renewable thermal production on-site during target year
            A2P017: Gasnoyesnononononononono
            A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Coalnononononononononono
            A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Oilnononononononononono
            A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P017: Othernononononononononono
            A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum]
            A2P018: Annual renewable electricity imports from outside the boundary during target year
            A2P018: PVnononononoyesnononono
            A2P018 - PV: specify production in GWh/annum if available [GWh/annum]
            A2P018: Windnononononoyesnononono
            A2P018 - Wind: specify production in GWh/annum if available [GWh/annum]
            A2P018: Hydronononononoyesnononono
            A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum]
            A2P018: Biomass_elnononononoyesnononono
            A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: Biomass_peat_elnononononononononono
            A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: PVT_elnononononononononono
            A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum]
            A2P018: Othernononononononononono
            A2P018 - Other: specify production in GWh/annum if available [GWh/annum]
            A2P019: Annual renewable thermal imports from outside the boundary during target year
            A2P019: Geothermalnononononononononono
            A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Solar Thermalnononononononononono
            A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_heatnononononononononono
            A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Waste heat+HPnononononononononono
            A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_peat_heatnononononononononono
            A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum]
            A2P019: PVT_thnononononononononono
            A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Biomass_firewood_thnononononoyesnononono
            A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum]
            A2P019: Othernononononononononono
            A2P019 Other: Please specify imports in GWh/annum [GWh/annum]
            A2P020: Share of RES on-site / RES outside the boundary
            A2P020: Share of RES on-site / RES outside the boundary0000000000
            A2P021: GHG-balance calculated for the PED
            A2P021: GHG-balance calculated for the PED [tCO2/annum]4
            A2P022: KPIs related to the PED case study / PED Lab
            A2P022: Safety & Security
            A2P022: Health
            A2P022: Education
            A2P022: Mobility
            A2P022: EnergyYesYesYes
            A2P022: Water
            A2P022: Economic development
            A2P022: Housing and CommunitySpecify the associated KPIs
            A2P022: Waste
            A2P022: Other
            A2P023: Technological Solutions / Innovations - Energy Generation
            A2P023: Photovoltaicsyesyesnoyesyesyesyesyesyesyes
            A2P023: Solar thermal collectorsnononoyesyesnoyesnoyesyes
            A2P023: Wind Turbinesnononononononononono
            A2P023: Geothermal energy systemnonononoyesnononoyesyes
            A2P023: Waste heat recoverynonononoyesnonononono
            A2P023: Waste to energynononononononononoyes
            A2P023: Polygenerationnononononononononono
            A2P023: Co-generationnonononononoyesnonoyes
            A2P023: Heat Pumpnononoyesyesyesnonoyesyes
            A2P023: Hydrogennononononononononono
            A2P023: Hydropower plantnononononononononono
            A2P023: Biomassnonononononoyesnonono
            A2P023: Biogasnononononononononono
            A2P023: OtherPhotovoltaics are considered for the next yearsThe Co-generation is biomass based.
            A2P024: Technological Solutions / Innovations - Energy Flexibility
            A2P024: A2P024: Information and Communication Technologies (ICT)yesyesyesnononoyesyesnoyes
            A2P024: Energy management systemnoyesyesnonoyesyesyesnono
            A2P024: Demand-side managementyesnoyesnononoyesyesnono
            A2P024: Smart electricity gridyesyesnononononononono
            A2P024: Thermal Storagenonononoyesnoyesnoyesno
            A2P024: Electric Storagenoyesnonononoyesnonoyes
            A2P024: District Heating and Coolingnononoyesyesnoyesnoyesyes
            A2P024: Smart metering and demand-responsive control systemsyesnononononoyesnonono
            A2P024: P2P – buildingsnononononoyesnononono
            A2P024: OtherBidirectional electric vehicle (EV) charging (V2G)
            A2P025: Technological Solutions / Innovations - Energy Efficiency
            A2P025: Deep Retrofittingnonoyesyesnoyesnoyesnoyes
            A2P025: Energy efficiency measures in historic buildingsnonoyesnonoyesnononono
            A2P025: High-performance new buildingsnonononononoyesnonoyes
            A2P025: Smart Public infrastructure (e.g. smart lighting)nononononononononoyes
            A2P025: Urban data platformsnononononononononono
            A2P025: Mobile applications for citizensnononononononononoyes
            A2P025: Building services (HVAC & Lighting)noyesyesnonononononoyes
