Name | Project | Type | Compare |
---|---|---|---|
Romania, Alba Iulia PED | ASCEND – Accelerate poSitive Clean ENergy Districts | PED Case Study | Compare |
Romania, Alba Iulia PED | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Uncompare |
Munich, Harthof district | PED Case Study | Compare | |
Lublin | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Bærum, Eiksveien 116 | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Compare |
Findhorn, the Park | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Amsterdam, Buiksloterham PED | ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities | PED Case Study | Uncompare |
Schönbühel-Aggsbach, Schönbühel an der Donau | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Umeå, Ålidhem district | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Aalborg East | PED Relevant Case Study / PED Lab | Compare | |
Ankara, Çamlık District | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study / PED Relevant Case Study | Compare |
Trenčín | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Luxembourg, Betzdorf | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Vantaa, Aviapolis | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Vidin, Himik and Bononia | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Oslo, Verksbyen | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Uden, Loopkantstraat | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Relevant Case Study | Compare |
Zaragoza, Actur | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Relevant Case Study | Compare |
Aarhus, Brabrand | BIPED – Building Intelligent Positive Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Riga, Ķīpsala, RTU smart student city | ExPEDite – Enabling Positive Energy Districts through Digital Twins | PED Case Study | Compare |
Izmir, District of Karşıyaka | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Istanbul, Ozyegin University Campus | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Uncompare |
Espoo, Kera | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study / PED Relevant Case Study | Compare |
Borlänge, Rymdgatan’s Residential Portfolio | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Freiburg, Waldsee | PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district | PED Case Study | Compare |
Innsbruck, Campagne-Areal | PED Relevant Case Study | Compare | |
Graz, Reininghausgründe | PED Case Study | Compare | |
Stor-Elvdal, Campus Evenstad | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Relevant Case Study | Compare |
Oulu, Kaukovainio | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Halmstad, Fyllinge | PED Relevant Case Study | Uncompare | |
Lund, Brunnshög district | PED Case Study | Compare | |
Vienna, Am Kempelenpark | PED Case Study | Compare | |
Évora, Portugal | POCITYF – A POsitive Energy CITY Transformation Framework | PED Relevant Case Study / PED Lab | Uncompare |
Kladno, Sletiště (Sport Area), PED Winter Stadium | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Uncompare |
Groningen, PED South | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Groningen, PED North | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | |
Maia, Sobreiro Social Housing | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Lab | Compare |
Lubia (Soria), CEDER-CIEMAT | PED Lab | Compare | |
Tampere, Ilokkaanpuisto district | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study | Compare |
Leon, Former Sugar Factory district | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Istanbul, Kadikoy district, Caferaga | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Espoo, Leppävaara district, Sello center | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Espoo, Espoonlahti district, Lippulaiva block | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Salzburg, Gneis district | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Barcelona, Santa Coloma de Gramenet | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Tartu, City centre area | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study / PED Lab | Uncompare |
Bologna, Pilastro-Roveri district | GRETA – GReen Energy Transition Actions | PED Relevant Case Study | Compare |
Barcelona, SEILAB & Energy SmartLab | PED Lab | Compare | |
Leipzig, Baumwollspinnerei district | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Kifissia, Energy community | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
Title | Groningen, PED North | Romania, Alba Iulia PED | Halmstad, Fyllinge | Tartu, City centre area | Amsterdam, Buiksloterham PED | Évora, Portugal | Kladno, Sletiště (Sport Area), PED Winter Stadium | Istanbul, Ozyegin University Campus |
---|---|---|---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | ||||||||
A1P001: Name of the PED case study / PED Lab | Groningen, PED North | Romania, Alba Iulia PED | Halmstad, Fyllinge | Tartu, City centre area | Amsterdam, Buiksloterham PED | Évora, Portugal | Kladno, Sletiště (Sport Area), PED Winter Stadium | Istanbul, Ozyegin University Campus |
A1P002: Map / aerial view / photos / graphic details / leaflet | ||||||||
A1P002: Map / aerial view / photos / graphic details / leaflet | ||||||||
A1P003: Categorisation of the PED site | ||||||||
PED case study | no | yes | no | no | yes | no | no | no |
PED relevant case study | no | no | yes | yes | no | yes | yes | yes |
PED Lab. | yes | no | no | yes | no | yes | no | no |
A1P004: Targets of the PED case study / PED Lab | ||||||||
Climate neutrality | yes | yes | no | yes | yes | no | yes | yes |
Annual energy surplus | yes | yes | no | no | yes | yes | yes | no |
Energy community | yes | yes | yes | no | yes | yes | yes | no |
Circularity | yes | no | no | yes | yes | no | no | no |
Air quality and urban comfort | no | yes | no | no | no | no | no | yes |
Electrification | no | yes | no | yes | yes | no | yes | yes |
Net-zero energy cost | no | no | no | no | no | no | no | no |
Net-zero emission | yes | no | no | yes | yes | no | no | no |
Self-sufficiency (energy autonomous) | no | yes | no | no | no | no | no | no |
Maximise self-sufficiency | no | yes | no | yes | no | no | no | no |
Other | no | no | no | no | no | no | no | yes |
Other (A1P004) | almost nZEB district | |||||||
A1P005: Phase of the PED case study / PED Lab | ||||||||
A1P005: Project Phase of your case study/PED Lab | Implementation Phase | Implementation Phase | Planning Phase | Implementation Phase | Implementation Phase | Implementation Phase | Planning Phase | Implementation Phase |
A1P006: Start Date | ||||||||
A1P006: Start date | 12/18 | 01/24 | 01/21 | 02/16 | 11/19 | 10/19 | 2022 | 10/24 |
A1P007: End Date | ||||||||
