Name | Project | Type | Compare |
---|---|---|---|
Örebro-Vivalla | JUST PEPP | PED Relevant Case Study | Compare |
Tiurberget, Kongsvinger | JUST PEPP | PED Relevant Case Study | Compare |
Texel | JUST PEPP | PED Relevant Case Study | Compare |
Hällefors, Sweden | JUST PEPP | PED Relevant Case Study | Compare |
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona | OPEN4CEC | PED Lab | Compare |
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab | OPEN4CEC | PED Lab | Compare |
Pamplona | OPEN4CEC | PED Lab | Compare |
Trondheim, Svartlamon | OPEN4CEC | PED Lab | Compare |
Savona, The University of Genova, Savona Campus | OPEN4CEC | PED Lab | Compare |
Torres Vedras, Encosta de São Vicente | COPPER | PED Lab | Compare |
Title | Groningen, PED North | Oslo, Verksbyen | Sharing Cities, Milano | Riga, Ķīpsala, RTU smart student city | Espoo, Leppävaara district, Sello center | Vienna, 16. District, Leben am Wilhelminenberg |
---|---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | ||||||
A1P001: Name of the PED case study / PED Lab | Groningen, PED North | Oslo, Verksbyen | Sharing Cities, Milano | Riga, Ķīpsala, RTU smart student city | Espoo, Leppävaara district, Sello center | Vienna, 16. District, Leben am Wilhelminenberg |
A1P002: Map / aerial view / photos / graphic details / leaflet | ||||||
A1P002: Map / aerial view / photos / graphic details / leaflet | ||||||
A1P003: Categorisation of the PED site | ||||||
PED case study ?District-level project with a high level of aspiration in terms of energy efficiency, energy flexibility, and energy production. The project has to address most of the aspects listed in the JPI UE PED Framework Definition, including the ambition to achieve annual energy positive balance "Positive Energy Districts are energy-efficient and energy-flexible urban areas or groups of connected buildings that produce net zero greenhouse gas emissions and actively manage an annual local or regional surplus production of renewable energy. They require integration of different systems and infrastructures and interaction between buildings, the users and the regional energy, mobility and ICT systems while securing the energy supply and a good life for all in line with social, economic and environmental sustainability." | no | yes | no | yes | yes | no |
PED relevant case study ?District-level project with a high level of aspiration in terms of energy efficiency, energy flexibility, and energy production. The project does not necessarily have to meet annual energy positive balance, but it has to address some aspects listed in the JPI UE PED Framework Definition (“Positive Energy Districts are energy-efficient and energy-flexible urban areas or groups of connected buildings that produce net zero greenhouse gas emissions and actively manage an annual local or regional surplus production of renewable energy. They require integration of different systems and infrastructures and interaction between buildings, the users, and the regional energy, mobility, and ICT systems while securing the energy supply and a good life for all in line with social, economic, and environmental sustainability." | no | no | yes | no | no | yes |
PED Lab. ?PED-Lab definition regarding the Strategic Energy Technology Plan (SET-Plan Action 3.2): PED Labs will be pilot actions that provide opportunities to experiment with the planning and deployment of PEDs, as well as provide seeding ground for new ideas, solutions, and services to develop. PED Labs will follow an integrative approach, including technology, spatial, regulatory, financial, legal, social, and economic perspectives. | yes | no | no | no | no | no |
A1P004: Targets of the PED case study / PED Lab | ||||||
Climate neutrality ?Climate neutrality means that, on a periodic basis, the carbon dioxide emissions within the limits of the district are compensated with the exported energy or by carbon capture. | yes | yes | yes | yes | yes | yes |
Annual energy surplus ?The total annual energy balance is positive; therefore, the area will deliver, on average, an energy surplus to be shared with other urban or peri-urban zones. | yes | yes | no | no | no | no |
Energy community ?The energy community refers to a wide range of collective energy actions that involve citizens’ participation in the energy system. Energy communities can be understood as a way to ‘organize’ collective energy actions around open, democratic participation and governance and the provision of benefits for the members or the local community | yes | no | no | yes | no | yes |
Circularity ?circular systems employ reuse, sharing, repair, refurbishment, remanufacturing and recycling to create a closed‐loop system, minimizing the use of resource inputs and the creation of waste, pollution and carbon emissions. In the case of PED, the revalorization of waste (such as residues from the different sectors) for the energy production is prioritized, but many other pathways could be taken, considering the cycle of water, food, etc | yes | no | no | no | no | no |