            A2P025: Smart irrigationnononononononononono
            A2P025: Digital tracking for waste disposalnononononononononoyes
            A2P025: Smart surveillancenonoyesnonononononoyes
            A2P025: Other
            A2P026: Technological Solutions / Innovations - Mobility
            A2P026: Efficiency of vehicles (public and/or private)noyesnononononononoyes
            A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances)nononononononononoyes
            A2P026: e-Mobilitynonononononoyesnonoyes
            A2P026: Soft mobility infrastructures and last mile solutionsnononononononononoyes
            A2P026: Car-free areanononononononononono
            A2P026: Other
            A2P027: Mobility strategies - Additional notes
            A2P027: Mobility strategies - Additional notes
            A2P028: Energy efficiency certificates
            A2P028: Energy efficiency certificatesNoYesYesYes
            A2P028: If yes, please specify and/or enter notesPassive house (2 buildings, 4 200 m2, from 2015)Energy Performance Certificate for each dwelling
            A2P029: Any other building / district certificates
            A2P029: Any other building / district certificatesNoNoYesNo
            A2P029: If yes, please specify and/or enter notesZero Emission Building (ZEB) with the highest ambitions (ZEB-COM) (admin building, 1 141 m2, 2016)
            A3P001: Relevant city /national strategy
            A3P001: Relevant city /national strategy
            • Promotion of energy communities (REC/CEC)
            • Smart cities strategies,
            • New development strategies
            • Smart cities strategies
            • Smart cities strategies,
            • Urban Renewal Strategies,
            • Energy master planning (SECAP, etc.)
            • Promotion of energy communities (REC/CEC)
            • Promotion of energy communities (REC/CEC),
            • National / international city networks addressing sustainable urban development and climate neutrality
            • Urban Renewal Strategies,
            • Energy master planning (SECAP, etc.),
            • Promotion of energy communities (REC/CEC),
            • Climate change adaption plan/strategy (e.g. Climate City contract),
            • National / international city networks addressing sustainable urban development and climate neutrality
            A3P002: Quantitative targets included in the city / national strategy
            A3P002: Quantitative targets included in the city / national strategyCity level targets Sustainable Urban Mobility Plan (PUMS) - 2019 | Targets: - by 2030 440,000 daily trips will no longer be made by car but on foot, by bike or by public transport; - by 2030 12% of vehicles will be electric; Sustainable Energy and Climate Action Plan (SECAP) - 2021 | Targets: - by 2025 deep renovation of 3% per year of residential homes (insulation of building envelopes and adoption of heat pump heating system); - by 2030 reduction of electricity consumption at least of 20% compared to 2018; - by 2030 100% coverage of electricity consumption for municipal buildings; - by 2030 increase public green areas by at least 10% Urban General Plan (PUG) - 2021 | Targets: - by 2030 net zero land consumption; National level targets Integrated National Energy and Climate Plan - 2020 | Targets: - by 2030 reduction of 43% for primary energy consumption, with respect to the reference 2007 scenario. - by 2030 increase of 30% of energy production from renewable sources; - by 2025 energy generation for electricity independent from the use of coal;
            A3P003: Strategies towards decarbonization of the gas grid
            A3P003: Strategies towards decarbonization of the gas grid
            • Electrification of Heating System based on Heat Pumps,
            • Electrification of Cooking Methods
            A3P003: Other
            A3P004: Identification of needs and priorities
            A3P004: Identification of needs and priorities-Allows for real physical equipment to be operated under a broad range of scenarios without depending on the real occurrence of the boundary conditions suitable for the experimental validation -Pioneer in addressing the concept and implementation of Microgrids and aims to become a leading experimental facility for improving the optimal development of Flexible Energy Buildings and Flexibility Aggregation.Bologna needs to reach the climate neutrality proceeding by ‘part’ of the city. Pilastro-Roveri is a promising district due to the following reasons: - some buildings need to be renovated both to increase the energy performance, the seismic behaviour, spaces liveability and comfort; - Pilastro is a residential area with the presence of a high percentage of vulnerable inhabitants affected by energy poverty phenomenon. This situation needs to be prioritized; - Pilastro is characterized by the presence of large underused green spaces that can represent a valuable resource for social cohesion and for heat island phenomenon mitigation; - Roveri is an industrial area where some small-medium enterprises are investing in order to improve their facilities and to efficiency their production cycle; - Roveri and Pilastro areas present complementary energy consumption curves throughout the day/week with a high potential for energy sharing and flexibility.