A1P007: End date | 12/23 | 12/26 | 01/30 | 07/22 | 10/25 | 09/24 | 10/28 | |
A1P008: Reference Project | ||||||||
A1P008: Reference Project | ||||||||
A1P009: Data availability | ||||||||
A1P009: Data availability |
|
|
|
|
|
|
|
|
A1P009: Other | https://smartcity-atelier.eu/about/lighthouse-cities/amsterdam/ | |||||||
A1P010: Sources | ||||||||
Any publication, link to website, deliverable referring to the PED/PED Lab |
|
| ||||||
A1P011: Geographic coordinates | ||||||||
X Coordinate (longitude): | 6.535121 | 23.580112098023235 | 12.92054 | 26.722737 | 4.9041 | -7.909377 | 14.09296 | 29.258300 |
Y Coordinate (latitude): | 53.234846 | 46.077015278680115 | 56.65194 | 58.380713 | 52.3676 | 38.570804 | 50.13715 | 41.030600 |
A1P012: Country | ||||||||
A1P012: Country | Netherlands | Romania | Sweden | Estonia | Netherlands | Portugal | Czech Republic | Turkey |
A1P013: City | ||||||||
A1P013: City | Groningen | Alba Iulia | Halmstad | Tartu | Amsterdam | Évora | Kladno | Istanbul |
A1P014: Climate Zone (Köppen Geiger classification) | ||||||||
A1P014: Climate Zone (Köppen Geiger classification). | Cfa | Dfb | Dwb | Dfb | Cfb | Csa | Cfb | Cfa |
A1P015: District boundary | ||||||||
A1P015: District boundary | Functional | Functional | Geographic | Functional | Functional | Geographic | Geographic | Geographic |
Other | Geographic | V1* (ca 8 buildings) | ||||||
A1P016: Ownership of the case study/PED Lab | ||||||||
A1P016: Ownership of the case study/PED Lab: | Mixed | Public | Mixed | Private | Mixed | Mixed | Mixed | Private |
A1P017: Ownership of the land / physical infrastructure | ||||||||
A1P017: Ownership of the land / physical infrastructure: | Multiple Owners | Single Owner | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners | Single Owner |
A1P018: Number of buildings in PED | ||||||||
A1P018: Number of buildings in PED | 7 | 6 | 250 | 18 | 60 | 8 | 15 | |
A1P019: Conditioned space | ||||||||
A1P019: Conditioned space [m²] | 1.01 | 35217 | 28500 | |||||
A1P020: Total ground area | ||||||||
A1P020: Total ground area [m²] | 17.132 | 8423.45 | 793144 | 285.400 | ||||
A1P021: Floor area ratio: Conditioned space / total ground area | ||||||||
A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
A1P022: Financial schemes | ||||||||
A1P022a: Financing - PRIVATE - Real estate | yes | no | yes | yes | yes | no | yes | yes |
A1P022a: Add the value in EUR if available [EUR] | 6500000 | |||||||
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no | no | yes | no |
A1P022b: Add the value in EUR if available [EUR] | ||||||||
A1P022c: Financing - PRIVATE - Other | yes | no | no | no | no | no | no | no |
A1P022c: Add the value in EUR if available [EUR] | ||||||||
A1P022d: Financing - PUBLIC - EU structural funding | no | yes | no | yes | no | no | yes | no |
A1P022d: Add the value in EUR if available [EUR] | 4000000 | |||||||
A1P022e: Financing - PUBLIC - National funding | yes | yes | no | yes | no | no | no | no |
A1P022e: Add the value in EUR if available [EUR] | 8000000 | |||||||
A1P022f: Financing - PUBLIC - Regional funding | no | yes | no | no | no | no | no | no |
A1P022f: Add the value in EUR if available [EUR] | ||||||||
A1P022g: Financing - PUBLIC - Municipal funding | yes | yes | no | no | no | no | yes | no |
A1P022g: Add the value in EUR if available [EUR] | ||||||||
A1P022h: Financing - PUBLIC - Other | no | no | no | no | no | no | no | no |
A1P022h: Add the value in EUR if available [EUR] | ||||||||
A1P022i: Financing - RESEARCH FUNDING - EU | yes | no | yes | no | yes | yes | yes | yes |
A1P022i: Add the value in EUR if available [EUR] | 19998275 | |||||||
A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | no | no | no | yes | no |
A1P022j: Add the value in EUR if available [EUR] | ||||||||
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no | no | no | no |
A1P022k: Add the value in EUR if available [EUR] | ||||||||
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no | no | no | no |
A1P022l: Add the value in EUR if available [EUR] | ||||||||
A1P022: Other | ||||||||
A1P023: Economic Targets | ||||||||
A1P023: Economic Targets |
|
|
|
|
|
|
| |
A1P023: Other | Boosting sustainability for public schools | |||||||
A1P024: More comments: | ||||||||
A1P024: More comments: | In addition to having the most energy efficient academic building in Turkey, the university campus also has 3 buildings with LEED NC Campus certificate and LEED BD+C Gold certificate. In addition, it aims to continuously improve the energy efficiency objectives on campus in an innovative way. For this purpose, energy management and storage systems are being installed in the Dormitory 6 building, which is used as the demo area of the LEGOFIT project, for the purpose of turning it into a PED project. | |||||||
A1P025: Estimated PED case study / PED LAB costs | ||||||||
A1P025: Estimated PED case study / PED LAB costs [mil. EUR] | 3.5 | 25 | 1 | |||||
Contact person for general enquiries | ||||||||
A1P026: Name | Jasper Tonen, Elisabeth Koops | Tudor Drâmbărean | Markus Olofsgård | Jaanus Tamm | Omar Shafqat | João Bravo Dias | David Škorňa | Cem Keskin |
A1P027: Organization | Municipality of Groningen | Municipality of Alba Iulia | AFRY | Tartu City Government | Amsterdam University of Applied Sciences | EDP Labelec | Město Kladno | Center for Energy, Environment and Economy, Ozyegin University |
A1P028: Affiliation | Municipality / Public Bodies | Municipality / Public Bodies | Other | Municipality / Public Bodies | Research Center / University | SME / Industry | Municipality / Public Bodies | Research Center / University |
A1P028: Other | Maria Elena Seemann | |||||||
A1P029: Email | Jasper.tonen@groningen.nl | tudor.drambarean@apulum.ro | markus.olofsgard@afry.com | Jaanus.tamm@tartu.ee | o.shafqat@hva.nl | joao.bravodias@edp.pt | david.skorna@mestokladno.cz | cem.keskin@ozyegin.edu.tr |
Contact person for other special topics | ||||||||
A1P030: Name | Maria-Elena Seemann | Kaspar Alev | Omar Shafqat | Michal Kuzmič | M. Pınar Mengüç | |||
A1P031: Email | maria.seemann@apulum.roapul | Kaspar.alev@tartu.ee | o.shafqat@hva.nl | michal.kuzmic@cvut.cz | pinar.menguc@ozyegin.edu.tr | |||
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes |
A2P001: Fields of application | ||||||||
A2P001: Fields of application |
|
|
|
|
|
|
|
|