Air quality and urban comfort ?The objective of improving air quality is to reduce the concentration of the five main pollutants: O3, NO2, SO2, PM2.5 and PM10 | no | yes | no | no | no | no |
Electrification ?electrification is the process in which the supply of any energy needs of a district and/or city, such as the heating needs or the mobility sector,
are supplied by electricity-driven technologies | no | no | no | no | no | no |
Net-zero energy cost ?the amount of money the utility pays the building owner for the energy the building exports to the grid is at least equal to the amount the owner pays the utility for the energy services and energy used over the year | no | no | no | no | no | no |
Net-zero emission ?a net-zero-emissions building produces at least as much emissions-free renewable energy as it uses from emissions-producing energy sources | yes | yes | no | no | no | no |
Self-sufficiency (energy autonomous) ?self‐sufficiency means that within a year, the district will never import energy from outside the boundaries (e.g. consume electricity or gas from the grids) | no | no | no | yes | no | no |
Maximise self-sufficiency ?Maximizing self‐sufficiency means that within a year, the district is allowed to import energy from outside the boundaries; however, the energy content of the imported energy products to the district should be less than (or equal to) the energy content of the energy products exported from the district. Thus, the net imports is zero or negative | no | no | no | yes | yes | no |
Other | no | no | yes | no | no | no |
Other (A1P004) | (not specified) | (not specified) | Energy efficient; Sustainable neighbourhood; Social aspects/affordability | (not specified) | (not specified) | (not specified) |
A1P005: Phase of the PED case study / PED Lab | ||||||
A1P005: Project Phase of your case study/PED Lab ?Planning stage: Case Study or Lab is being designed
Implementation stage: Case Study or LAB is being deployed
Completed: Case Study or LAB is already finalized
In operation. Case Study or LAB is being used | Implementation Phase | Implementation Phase | Completed | Planning Phase | Implementation Phase | Planning Phase |
A1P006: Start Date | ||||||
A1P006: Start date | 12/18 | 07/18 | 01/16 | 01/24 | 09/19 | 03/24 |
A1P007: End Date | ||||||
A1P007: End date | 12/23 | 08/24 | 12/20 | 12/26 | 10/22 | 12/27 |
A1P008: Reference Project | ||||||
A1P008: Reference Project | (not specified) | |||||
A1P009: Data availability | ||||||
A1P009: Data availability |
| (not specified) | (not specified) |
|
| (not specified) |
A1P009: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P010: Sources ?Any publication, link to website, deliverable referring to the PED/PED Lab | ||||||
Any publication, link to website, deliverable referring to the PED/PED Lab |
|
| ||||
A1P011: Geographic coordinates ?Geographic coordinate system: latitude and longitude | ||||||
X Coordinate (longitude): | 6.535121 | 10.986173354432992 | 9.202527 | 24.08168339 | 24.8101 | 16.303112 |
Y Coordinate (latitude): | 53.234846 | 59.22429716642046 | 45.452203 | 56.95245956 | 60.2179 | 48.218501 |
A1P012: Country | ||||||
A1P012: Country | Netherlands | Norway | Italy | Latvia | Finland | Austria |
A1P013: City | ||||||
A1P013: City | Groningen | Fredrikstad | Milano | Riga | Espoo | Vienna |
A1P014: Climate Zone (Köppen Geiger classification) | ||||||
A1P014: Climate Zone (Köppen Geiger classification). ?The most widely used climate classification system. It divides climates into five main climate groups based on seasonal precipitation and temperature patterns.
Af: Tropical‐Rainforest
Am: Tropical‐Monsoon
Aw: Tropical‐Savanna
BSh: Arid‐Steppe‐Hot
BSk: Arid‐Steppe‐Cold
BWh: Arid‐Desert‐Hot
BWk: Arid‐Desert‐Cold
Cfa: Temperate‐Without_dry_season‐Hot _ Summer
Cfb: Temperate‐Without_dry_season‐
Warm_Summer
Cfc: Temperate‐Without_dry_season‐Cold_Summer
Csa: Temperate‐Dry_Summer‐Hot_Summer
Csb: Temperate‐Dry_Summer‐Warm_Summer
Cwa: Temperate‐Dry_Winter‐Hot_Summer
Cwb: Temperate‐Dry_Winter‐Warm_Summer
Dfa: Cold‐Without_dry_season‐Very_Cold_Winter
Dfb: Cold‐Without_dry_season‐Warm_Summer
Dfc: Cold‐Without_dry_season‐Cold_Summer
Dsa: Cold‐Dry_Summer‐Hot_Summer
Dsb: Cold‐Dry_Summer‐Warm_Summer
Dsc: Cold‐Dry_Summer‐Cold_Summer
Dsd: Cold‐Dry_Summer‐Very_Cold_Winter
Dwa: Cold‐Dry_Winter‐Hot_Summer
Dwb: Cold‐Dry_Winter‐Warm_Summer
Dwc: Cold‐Dry_Winter‐Cold_Summer
Dwd: Cold‐Dry_Winter‐Very_Cold_Winter
EF: Polar‐Frost
ET: Polar‐Tundra | Cfa | Cfb | Cfa | Cfb | Dfb | Cfb |
A1P015: District boundary | ||||||
A1P015: District boundary ?See individual answer options’ definitions below:
Functional: buildings are not close to each other, but they are interconnected, thanks to a gas, electric, or heating network.