            A3P005: Sustainable behaviour
            A3P005: Sustainable behaviour-Improving the development of Net Zero Energy Buildings and Flexible Energy buildings.Bologna SECAP, as well as the participation to the 100 Climate-Neutral Cities, promotes the PED model as an enabling tool to foster city energy transition process. In Pilastro-Roveri district two main sustainable behaviours approaches can be identified: - bottom-up approach - some citizens are joining forces to create groups of energy self-consumption, in view of energy communities’ implementation and, at the same time, some companies have already undertaken some efficiency intervention on the production system by leveraging highly energy-efficient technologies; - top-down approach - GECO and GRETA are international ongoing projects on the area that promote innovation and energy transition with important fundings from the European Union, but with a particular focus on citizen engagement and participatory approach. Simultaneously, new and updated planning tools such as PUG, SECAP and SUMP identify in this part of Bologna city a key area to enable an ecological transition process holding together all relevant stakeholders - citizens, small-medium enterprises and Institutions. These two thrusts (bottom-up and top-down) need to be optimized in view of a participatory pathway towards the grounding of a Positive Energy District in Pilastro-Roveri.
            A3P006: Economic strategies
            A3P006: Economic strategies
            • Local trading
            • Demand management Living Lab
            • Innovative business models,
            • Demand management Living Lab
            • Local trading,
            • Existing incentives
            • Innovative business models
            • Innovative business models
            • Innovative business models,
            • PPP models,
            • Circular economy models,
            • Demand management Living Lab,
            • Existing incentives
            A3P006: Other
            A3P007: Social models
            A3P007: Social models
            • Behavioural Change / End-users engagement,
            • Citizen/owner involvement in planning and maintenance
            • Digital Inclusion,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Quality of Life,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Behavioural Change / End-users engagement,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour),
            • Other
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            • Co-creation / Citizen engagement strategies,
            • Affordability,
            • Prevention of energy poverty
            • Strategies towards (local) community-building,
            • Co-creation / Citizen engagement strategies,
            • Behavioural Change / End-users engagement,
            • Citizen Social Research,
            • Policy Forums,
            • Affordability,
            • Prevention of energy poverty,
            • Digital Inclusion,
            • Citizen/owner involvement in planning and maintenance,
            • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
            A3P007: OtherCampus Evenstad is a small department at Inland Norway University of Applied Sciences, with 220 students. Sharing knowledge is essential: Evenstad has regular visits from Politicians, decision-makers, researchers, environmental organizations, and energy- and building companies.
            A3P008: Integrated urban strategies
            A3P008: Integrated urban strategies
            • Strategic urban planning
            • Digital twinning and visual 3D models
            • District Energy plans
            • Strategic urban planning,
            • District Energy plans
            • Strategic urban planning,
            • Digital twinning and visual 3D models,
            • City Vision 2050,
            • SECAP Updates,
            • Building / district Certification
            A3P008: Other
            A3P009: Environmental strategies
            A3P009: Environmental strategies
            • Energy Neutral,
            • Carbon-free
            • Energy Neutral,
            • Low Emission Zone,
            • Pollutants Reduction,
            • Greening strategies
            • Energy Neutral
            • Low Emission Zone,
            • Net zero carbon footprint,
            • Carbon-free
            • Low Emission Zone
            • Low Emission Zone,
            • Carbon-free
            • Energy Neutral,
            • Low Emission Zone,
            • Net zero carbon footprint,
            • Life Cycle approach,
            • Pollutants Reduction,
            • Greening strategies
            A3P009: Other
            A3P010: Legal / Regulatory aspects
            A3P010: Legal / Regulatory aspects- European Commission has legislated on Energy Community (‘Renewable energy’ directive - 2018/2001/EU and ‘Common rules for the internal electricity market’ directive- 2019/944/EU). - Spanish building certification is regulated through Royal Decree 235/2013.Campus Evenstad became a prosumer in 2016, as the first with DSO Eidsiva. Evenstad is also one of the first three PV systems in Norway to receive green certificates.PEDs in Italy are meant as strategies towards climate-neutrality: at national/regional/local level a specific legislation on PEDs development is not yet available. However, the European Commission has legislated on Energy Community (‘Renewable energy’ directive - 2018/2001/EU and ‘Common rules for the internal electricity market’ directive- 2019/944/EU). Italy, starting from 2020, has transposed the Directives at national level (‘Milleproroghe’ decree then made effective by ‘Promotion of Renewable sources’ decree 199/2021). At regional level Emilia Romagna in May 2022 developed a law encouraging EC model diffusion (LR 5/2022 ‘Promotion and support of renewable energy communities and renewable energy self-consumers acting collectively’). Energy Community, according to Lindholm et al. 2021, can be considered as ‘a first implementation step towards PEDs.’