A2P001: Other | ||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | ||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | Energy efficiency: - buildings energy retrofit supported by tax bonuses - replacing heat supply technologies Energy production: - installation of new (PV) systems for renewable on-site energy production; - presence of a large PV plant in the South East (2 solar parks: 12MW and 107MW) and North area (0,4 MW) Energy flexibility: - energy storage solutions, battery storage and possible hydrogen production - GRID balancing services E-mobility - Installation of new charging stations for electric vehicles; Urban Management - make use of the organizational structure Waste Management - circular use of municipal waste streams | Thermal rehabilitation of the main building, and investments in the energy efficiency and consumption fields. | link based regulation of electricity grid | Energy efficiency: - buildings retrofitting - combined public and private financing - low temperature central heating - LED lighting Energy production: - installation of photovoltaic (PV) systems for renewable on-site energy production; Digital technologies: - smart-meters smart home system. Smart city information platform E-mobility - Installation of new charging stations for electric vehicles; - e-bike/bikesharing services implementation. Urban comfort and air quality - Control units for air pollutants concentration (PM2.5, PM10, NO2) - Sustainable Energy and Climate Action Plan - SECAP) | City vision, Innovation Ateliers | Trnsys, PV modelling tools, CAD | LEED NC Campus + LEGOFIT Project Energy Efficiency: Tri- generation, Compliance with ISO 50001, ASHRAE 90.1, energy efficient appliances, HVAC and lighting Energy flexibility: Energy demand management Energy production: Solar PVs Onsite + (to be installed more) E-mobility: EV Charging stations Indoor Air Quality: Energy Management System, Compliance with ASHRAE 62.1, ASHRAE 55 Construction materials: Passive systems, LEED certified buildings, innovative materials such as PCM Waste Management: Zero waste document | |
A2P003: Application of ISO52000 | ||||||||
A2P003: Application of ISO52000 | No | Yes | No | No | Yes | No | No | Yes |
A2P004: Appliances included in the calculation of the energy balance | ||||||||
A2P004: Appliances included in the calculation of the energy balance | No | Yes | No | Yes | No | Yes | Yes | Yes |
A2P005: Mobility included in the calculation of the energy balance | ||||||||
A2P005: Mobility included in the calculation of the energy balance | No | No | Yes | No | No | Yes | No | No |
A2P006: Description of how mobility is included (or not included) in the calculation | ||||||||
A2P006: Description of how mobility is included (or not included) in the calculation | Mobility, till now, is not included in the energy model. | There will be 1 EV station placed nearby the main building. This would be the link to the mobility field. | Not yet included. | Not included, the campus is a non car area except emergencies | ||||
A2P007: Annual energy demand in buildings / Thermal demand | ||||||||
A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum] | 2.3 | 0.982 | 9.1 | 1.4 | ||||
A2P008: Annual energy demand in buildings / Electric Demand | ||||||||
A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum] | 0.33 | 0.048441 | 0.3 | |||||
A2P009: Annual energy demand for e-mobility | ||||||||
A2P009: Annual energy demand for e-mobility [GWh/annum] | ||||||||
A2P010: Annual energy demand for urban infrastructure | ||||||||
A2P010: Annual energy demand for urban infrastructure [GWh/annum] | ||||||||
A2P011: Annual renewable electricity production on-site during target year | ||||||||
A2P011: PV | no | yes | yes | yes | yes | no | yes | yes |
A2P011: PV - specify production in GWh/annum [GWh/annum] | 1.1 | |||||||
A2P011: Wind | no | no | no | no | no | no | no | no |
A2P011: Wind - specify production in GWh/annum [GWh/annum] | ||||||||
A2P011: Hydro | no | no | no | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum [GWh/annum] | ||||||||
A2P011: Biomass_el | no | no | no | no | yes | no | no | no |
A2P011: Biomass_el - specify production in GWh/annum [GWh/annum] | ||||||||
A2P011: Biomass_peat_el | no | no | no | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum] | ||||||||
A2P011: PVT_el | no | no | no | no | no | no | no | no |
A2P011: PVT_el - specify production in GWh/annum [GWh/annum] | ||||||||
A2P011: Other | no | no | no | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum [GWh/annum] | ||||||||
A2P012: Annual renewable thermal production on-site during target year | ||||||||
A2P012: Geothermal | yes | no | yes | no | yes | no | no | no |
A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum] | ||||||||
A2P012: Solar Thermal | yes | no | no | yes | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum] | 0.5 | |||||||
A2P012: Biomass_heat | yes | no | no | no | yes | no | no | no |
A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum] | 0.1 | |||||||
A2P012: Waste heat+HP | yes | no | no | no | yes | no | yes | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum] | 1.7 | |||||||
A2P012: Biomass_peat_heat | no | no | no | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum] | ||||||||
A2P012: PVT_th | yes | no | no | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum] | ||||||||
A2P012: Biomass_firewood_th | no | no | no | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum] | ||||||||
A2P012: Other | no | yes | no | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum [GWh/annum] | ||||||||
A2P013: Renewable resources on-site - Additional notes | ||||||||
A2P013: Renewable resources on-site - Additional notes | Geothermal heatpump systems, Waste heat from data centers | Only PVs - 940 PVs on the main building | Waste heat from cooling the ice rink. | |||||
A2P014: Annual energy use | ||||||||
A2P014: Annual energy use [GWh/annum] | 0.000048441 | 2.1 | 3.5 | |||||
A2P015: Annual energy delivered | ||||||||
A2P015: Annual energy delivered [GWh/annum] | 0.000113331 | |||||||
A2P016: Annual non-renewable electricity production on-site during target year | ||||||||
A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum] | ||||||||
A2P017: Annual non-renewable thermal production on-site during target year | ||||||||
A2P017: Gas | no | no | no | no | yes | no | no | no |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||||
A2P017: Coal | no | no | no | no | yes | no | no | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||||
A2P017: Oil | no | no | no | no | yes | no | no | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||||
A2P017: Other | no | yes | no | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum] | ||||||||
A2P018: Annual renewable electricity imports from outside the boundary during target year | ||||||||
A2P018: PV | no | no | no | no | yes | no | no | yes |
A2P018 - PV: specify production in GWh/annum if available [GWh/annum] | 0.00045547 | |||||||