Geographic: the boundaries are delimited by spatial-physical limits, including delineated buildings, sites, and infrastructure.
Off-Grid: The district is self-sufficient or autonomous, which means it is not connected to any utility grids (e.g., electricity, water, gas, and sewer networks). This is advantageous in isolated locations where normal utilities cannot reach them and is attractive to those who want to reduce environmental impact and the cost of living.
Virtual: If energy demand is covered by a generation unit (e.g., a wind turbine), which is typically shared with other consumption points and located outside the geographical boundaries of the district, then it could be considered a virtual boundary
Other ‐ specify: N/A | Functional | Geographic | (not specified) | Geographic | Geographic | Virtual |
Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P016: Ownership of the case study/PED Lab | ||||||
A1P016: Ownership of the case study/PED Lab: ?Public: Ownership of an industry, asset, or enterprise by the state or a public body representing a community as opposed to an individual or private party. Private: The fact of being owned by a private individual or organization. Mixed: Ownership of the assets within the PED by both public and private entities. | Mixed | Private | Private | Public | (not specified) | Private |
A1P017: Ownership of the land / physical infrastructure | ||||||
A1P017: Ownership of the land / physical infrastructure: | Multiple Owners | Single Owner | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners |
A1P018: Number of buildings in PED | ||||||
A1P018: Number of buildings in PED | 7 | 2 | (not specified) | 15 | 5 | (not specified) |
A1P019: Conditioned space ?Closed building area, where there is intentional
control of the space thermal conditions within defined limits by using natural, electrical, or mechanical means | ||||||
A1P019: Conditioned space | 1.01 m² | 3550 m² | (not specified) | 170000 m² | 267956 m² | (not specified) |
A1P020: Total ground area ?The ground space (in m2) including green areas and streets within the defined physical boundaries. | ||||||
A1P020: Total ground area | 17.132 m² | (not specified) | 28.000 m² | 119264 m² | 53000 m² | (not specified) |
A1P021: Floor area ratio: Conditioned space / total ground area | ||||||
A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 0 | 0 | 1 | 5 | 0 |
A1P022: Financial schemes | ||||||
A1P022a: Financing - PRIVATE - Real estate | yes | yes | no | no | no | yes |
A1P022a: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no | no |
A1P022b: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022c: Financing - PRIVATE - Other | yes | no | no | no | no | no |
A1P022c: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022d: Financing - PUBLIC - EU structural funding | no | no | yes | no | no | no |
A1P022d: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022e: Financing - PUBLIC - National funding | yes | no | no | no | no | no |
A1P022e: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022f: Financing - PUBLIC - Regional funding | no | no | no | no | no | no |
A1P022f: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022g: Financing - PUBLIC - Municipal funding | yes | no | yes | no | no | no |
A1P022g: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022h: Financing - PUBLIC - Other | no | no | no | no | no | no |
A1P022h: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022i: Financing - RESEARCH FUNDING - EU | yes | no | no | yes | yes | no |
A1P022i: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | 7500000 EUR | 629000 EUR | (not specified) |
A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | no | no | no |
A1P022j: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no | no |
A1P022k: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no | no |
A1P022l: Add the value in EUR if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P022: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P023: Economic Targets | ||||||
A1P023: Economic Targets |
| (not specified) | (not specified) |
|
| (not specified) |
A1P023: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P024: More comments: | ||||||
A1P024: More comments: | (not specified) | The total development consists of more than 1500 dwellings, a kindergarten, a school, and commercial buildings. Two of the residential blocks are included as demonstration projects in syn.ikia. The two blocks have 20 dwellings in each and are 6 stories high. | (not specified) | (not specified) | (not specified) | (not specified) |
A1P025: Estimated PED case study / PED LAB costs | ||||||
A1P025: Estimated PED case study / PED LAB costs | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
Contact person for general enquiries | ||||||
A1P026: Name ?Name of the person who filled out the form | Jasper Tonen, Elisabeth Koops | Tonje Healey Trulsrud | Christoph Gollner | Judith Stiekema | Jaano Juhmen | Rachel Leutgöb (e7) |
A1P027: Organization ?Organization of the person who filled out the form (e.g., Municipality of, University of…) | Municipality of Groningen | Norwegian University of Science and technology (NTNU) | FFG | OASC | SIEMENS - Data Center Forum | e7 GmbH |
A1P028: Affiliation ?Affiliation of the person who filled out the form | Municipality / Public Bodies | Research Center / University | Other | Other | SME / Industry | Research Center / University |
A1P028: Other | (not specified) | (not specified) | (not specified) | not for profit private organisation | (not specified) | (not specified) |