            B1P001: PED/PED relevant concept definition
            B1P001: PED/PED relevant concept definitionThe biggest impact is the demonstration of several new energy solutions for local communities. Statsbygg/Campus Evenstad contributes to the development of innovations, pushing technological development through purchasing and demonstration of the solutions. This is a benefit for both end users, energy service providers and society at large. Evenstad also contribute to developing the local business community. For example, local biomass chip production for CHP, development of V2G-software etc. Several key solutions have been important when aiming to achieve the goals of reduced emissions, increased self-sufficiency in energy, and an energy-flexible campus. Example Vehicle-to-grid (V2G): We realized bidirectional EV charging at Campus Evenstad in 2019, demonstrating V2G for the first time in Norway. The experiences from Evenstad provide increased knowledge and practical experience from purchasing, installing and operating the V2G solution, and can contribute to creating new solutions within the energy system. With the equipment installed, the batteries in EVs can supply power back to buildings or the power grid. Example solar cells (PV): We installed PV in 2013 when there were only a few grid-connected PV systems in Norway. The PV system was an important piece in changing the view on solar energy in Norway, where businesses, the public sector and private individuals started seeing the potential for solar energy also this far north. In 2022, the PV system was expanded with PV cells on the facade of the energy center. Example Solar collector system: Covers 100m2 of the roof surface of dormitories and supplies supplies 117 dormitories with all the hot water they need (4000m2 floor area. The solar collector system is connected to the district heating system, where the main heat source is bioenergy. Solar energy and bioenergy complement each other at different times of the year. Example battery bank: Among the 5 largest electrical batteries in Norway connected to the grid. Example CHP: First of its kind in Norway, generating heat and electricity from biomass. Already in 2010, fossil fuels were phased out by converting from oil to wood-chip heating.Pilastro-Roveri district can be considered as a PED-relevant area. Even though at the moment the area doesn’t meet annual energy positive balance, it addresses some relevant key aspects listed in the JPI UE PED Framework Definition such as: - high level of aspiration in terms of energy efficiency, energy flexibility and energy production; - integration of different systems and infrastructures; - inclusion of aspects not only related to energy sector, but also connected with social, economic and environmental sustainability.
            B1P002: Motivation behind PED/PED relevant project development
            B1P002: Motivation behind PED/PED relevant project developmentIn line with the EU's vision of "local energy communities", Campus Evenstad demonstrates energy actions that contribute to the clean energy transition. The campus has been developed over several years, demonstrating several innovative and sustainable technologies and energy solutions in a microgrid, e.g. vehicle to grid (V2G), biomass-based combined heat and power (CHP), solar energy, energy storage and zero emission buildings. It shows how to use new technology to enable zero emissions areas. Dedicated professionals, both Statsbygg's operating staff and researchers from FME ZEN have been central to the realization, together with dedicated management at the University campus, who have shown a great willingness to implement new solutions.Pilastro-Roveri district is not actually meant to become a PEDs. However, it can be considered as a PED-relevant case-study since a participatory transition pathway towards a more sustainable, efficient and resilient district is gaining ground, involving the main urban stakeholders. At the same time, the most recent city plan and policies (such as the city SECAPs - updated in 2021) are promoting PED model as a key strategy to guide Bologna towards climate neutrality by 2030.