A2P018: Wind | no | no | no | no | yes | no | no | no |
A2P018 - Wind: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P018: Hydro | no | no | no | no | yes | no | no | no |
A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P018: Biomass_el | no | no | no | no | yes | no | no | no |
A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P018: Biomass_peat_el | no | no | no | no | yes | no | no | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P018: PVT_el | no | no | no | no | yes | no | no | no |
A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P018: Other | no | yes | no | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available [GWh/annum] | ||||||||
A2P019: Annual renewable thermal imports from outside the boundary during target year | ||||||||
A2P019: Geothermal | no | no | no | no | yes | no | no | no |
A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Solar Thermal | no | no | no | no | yes | no | no | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Biomass_heat | no | no | no | no | yes | no | no | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Waste heat+HP | no | no | no | no | yes | no | no | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Biomass_peat_heat | no | no | no | no | yes | no | no | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: PVT_th | no | no | no | no | yes | no | no | no |
A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Biomass_firewood_th | no | no | no | no | yes | no | no | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P019: Other | no | yes | no | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum [GWh/annum] | ||||||||
A2P020: Share of RES on-site / RES outside the boundary | ||||||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | ||||||||
A2P021: GHG-balance calculated for the PED [tCO2/annum] | 980 | 250 | -104 | |||||
A2P022: KPIs related to the PED case study / PED Lab | ||||||||
A2P022: Safety & Security | yes | |||||||
A2P022: Health | yes | |||||||
A2P022: Education | yes | |||||||
A2P022: Mobility | yes | |||||||
A2P022: Energy | yes | Energy demand (heating and hot water), Energy demand (cooling), Cooling demand, Distributin losses, PV production, RES production, OER, Primafry Non-renewable energy balance, AMR, HMR, CO2 balance | ||||||
A2P022: Water | yes | |||||||
A2P022: Economic development | yes | Investment cost, Caputal cost, Operation cost, payback period, NPV, cummulated cash flow, savings, Life cycle, ROI, SROI | ||||||
A2P022: Housing and Community | ||||||||
A2P022: Waste | ||||||||
A2P022: Other | ||||||||
A2P023: Technological Solutions / Innovations - Energy Generation | ||||||||
A2P023: Photovoltaics | yes | yes | yes | yes | yes | yes | yes | yes |
A2P023: Solar thermal collectors | yes | yes | no | no | no | yes | no | no |
A2P023: Wind Turbines | no | no | no | no | no | no | no | yes |
A2P023: Geothermal energy system | yes | no | no | no | yes | no | no | no |
A2P023: Waste heat recovery | yes | no | no | no | yes | no | yes | no |
A2P023: Waste to energy | yes | no | no | no | yes | no | no | no |
A2P023: Polygeneration | no | yes | no | no | no | no | no | no |
A2P023: Co-generation | no | yes | no | no | no | no | no | yes |
A2P023: Heat Pump | yes | yes | no | no | yes | no | yes | yes |
A2P023: Hydrogen | no | no | no | no | no | no | no | no |
A2P023: Hydropower plant | no | no | no | no | no | no | no | no |
A2P023: Biomass | no | no | no | yes | yes | no | no | no |
A2P023: Biogas | no | no | no | yes | yes | no | no | no |
A2P023: Other | ||||||||
A2P024: Technological Solutions / Innovations - Energy Flexibility | ||||||||
A2P024: A2P024: Information and Communication Technologies (ICT) | yes | yes | yes | yes | yes | yes | yes | yes |
A2P024: Energy management system | yes | yes | no | yes | yes | yes | yes | yes |
A2P024: Demand-side management | yes | yes | yes | no | yes | no | yes | yes |
A2P024: Smart electricity grid | no | yes | yes | no | yes | yes | no | no |
A2P024: Thermal Storage | yes | no | no | no | yes | yes | no | no |
A2P024: Electric Storage | yes | yes | no | no | yes | yes | no | yes |
A2P024: District Heating and Cooling | yes | no | no | yes | yes | no | yes | yes |
A2P024: Smart metering and demand-responsive control systems | yes | yes | yes | no | yes | yes | yes | yes |
A2P024: P2P – buildings | no | yes | no | no | yes | yes | no | no |
A2P024: Other | ||||||||
A2P025: Technological Solutions / Innovations - Energy Efficiency | ||||||||
A2P025: Deep Retrofitting | no | yes | no | yes | yes | no | yes | no |
A2P025: Energy efficiency measures in historic buildings | yes | no | no | no | yes | yes | no | no |
A2P025: High-performance new buildings | yes | no | no | no | yes | no | no | yes |
A2P025: Smart Public infrastructure (e.g. smart lighting) | yes | yes | no | yes | yes | no | no | no |
A2P025: Urban data platforms | yes | yes | no | yes | yes | yes | yes | no |
A2P025: Mobile applications for citizens | no | no | no | yes | yes | yes | no | no |
A2P025: Building services (HVAC & Lighting) | no | yes | no | no | yes | yes | yes | yes |
A2P025: Smart irrigation | no | no | no | no | yes | no | no | yes |
A2P025: Digital tracking for waste disposal | no | no | no | no | yes | yes | no | no |
A2P025: Smart surveillance | no | no | no | yes | no | yes | no | yes |
A2P025: Other | ||||||||
A2P026: Technological Solutions / Innovations - Mobility | ||||||||
A2P026: Efficiency of vehicles (public and/or private) | no | yes | no | yes | yes | no | no | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | no | yes | no | yes | yes | no | no | no |
A2P026: e-Mobility | yes | yes | no | yes | yes | yes | no | yes |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | no | yes | yes | no | yes |
A2P026: Car-free area | no | no | no | no | yes | no | no | yes |
A2P026: Other | ||||||||
A2P027: Mobility strategies - Additional notes | ||||||||
A2P027: Mobility strategies - Additional notes | The new mobility plan integrates the PED area | |||||||
A2P028: Energy efficiency certificates | ||||||||
A2P028: Energy efficiency certificates | Yes | Yes | No | Yes | No | Yes | Yes | |
A2P028: If yes, please specify and/or enter notes | Energy Performance Certificate | National standards apply. | ||||||
A2P029: Any other building / district certificates | ||||||||
A2P029: Any other building / district certificates | Yes | No | No | No | Yes | |||
A2P029: If yes, please specify and/or enter notes | LEED BD+C, LEED NC CAMPUS | |||||||
A3P001: Relevant city /national strategy | ||||||||
A3P001: Relevant city /national strategy |
|
|
|
|
|
|
|
|
A3P002: Quantitative targets included in the city / national strategy | ||||||||