            B1P003: Environment of the case study area
            B2P003: Environment of the case study areaSuburban areaUrban areaUrban areaRurbanRuralUrban area
            B1P004: Type of district
            B2P004: Type of district
            • New construction
            • Renovation
            • New construction,
            • Renovation
            • Renovation
            • New construction,
            • Renovation
            • Renovation
            B1P005: Case Study Context
            B1P005: Case Study Context
            • New Development
            • Retrofitting Area
            • Re-use / Transformation Area,
            • New Development,
            • Retrofitting Area
            • Retrofitting Area,
            • Preservation Area
            • Retrofitting Area
            • Retrofitting Area
            B1P006: Year of construction
            B1P006: Year of construction
            B1P007: District population before intervention - Residential
            B1P007: District population before intervention - Residential
            B1P008: District population after intervention - Residential
            B1P008: District population after intervention - Residential
            B1P009: District population before intervention - Non-residential
            B1P009: District population before intervention - Non-residential
            B1P010: District population after intervention - Non-residential
            B1P010: District population after intervention - Non-residential
            B1P011: Population density before intervention
            B1P011: Population density before intervention00000000
            B1P012: Population density after intervention
            B1P012: Population density after intervention00000000
            B1P013: Building and Land Use before intervention
            B1P013: Residentialnononoyesnoyesnononoyes
            B1P013 - Residential: Specify the sqm [m²]
            B1P013: Officenononononoyesnononoyes
            B1P013 - Office: Specify the sqm [m²]
            B1P013: Industry and Utilitynononononononononoyes
            B1P013 - Industry and Utility: Specify the sqm [m²]
            B1P013: Commercialnononononononononoyes
            B1P013 - Commercial: Specify the sqm [m²]
            B1P013: Institutionalnononononononononoyes
            B1P013 - Institutional: Specify the sqm [m²]
            B1P013: Natural areasyesnonononononononoyes
            B1P013 - Natural areas: Specify the sqm [m²]
            B1P013: Recreationalnononononononononoyes
            B1P013 - Recreational: Specify the sqm [m²]
            B1P013: Dismissed areasnononononononononoyes
            B1P013 - Dismissed areas: Specify the sqm [m²]
            B1P013: Othernononononononononono
            B1P013 - Other: Specify the sqm [m²]
            B1P014: Building and Land Use after intervention
            B1P014: Residentialnononoyesyesyesnononoyes
            B1P014 - Residential: Specify the sqm [m²]
            B1P014: Officenonononoyesyesnononoyes
            B1P014 - Office: Specify the sqm [m²]
            B1P014: Industry and Utilitynonononoyesnonononoyes
            B1P014 - Industry and Utility: Specify the sqm [m²]
            B1P014: Commercialnonononoyesnonononoyes
            B1P014 - Commercial: Specify the sqm [m²]
            B1P014: Institutionalnononononononononoyes
            B1P014 - Institutional: Specify the sqm [m²]
            B1P014: Natural areasnononononononononoyes
            B1P014 - Natural areas: Specify the sqm [m²]
            B1P014: Recreationalnonononoyesnonononoyes
            B1P014 - Recreational: Specify the sqm [m²]
            B1P014: Dismissed areasnononononononononoyes
            B1P014 - Dismissed areas: Specify the sqm [m²]
            B1P014: Othernononononononononono
            B1P014 - Other: Specify the sqm [m²]
            B2P001: PED Lab concept definition
            B2P001: PED Lab concept definitionaddressing the concept and implementation of Microgrids and aims to become a leading experimental facility for improving the optimal development of Flexible Energy Buildings and Flexibility Aggregation
            B2P002: Installation life time
            B2P002: Installation life time
            B2P003: Scale of action
            B2P003: ScaleVirtualDistrict
            B2P004: Operator of the installation
            B2P004: Operator of the installationIREC
            B2P005: Replication framework: Applied strategy to reuse and recycling the materials
            B2P005: Replication framework: Applied strategy to reuse and recycling the materials
            B2P006: Circular Economy Approach
            B2P006: Do you apply any strategy to reuse and recycling the materials?No
            B2P006: Other
            B2P007: Motivation for developing the PED Lab
            B2P007: Motivation for developing the PED Lab
            • Strategic,
            • Private
            B2P007: Other
            B2P008: Lead partner that manages the PED Lab
            B2P008: Lead partner that manages the PED LabResearch center/University
            B2P008: Other
            B2P009: Collaborative partners that participate in the PED Lab
            B2P009: Collaborative partners that participate in the PED Lab
            B2P009: Other
            B2P010: Synergies between the fields of activities
            B2P010: Synergies between the fields of activities
            B2P011: Available facilities to test urban configurations in PED Lab
            B2P011: Available facilities to test urban configurations in PED Lab
            • Demand-side management,
            • Energy storage,
            • Energy networks,
            • Efficiency measures,
            • Information and Communication Technologies (ICT)
            B2P011: Other
            B2P012: Incubation capacities of PED Lab
            B2P012: Incubation capacities of PED Lab
            • Monitoring and evaluation infrastructure,
            • Tools for prototyping and modelling,
            • Tools, spaces, events for testing and validation
            B2P013: Availability of the facilities for external people
            B2P013: Availability of the facilities for external people
            B2P014: Monitoring measures
            B2P014: Monitoring measures
            • Equipment
            B2P015: Key Performance indicators
            B2P015: Key Performance indicators
            • Energy,
            • Environmental
            B2P016: Execution of operations
            B2P016: Execution of operations
            B2P017: Capacities
            B2P017: Capacities- Building simulation model: thermal inertia and thermal loads of a building or community can be co-simulated with a building model. – System Operator and Aggregator simulation models: the interaction with remote control actions carried out by electricity System Operators or flexibility Aggregators can be simulated as well. – Grid simulation model: the physical interaction of the building with the grid power supply can be simulated enabling the experimental validation of flexibility services to the network.