A3P002: Quantitative targets included in the city / national strategy | 40% reduction in emissions by 2030 according to the Covenant of Mayors | Carbon neutrality 2050 | ||||||
A3P003: Strategies towards decarbonization of the gas grid | ||||||||
A3P003: Strategies towards decarbonization of the gas grid |
|
|
|
|
|
| ||
A3P003: Other | Boiler Automation, Energy Management System, Electric Battery Storage, Demand Management and Flexible Pricing | |||||||
A3P004: Identification of needs and priorities | ||||||||
A3P004: Identification of needs and priorities | - Thermal rehabilitation - Heat pumps - Smart system capable o various connections and data export - Usage of the energy produced by PVs placed on 3 buildings within the PED | Carbon and Energy Neutrality | ||||||
A3P005: Sustainable behaviour | ||||||||
A3P005: Sustainable behaviour | In Groningen we are working with different sustainable behaviours approaches and also developed the Unified Citizen Engagement Approach (UCEA). Currently, there are two different approaches in use in the municipality of Groningen: the District energy approach (Wijkgerichte aanpak, developed by the Municipality of Groningen) and the Cooperative approach (Coöperative Aanpak, developed by Grunneger Power). Based upon those approaches and knowledge that is gained through social research executed by TNO and HUAS the new Unified Citizen Engagement Approach (UCEA) has been developed. | - Education - Replacement of the non-performant PVs - Professional maintenance of the PV system - Reduce of consumptions - Intelligent systems to recover heat - Intelligent system to permit the usage of domestic water from the heating system | Under LEGOFIT project, promoting sustainable behavior for better occupant experience is a targeted aim under a work package. | |||||
A3P006: Economic strategies | ||||||||
A3P006: Economic strategies |
|
|
|
|
|
| ||
A3P006: Other | ||||||||
A3P007: Social models | ||||||||
A3P007: Social models |
|
|
|
|
|
| ||
A3P007: Other | ||||||||
A3P008: Integrated urban strategies | ||||||||
A3P008: Integrated urban strategies |
|
|
|
|
|
|
| |
A3P008: Other | ||||||||
A3P009: Environmental strategies | ||||||||
A3P009: Environmental strategies |
|
|
|
|
|
|
| |
A3P009: Other | ||||||||
A3P010: Legal / Regulatory aspects | ||||||||
A3P010: Legal / Regulatory aspects | At national/regional/local level a legislation on PEDs development is not yet available in the Netherlands. There will be a new Environmental Act and Heat Act in the nearby future. We are working on a paper about the current legal barriers, which are in short for Groningen: Lack of legal certainty and clarity with regard to the energy legislation. Lack of coherence between policy and legislation from different ministries. The planned revision of the Dutch Heat Law prevents Groningen from effectively realizing sustainable heat transition plans and goals. Lack of capacity on the distribution grid for electricity | Regulatory sandbox | ISO 45001, ISO 14001, ISO 50001, Zero Waste Policy | |||||
B1P001: PED/PED relevant concept definition | ||||||||
B1P001: PED/PED relevant concept definition | Positive energy district | Functional PED | The PED main objective is to achieve the energy transition while preserving cultural heritage and improving citizen’s quality of life. | Onsite Energy Ratio > 1 | The campus should be considered a PED case study due to its exemplary commitment to sustainability and energy efficiency, as evidenced by several of its buildings achieving LEED certification. This certification underscores the campus's adherence to rigorous environmental standards and its proactive steps towards reducing carbon footprints. Also, the integration of sustainable practices across the campus aligns with the PED framework, which aims to create urban areas that produce more energy than they consume. Therefore, this campus serves as a model of how educational institutions can lead the way in fostering sustainable communities and advancing the goals of PED. | |||
B1P002: Motivation behind PED/PED relevant project development | ||||||||
B1P002: Motivation behind PED/PED relevant project development | Creation of an area which aims to be sustainable in terms of energy sufficiency and efficiency. | Brown field development of a former industrial neighbourhood into a low-carbon, smart Positive Energy District with mixed uses. | POCITYF brings together eight cities (Lightouse and Fellow cities), all having cultural heritage areas in their territory. All are intrinsically motivated to participate in the necessary energy transition not only for their conventional city districts of mixed-used, but also for districts with individually specificities as those belonging in their cultural heritage, which at the moment may be acting as barriers for their further environmental sustainability, but after POCITYF will be acting as a promising building retrofits roadmap for similar and other EU cities. | Strategic, economic | The purpose of implementing the PED project on this sustainable campus, where several buildings have LEED certification, is to further enhance its energy efficiency and environmental stewardship by creating a district that generates more energy than it consumes. The initiator was motivated by the need to address climate change, reduce greenhouse gas emissions, and promote renewable energy sources. Additionally, the campus's existing commitment to sustainability and the success of its LEED-certified buildings provided a strong foundation for demonstrating the feasibility and benefits of PED development, serving as a model for sustainable urban living and energy self-sufficiency. | |||
B1P003: Environment of the case study area | ||||||||
B2P003: Environment of the case study area | Urban area | Suburban area | Urban area | Urban area | Urban area | Urban area | Suburban area | |
B1P004: Type of district | ||||||||
B2P004: Type of district |
|
|
|
|
|
|
| |
B1P005: Case Study Context | ||||||||
B1P005: Case Study Context |
|
|
|
|
|
|
| |
B1P006: Year of construction | ||||||||
B1P006: Year of construction | 1976 | 2024 | ||||||
B1P007: District population before intervention - Residential | ||||||||
B1P007: District population before intervention - Residential | 4500 | |||||||
B1P008: District population after intervention - Residential | ||||||||
B1P008: District population after intervention - Residential | ||||||||
B1P009: District population before intervention - Non-residential | ||||||||
B1P009: District population before intervention - Non-residential | 9800 | |||||||
B1P010: District population after intervention - Non-residential | ||||||||