            B2P018: Relations with stakeholders
            B2P018: Relations with stakeholders
            B2P019: Available tools
            B2P019: Available tools
            • Energy modelling
            B2P019: Available tools
            B2P020: External accessibility
            B2P020: External accessibility
            C1P001: Unlocking Factors
            C1P001: Recent technological improvements for on-site RES production3 - Moderately important1 - Unimportant4 - Important1 - Unimportant1 - Unimportant4 - Important5 - Very important4 - Important5 - Very important4 - Important
            C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant2 - Slightly important5 - Very important1 - Unimportant1 - Unimportant4 - Important
            C1P001: Energy Communities, P2P, Prosumers concepts5 - Very important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant5 - Very important5 - Very important4 - Important1 - Unimportant5 - Very important
            C1P001: Storage systems and E-mobility market penetration5 - Very important5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
            C1P001: Decreasing costs of innovative materials1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important
            C1P001: Financial mechanisms to reduce costs and maximize benefits3 - Moderately important5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant5 - Very important1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important
            C1P001: The ability to predict Multiple Benefits2 - Slightly important4 - Important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant4 - Important
            C1P001: The ability to predict the distribution of benefits and impacts4 - Important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant
            C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)4 - Important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important3 - Moderately important5 - Very important5 - Very important
            C1P001: Social acceptance (top-down)4 - Important1 - Unimportant4 - Important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important4 - Important5 - Very important3 - Moderately important
            C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)4 - Important1 - Unimportant4 - Important1 - Unimportant1 - Unimportant5 - Very important4 - Important4 - Important4 - Important4 - Important
            C1P001: Presence of integrated urban strategies and plans5 - Very important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important
            C1P001: Multidisciplinary approaches available for systemic integration4 - Important4 - Important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant4 - Important3 - Moderately important4 - Important
            C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects1 - Unimportant5 - Very important5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important4 - Important4 - Important
            C1P001: Availability of RES on site (Local RES)5 - Very important4 - Important5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important5 - Very important5 - Very important4 - Important
            C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders3 - Moderately important5 - Very important4 - Important1 - Unimportant1 - Unimportant4 - Important3 - Moderately important4 - Important1 - Unimportant3 - Moderately important
            C1P001: Any other UNLOCKING FACTORS1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P001: Any other UNLOCKING FACTORS (if any)
            C1P002: Driving Factors
            C1P002: Climate Change adaptation need3 - Moderately important4 - Important4 - Important1 - Unimportant1 - Unimportant5 - Very important3 - Moderately important4 - Important2 - Slightly important4 - Important
            C1P002: Climate Change mitigation need (local RES production and efficiency)3 - Moderately important4 - Important4 - Important1 - Unimportant1 - Unimportant5 - Very important5 - Very important4 - Important5 - Very important5 - Very important
            C1P002: Rapid urbanization trend and need of urban expansions2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P002: Urban re-development of existing built environment1 - Unimportant4 - Important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important5 - Very important
            C1P002: Economic growth need1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant3 - Moderately important
            C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)1 - Unimportant4 - Important5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important3 - Moderately important4 - Important
            C1P002: Territorial and market attractiveness1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
            C1P002: Energy autonomy/independence2 - Slightly important5 - Very important5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant4 - Important5 - Very important4 - Important4 - Important
            C1P002: Any other DRIVING FACTOR1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P002: Any other DRIVING FACTOR (if any)
            C1P003: Administrative barriers
            C1P003: Difficulty in the coordination of high number of partners and authorities1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant2 - Slightly important4 - Important4 - Important
            C1P003: Lack of good cooperation and acceptance among partners1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important
            C1P003: Lack of public participation1 - Unimportant2 - Slightly important4 - Important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant4 - Important1 - Unimportant2 - Slightly important
            C1P003: Lack of institutions/mechanisms to disseminate information3 - Moderately important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important
            C1P003:Long and complex procedures for authorization of project activities1 - Unimportant5 - Very important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important5 - Very important
            C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy1 - Unimportant5 - Very important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant2 - Slightly important4 - Important1 - Unimportant4 - Important
            C1P003: Complicated and non-comprehensive public procurement1 - Unimportant3 - Moderately important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant2 - Slightly important4 - Important4 - Important4 - Important
            C1P003: Fragmented and or complex ownership structure1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant5 - Very important3 - Moderately important2 - Slightly important4 - Important5 - Very important
            C1P003: City administration & cross-sectoral attitude/approaches (silos)1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant2 - Slightly important2 - Slightly important5 - Very important
            C1P003: Lack of internal capacities to support energy transition1 - Unimportant4 - Important3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important2 - Slightly important4 - Important
            C1P003: Any other Administrative BARRIER1 - Unimportant5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P003: Any other Administrative BARRIER (if any)
            C1P004: Policy barriers
            C1P004: Lack of long-term and consistent energy plans and policies4 - Important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important3 - Moderately important3 - Moderately important1 - Unimportant
            C1P004: Lacking or fragmented local political commitment and support on the long term4 - Important1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant4 - Important3 - Moderately important3 - Moderately important3 - Moderately important2 - Slightly important
            C1P004: Lack of Cooperation & support between national-regional-local entities1 - Unimportant2 - Slightly important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important3 - Moderately important3 - Moderately important3 - Moderately important3 - Moderately important
            C1P004: Any other Political BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P004: Any other Political BARRIER (if any)
            C1P005: Legal and Regulatory barriers
            C1P005: Inadequate regulations for new technologies1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important5 - Very important2 - Slightly important4 - Important4 - Important
            C1P005: Regulatory instability1 - Unimportant2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important3 - Moderately important3 - Moderately important
            C1P005: Non-effective regulations1 - Unimportant2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important3 - Moderately important4 - Important
            C1P005: Unfavorable local regulations for innovative technologies1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important4 - Important2 - Slightly important
            C1P005: Building code and land-use planning hindering innovative technologies1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant
            C1P005: Insufficient or insecure financial incentives3 - Moderately important5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important2 - Slightly important2 - Slightly important4 - Important
            C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant4 - Important
            C1P005: Shortage of proven and tested solutions and examples1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important3 - Moderately important2 - Slightly important
            C1P005: Any other Legal and Regulatory BARRIER1 - Unimportant4 - Important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P005: Any other Legal and Regulatory BARRIER (if any)
            C1P006: Environmental barriers
            C1P006: Environmental barriers
            C1P007: Technical barriers
            C1P007: Lack of skilled and trained personnel1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant4 - Important
            C1P007: Deficient planning3 - Moderately important5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant
            C1P007: Retrofitting work in dwellings in occupied state1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important5 - Very important5 - Very important
            C1P007: Lack of well-defined process1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant5 - Very important
            C1P007: Inaccuracy in energy modelling and simulation5 - Very important5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important1 - Unimportant4 - Important
            C1P007: Lack/cost of computational scalability1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant4 - Important
            C1P007: Grid congestion, grid instability1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important5 - Very important2 - Slightly important1 - Unimportant4 - Important
            C1P007: Negative effects of project intervention on the natural environment1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant2 - Slightly important1 - Unimportant2 - Slightly important
            C1P007: Energy retrofitting work in dense and/or historical urban environment1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant5 - Very important1 - Unimportant2 - Slightly important5 - Very important5 - Very important
            C1P007: Difficult definition of system boundaries1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant2 - Slightly important1 - Unimportant5 - Very important
            C1P007: Any other Thecnical BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P007: Any other Thecnical BARRIER (if any)Energy management systems of different new technologies does not "talk together" (e.g. solar inverter, V2G inverter). This creates challenges.