B1P010: District population after intervention - Non-residential | 9800 | |||||||
B1P011: Population density before intervention | ||||||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 34 |
B1P012: Population density after intervention | ||||||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 34.337771548704 |
B1P013: Building and Land Use before intervention | ||||||||
B1P013: Residential | no | no | no | yes | no | no | yes | no |
B1P013 - Residential: Specify the sqm [m²] | ||||||||
B1P013: Office | no | no | no | no | no | no | yes | no |
B1P013 - Office: Specify the sqm [m²] | ||||||||
B1P013: Industry and Utility | no | no | no | no | yes | no | no | no |
B1P013 - Industry and Utility: Specify the sqm [m²] | ||||||||
B1P013: Commercial | no | no | no | yes | no | no | no | no |
B1P013 - Commercial: Specify the sqm [m²] | ||||||||
B1P013: Institutional | no | yes | no | no | no | no | no | yes |
B1P013 - Institutional: Specify the sqm [m²] | 285.400 | |||||||
B1P013: Natural areas | no | no | yes | yes | no | no | no | no |
B1P013 - Natural areas: Specify the sqm [m²] | ||||||||
B1P013: Recreational | no | no | no | yes | no | no | yes | no |
B1P013 - Recreational: Specify the sqm [m²] | ||||||||
B1P013: Dismissed areas | no | no | no | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm [m²] | ||||||||
B1P013: Other | no | no | no | no | no | no | no | no |
B1P013 - Other: Specify the sqm [m²] | ||||||||
B1P014: Building and Land Use after intervention | ||||||||
B1P014: Residential | no | no | no | yes | yes | no | yes | no |
B1P014 - Residential: Specify the sqm [m²] | ||||||||
B1P014: Office | no | no | no | no | yes | no | yes | no |
B1P014 - Office: Specify the sqm [m²] | ||||||||
B1P014: Industry and Utility | no | no | no | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm [m²] | ||||||||
B1P014: Commercial | no | no | no | yes | yes | no | no | no |
B1P014 - Commercial: Specify the sqm [m²] | ||||||||
B1P014: Institutional | no | yes | no | no | no | no | no | yes |
B1P014 - Institutional: Specify the sqm [m²] | 280000 | |||||||
B1P014: Natural areas | no | no | no | yes | no | no | no | no |
B1P014 - Natural areas: Specify the sqm [m²] | ||||||||
B1P014: Recreational | no | no | no | yes | yes | no | yes | no |
B1P014 - Recreational: Specify the sqm [m²] | ||||||||
B1P014: Dismissed areas | no | no | no | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm [m²] | ||||||||
B1P014: Other | no | no | no | no | no | no | no | no |
B1P014 - Other: Specify the sqm [m²] | ||||||||
B2P001: PED Lab concept definition | ||||||||
B2P001: PED Lab concept definition | Groningen was selected as Lighthouse City for the MAKING-CITY project. MAKING-CITY is a 60-month Horizon 2020 project launched in December 2018. It aims to address and demonstrate the urban energy system transformation towards smart and low-carbon cities, based on the Positive Energy District (PED) concept. The PED operational models developed in MAKING-CITY will help European and other cities around the world to adopt a long-term City Vision 2050 for energy transition and sustainable urbanisation whilst turning citizens into actors of this transformation. Groningen works with two PED districts in two completely different neighbourhoods in terms of structure and buildings. This is why we see this as a lab: to see wat works and what doesn’t. In order to be able to implement this in the rest of the city. | |||||||
B2P002: Installation life time | ||||||||
B2P002: Installation life time | The MAKING-CITY project lasts from November 2018 – November 2023. By that time PED North and PED South East are a fact. | |||||||
B2P003: Scale of action | ||||||||
B2P003: Scale | District | District | District | |||||
B2P004: Operator of the installation | ||||||||
B2P004: Operator of the installation | The Municipality of Groningen is Manager of the lab but works closely with other parties such as the university, university of applied sciences, research institute TNO and several other parties. | |||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | ||||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | Groningen does not have a strategy to reuse and recyle materials | |||||||
B2P006: Circular Economy Approach | ||||||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | No | No | ||||||
B2P006: Other | ||||||||
B2P007: Motivation for developing the PED Lab | ||||||||
B2P007: Motivation for developing the PED Lab |
|
| ||||||
B2P007: Other | ||||||||
B2P008: Lead partner that manages the PED Lab | ||||||||
B2P008: Lead partner that manages the PED Lab | Municipality | Municipality | ||||||
B2P008: Other | ||||||||
B2P009: Collaborative partners that participate in the PED Lab | ||||||||
B2P009: Collaborative partners that participate in the PED Lab |
|
| ||||||
B2P009: Other | research companies, monitoring company, ict company | |||||||
B2P010: Synergies between the fields of activities | ||||||||
B2P010: Synergies between the fields of activities | ||||||||
B2P011: Available facilities to test urban configurations in PED Lab | ||||||||
B2P011: Available facilities to test urban configurations in PED Lab |
|
|
| |||||
B2P011: Other | ||||||||
B2P012: Incubation capacities of PED Lab | ||||||||
B2P012: Incubation capacities of PED Lab |
|
|
| |||||
B2P013: Availability of the facilities for external people | ||||||||
B2P013: Availability of the facilities for external people | ||||||||
B2P014: Monitoring measures | ||||||||
B2P014: Monitoring measures |
|
| ||||||
B2P015: Key Performance indicators | ||||||||
B2P015: Key Performance indicators |
|
|
| |||||
B2P016: Execution of operations | ||||||||
B2P016: Execution of operations | ||||||||
B2P017: Capacities | ||||||||
B2P017: Capacities | ||||||||
B2P018: Relations with stakeholders | ||||||||
B2P018: Relations with stakeholders | ||||||||
B2P019: Available tools | ||||||||
B2P019: Available tools |
|
| ||||||
B2P019: Available tools | ||||||||
B2P020: External accessibility | ||||||||
B2P020: External accessibility | ||||||||
C1P001: Unlocking Factors | ||||||||
C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 4 - Important | 4 - Important | 4 - Important | 5 - Very important |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 3 - Moderately important | 4 - Important | 1 - Unimportant | 4 - Important | 5 - Very important | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P001: Energy Communities, P2P, Prosumers concepts | 4 - Important | 5 - Very important | 5 - Very important | 3 - Moderately important | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P001: Storage systems and E-mobility market penetration | 4 - Important | 3 - Moderately important | 5 - Very important | 2 - Slightly important | 3 - Moderately important | 4 - Important | 3 - Moderately important | 4 - Important |