            C1P008: Social and Cultural barriers
            C1P008: Inertia1 - Unimportant4 - Important3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important
            C1P008: Lack of values and interest in energy optimization measurements1 - Unimportant5 - Very important5 - Very important1 - Unimportant1 - Unimportant2 - Slightly important3 - Moderately important5 - Very important4 - Important3 - Moderately important
            C1P008: Low acceptance of new projects and technologies1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant2 - Slightly important3 - Moderately important3 - Moderately important4 - Important3 - Moderately important
            C1P008: Difficulty of finding and engaging relevant actors4 - Important5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important3 - Moderately important4 - Important
            C1P008: Lack of trust beyond social network1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant2 - Slightly important3 - Moderately important5 - Very important
            C1P008: Rebound effect1 - Unimportant4 - Important2 - Slightly important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant4 - Important
            C1P008: Hostile or passive attitude towards environmentalism1 - Unimportant5 - Very important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant4 - Important3 - Moderately important2 - Slightly important
            C1P008: Exclusion of socially disadvantaged groups1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important
            C1P008: Non-energy issues are more important and urgent for actors1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important2 - Slightly important1 - Unimportant4 - Important
            C1P008: Hostile or passive attitude towards energy collaboration1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant
            C1P008: Any other Social BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P008: Any other Social BARRIER (if any)
            C1P009: Information and Awareness barriers
            C1P009: Insufficient information on the part of potential users and consumers5 - Very important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant2 - Slightly important5 - Very important4 - Important
            C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important3 - Moderately important3 - Moderately important3 - Moderately important4 - Important
            C1P009: Lack of awareness among authorities3 - Moderately important2 - Slightly important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important4 - Important1 - Unimportant3 - Moderately important
            C1P009: Information asymmetry causing power asymmetry of established actors2 - Slightly important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant2 - Slightly important1 - Unimportant3 - Moderately important
            C1P009: High costs of design, material, construction, and installation1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant4 - Important5 - Very important2 - Slightly important5 - Very important4 - Important
            C1P009: Any other Information and Awareness BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant5 - Very important1 - Unimportant1 - Unimportant1 - Unimportant
            C1P009: Any other Information and Awareness BARRIER (if any)Different interests - Grid/energy stakeholders and building stakeholders
            C1P010: Financial barriers
            C1P010: Hidden costs1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important2 - Slightly important2 - Slightly important4 - Important
            C1P010: Insufficient external financial support and funding for project activities1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important2 - Slightly important5 - Very important4 - Important
            C1P010: Economic crisis1 - Unimportant4 - Important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important4 - Important4 - Important
            C1P010: Risk and uncertainty2 - Slightly important5 - Very important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important5 - Very important4 - Important5 - Very important5 - Very important
            C1P010: Lack of consolidated and tested business models4 - Important5 - Very important4 - Important1 - Unimportant1 - Unimportant4 - Important5 - Very important4 - Important2 - Slightly important5 - Very important
            C1P010: Limited access to capital and cost disincentives1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant4 - Important4 - Important3 - Moderately important2 - Slightly important3 - Moderately important
            C1P010: Any other Financial BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P010: Any other Financial BARRIER (if any)
            C1P011: Market barriers
            C1P011: Split incentives1 - Unimportant4 - Important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important1 - Unimportant5 - Very important
            C1P011: Energy price distortion1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important3 - Moderately important5 - Very important
            C1P011: Energy market concentration, gatekeeper actors (DSOs)1 - Unimportant5 - Very important3 - Moderately important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant3 - Moderately important5 - Very important4 - Important
            C1P011: Any other Market BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
            C1P011: Any other Market BARRIER (if any)
            C1P012: Stakeholders involved
            C1P012: Government/Public Authorities
            • Design/demand aggregation
            • Planning/leading
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation
            C1P012: Research & Innovation
            • Design/demand aggregation
            • Monitoring/operation/management
            • Planning/leading,
            • Design/demand aggregation
            C1P012: Financial/Funding
            • Planning/leading
            • Construction/implementation
            • Design/demand aggregation,
            • Construction/implementation
            C1P012: Analyst, ICT and Big Data
            • Monitoring/operation/management
            • Planning/leading
            • Monitoring/operation/management
            • Planning/leading,
            • Design/demand aggregation,
            • Monitoring/operation/management
            C1P012: Business process management
            • Design/demand aggregation
            • Planning/leading
            • Planning/leading
            • None
            C1P012: Urban Services providers
            • Design/demand aggregation
            • Planning/leading
            • Planning/leading,
            • Design/demand aggregation
            C1P012: Real Estate developers
            • Construction/implementation
            • Planning/leading
            • Planning/leading,
            • Monitoring/operation/management
            • None
            C1P012: Design/Construction companies
            • Design/demand aggregation
            • Planning/leading
            • Construction/implementation
            • Construction/implementation
            C1P012: End‐users/Occupants/Energy Citizens
            • Monitoring/operation/management
            • Monitoring/operation/management
            • Monitoring/operation/management
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            C1P012: Social/Civil Society/NGOs
            • Design/demand aggregation
            • Construction/implementation
            • None
            • Planning/leading,
            • Design/demand aggregation
            C1P012: Industry/SME/eCommerce
            • Construction/implementation
            • Design/demand aggregation
            • Construction/implementation
            • Planning/leading,
            • Design/demand aggregation,
            • Construction/implementation,
            • Monitoring/operation/management
            C1P012: Other
            C1P012: Other (if any)
            Summary

            Authors (framework concept)

            Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)

            Contributors (to the content)

            Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)

            Implemented by

            Boutik.pt: Filipe Martins, Jamal Khan
            Marek Suchánek (Czech Technical University in Prague)