C1P001: Decreasing costs of innovative materials | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 5 - Very important | 3 - Moderately important | 3 - Moderately important | 4 - Important | 3 - Moderately important | 4 - Important | 4 - Important | 5 - Very important |
C1P001: The ability to predict Multiple Benefits | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 2 - Slightly important | 4 - Important |
C1P001: The ability to predict the distribution of benefits and impacts | 3 - Moderately important | 3 - Moderately important | 4 - Important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 5 - Very important | 3 - Moderately important | 4 - Important | 4 - Important | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P001: Social acceptance (top-down) | 3 - Moderately important | 3 - Moderately important | 4 - Important | 4 - Important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 4 - Important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 4 - Important | 2 - Slightly important | 4 - Important | 3 - Moderately important | 2 - Slightly important | 4 - Important | 2 - Slightly important | 5 - Very important |
C1P001: Presence of integrated urban strategies and plans | 3 - Moderately important | 5 - Very important | 5 - Very important | 5 - Very important | 3 - Moderately important | 5 - Very important | 4 - Important | 4 - Important |
C1P001: Multidisciplinary approaches available for systemic integration | 2 - Slightly important | 2 - Slightly important | 4 - Important | 4 - Important | 4 - Important | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 5 - Very important | 4 - Important | 4 - Important | 5 - Very important | 4 - Important |
C1P001: Availability of RES on site (Local RES) | 4 - Important | 4 - Important | 5 - Very important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 4 - Important | 2 - Slightly important | 4 - Important | 4 - Important | 4 - Important |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P001: Any other UNLOCKING FACTORS (if any) | Collaboration with the local partners | |||||||
C1P002: Driving Factors | ||||||||
C1P002: Climate Change adaptation need | 2 - Slightly important | 5 - Very important | 3 - Moderately important | 5 - Very important | 5 - Very important | 5 - Very important | 3 - Moderately important | 5 - Very important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 5 - Very important | 5 - Very important | 4 - Important | 4 - Important | 5 - Very important |
C1P002: Rapid urbanization trend and need of urban expansions | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P002: Urban re-development of existing built environment | 4 - Important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P002: Economic growth need | 2 - Slightly important | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important | 4 - Important | 4 - Important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 4 - Important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P002: Territorial and market attractiveness | 2 - Slightly important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P002: Energy autonomy/independence | 2 - Slightly important | 5 - Very important | 2 - Slightly important | 4 - Important | 2 - Slightly important | 3 - Moderately important | 4 - Important | 5 - Very important |
C1P002: Any other DRIVING FACTOR | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P002: Any other DRIVING FACTOR (if any) | Earthquakes due to gas extraction | |||||||
C1P003: Administrative barriers | ||||||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 5 - Very important | 4 - Important | 5 - Very important |
C1P003: Lack of good cooperation and acceptance among partners | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 5 - Very important |
C1P003: Lack of public participation | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 4 - Important | 4 - Important |
C1P003: Lack of institutions/mechanisms to disseminate information | 2 - Slightly important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P003:Long and complex procedures for authorization of project activities | 4 - Important | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important | 4 - Important | 5 - Very important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P003: Complicated and non-comprehensive public procurement | 3 - Moderately important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P003: Fragmented and or complex ownership structure | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important | 5 - Very important | 5 - Very important |
C1P003: Lack of internal capacities to support energy transition | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P003: Any other Administrative BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P003: Any other Administrative BARRIER (if any) | Fragmented financial support; lack of experimental budget for complex projects, etc. | |||||||
C1P004: Policy barriers | ||||||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 5 - Very important |
C1P004: Lacking or fragmented local political commitment and support on the long term | 1 - Unimportant | 4 - Important | 4 - Important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 5 - Very important |
C1P004: Lack of Cooperation & support between national-regional-local entities | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P004: Any other Political BARRIER (if any) | Different priorities; overall problematic system od decentralization powers; non-fuctioning model of local development funding, etc. | |||||||
C1P005: Legal and Regulatory barriers | ||||||||
C1P005: Inadequate regulations for new technologies | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 5 - Very important |
C1P005: Regulatory instability | 3 - Moderately important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P005: Non-effective regulations | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 4 - Important | 4 - Important |
C1P005: Unfavorable local regulations for innovative technologies | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 5 - Very important | 4 - Important | 4 - Important |
C1P005: Building code and land-use planning hindering innovative technologies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 4 - Important | 4 - Important |
C1P005: Insufficient or insecure financial incentives | 3 - Moderately important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 5 - Very important | 5 - Very important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P005: Shortage of proven and tested solutions and examples | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P005: Any other Legal and Regulatory BARRIER (if any) | ||||||||
C1P006: Environmental barriers | ||||||||
C1P006: Environmental barriers | Air Quality Management Importance Level: 5 (Very Important) Energy Efficiency Importance Level: 5 (Very Important) Water Conservation Importance Level: 5 (Very Important) Waste Management Importance Level: 4 (Important) Material Selection Importance Level: 4 (Important) Renewable Energy Integration Importance Level: 5 (Very Important) Heat Island Effect Mitigation Importance Level: 4 (Important) Noise Pollution Control Importance Level: 3 (Moderately Important) | |||||||
C1P007: Technical barriers | ||||||||
C1P007: Lack of skilled and trained personnel | 4 - Important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P007: Deficient planning | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P007: Retrofitting work in dwellings in occupied state | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 5 - Very important | 4 - Important | 3 - Moderately important |
C1P007: Lack of well-defined process | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P007: Inaccuracy in energy modelling and simulation | 4 - Important | 2 - Slightly important | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P007: Lack/cost of computational scalability | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important |
C1P007: Grid congestion, grid instability | 4 - Important | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 5 - Very important | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important |
C1P007: Difficult definition of system boundaries | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 4 - Important |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important |
C1P007: Any other Thecnical BARRIER (if any) | Inadequate regulation towards energy transition | |||||||
C1P008: Social and Cultural barriers | ||||||||
C1P008: Inertia | 2 - Slightly important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P008: Lack of values and interest in energy optimization measurements | 3 - Moderately important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P008: Low acceptance of new projects and technologies | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 2 - Slightly important | 5 - Very important | 5 - Very important |
C1P008: Difficulty of finding and engaging relevant actors | 2 - Slightly important | 3 - Moderately important | 4 - Important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important |
C1P008: Lack of trust beyond social network | 4 - Important | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P008: Rebound effect | 2 - Slightly important | 2 - Slightly important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important |
C1P008: Hostile or passive attitude towards environmentalism | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P008: Exclusion of socially disadvantaged groups | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P008: Non-energy issues are more important and urgent for actors | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P008: Hostile or passive attitude towards energy collaboration | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important |
C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P008: Any other Social BARRIER (if any) | ||||||||
C1P009: Information and Awareness barriers | ||||||||
C1P009: Insufficient information on the part of potential users and consumers | 3 - Moderately important | 3 - Moderately important | 5 - Very important | 3 - Moderately important | 4 - Important | 4 - Important | 3 - Moderately important | 5 - Very important |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P009: Lack of awareness among authorities | 2 - Slightly important | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P009: Information asymmetry causing power asymmetry of established actors | 3 - Moderately important | 3 - Moderately important | 2 - Slightly important | 3 - Moderately important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 4 - Important |
C1P009: High costs of design, material, construction, and installation | 4 - Important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 4 - Important | 5 - Very important | 4 - Important |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P009: Any other Information and Awareness BARRIER (if any) | ||||||||
C1P010: Financial barriers | ||||||||
C1P010: Hidden costs | 2 - Slightly important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 4 - Important |
C1P010: Insufficient external financial support and funding for project activities | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 5 - Very important |
C1P010: Economic crisis | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 4 - Important |
C1P010: Risk and uncertainty | 3 - Moderately important | 2 - Slightly important | 2 - Slightly important | 4 - Important | 4 - Important | 2 - Slightly important | 4 - Important | 5 - Very important |
C1P010: Lack of consolidated and tested business models | 3 - Moderately important | 4 - Important | 4 - Important | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 4 - Important |
C1P010: Limited access to capital and cost disincentives | 2 - Slightly important | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P010: Any other Financial BARRIER (if any) | ||||||||
C1P011: Market barriers | ||||||||
C1P011: Split incentives | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P011: Energy price distortion | 4 - Important | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 4 - Important | 3 - Moderately important | 1 - Unimportant | 4 - Important | 3 - Moderately important | 2 - Slightly important | 5 - Very important | 4 - Important |
C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P011: Any other Market BARRIER (if any) | ||||||||
C1P012: Stakeholders involved | ||||||||
C1P012: Government/Public Authorities |
|
|
|
|
|
|
| |
C1P012: Research & Innovation |
|
|
|
|
| |||
C1P012: Financial/Funding |
|
|
| |||||
C1P012: Analyst, ICT and Big Data |
|
|
|
|
| |||
C1P012: Business process management |
|
|
|
| ||||
C1P012: Urban Services providers |
|
|
|
|
| |||
C1P012: Real Estate developers |
|
|
|
|
| |||
C1P012: Design/Construction companies |
|
|
|
| ||||
C1P012: End‐users/Occupants/Energy Citizens |
|
|
|
|
|
| ||
C1P012: Social/Civil Society/NGOs |
|
|
|
| ||||
C1P012: Industry/SME/eCommerce |
|
|
|
|
| |||
C1P012: Other |
| |||||||
C1P012: Other (if any) | ||||||||
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)