A1P029: Email ?Contact e-mail of the person who filled out the form | Jasper.tonen@groningen.nl | tonje.h.trulsrud@ntnu.no | christoph.gollner@ffg.at | judith@oascities.org | Jaano.juhmen@siemens.com | rachel.leutgoeb@e-sieben.at |
Contact person for other special topics | ||||||
A1P030: Name ?Name of the project manager of the site | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A1P031: Email ?Contact e-mail of the project manager of the site | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes | Yes |
A2P001: Fields of application | ||||||
A2P001: Fields of application ?Energy efficiency simply means using less energy to perform the same task – that is, eliminating energy waste Energy flexibility In the electricity system, flexibility helps to maintain or restore the stability of a system, because only by reacting flexibly to constantly changing conditions - fluctuating electricity consumption, fluctuating electricity generation – the system is balanced. Energy production In terms of Renewable Energy production. E-mobility refers to clean and efficient transport, using electric vehicles, powered either by batteries or by hydrogen fuel cells. Digital technologies are set to make energy systems around the world more connected, intelligent, efficient, reliable and sustainable. Stunning advances in data, analytics and connectivity are enabling a range of new digital applications such as smart appliances, shared mobility, and 3D printing. Digitalized energy systems in the future may be able to identify who needs energy and deliver it at the right time, in the right place and at the lowest cost Water use refers to water actually used by end users (e.g. households, services, agriculture, industry) within a territory for a specific purpose such as domestic use, irrigation or industrial processing. Waste Management The new agenda for waste management thus focuses upon the development of more appropriate, sustainable definitions so that what is now commonly perceived as being waste will in fact be increasingly seen as resource-rich, |
|
|
|
| (not specified) |
|
A2P001: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P002: Tools/strategies/methods applied for each of the above-selected fields | ||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | Energy efficiency: - buildings energy retrofit supported by tax bonuses - replacing heat supply technologies Energy production: - installation of new (PV) systems for renewable on-site energy production; - presence of a large PV plant in the South East (2 solar parks: 12MW and 107MW) and North area (0,4 MW) Energy flexibility: - energy storage solutions, battery storage and possible hydrogen production - GRID balancing services E-mobility - Installation of new charging stations for electric vehicles; Urban Management - make use of the organizational structure Waste Management - circular use of municipal waste streams | Energy efficiency: energy-efficient buildings that comply with the Norwegian Passive House standard. Energy Flexibility: sharing of PV energy between the dwellings Energy production: BIPV on the roof and facades, and a ground source heat pump for thermal energy. E-mobility: EV charging Urban comfort: a large green park in the neighbourhood with a small lake and recreational areas Digital technologies: Smart Home Systems for lighting, heating and ventilation Indoor air quality: balanced ventilation | (not specified) | A suite of replicable modeling tools will enable stakeholders to analyze planning actions towards positive energy in a cost-effective fashion, aiding their evidence based decision-making process. The tools will be able to model the district’s energy production and demand, optimize for flexibility and simulate mobility and transport. By employing gamification and co-creation approaches, the project will enhance public awareness and engagement in energy efficiency. The project will culminate in the publication of practical guidelines, reusable models, algorithms, and training materials to aid other cities to replicate the digital twin for their districts, fostering widespread adoption of sustainable energy practices. | (not specified) | (not specified) |
A2P003: Application of ISO52000 | ||||||
A2P003: Application of ISO52000 | No | Yes | (not specified) | No | (not specified) | (not specified) |
A2P004: Appliances included in the calculation of the energy balance | ||||||
A2P004: Appliances included in the calculation of the energy balance | No | No | (not specified) | Yes | (not specified) | (not specified) |
A2P005: Mobility included in the calculation of the energy balance | ||||||
A2P005: Mobility included in the calculation of the energy balance | No | No | (not specified) | Yes | (not specified) | (not specified) |
A2P006: Description of how mobility is included (or not included) in the calculation | ||||||
A2P006: Description of how mobility is included (or not included) in the calculation | Mobility, till now, is not included in the energy model. | (not specified) | (not specified) | The university operates a fleet of 13 electric vehicles (EV) (61kW power each). There are 5 EV charging stations on campus. | (not specified) | (not specified) |
A2P007: Annual energy demand in buildings / Thermal demand | ||||||
A2P007: Annual energy demand in buildings / Thermal demand | 2.3 GWh/annum | 0.16 GWh/annum | (not specified) | 8000 GWh/annum | (not specified) | 1 GWh/annum |
A2P008: Annual energy demand in buildings / Electric Demand | ||||||
A2P008: Annual energy demand in buildings / Electric Demand | 0.33 GWh/annum | 0.053 GWh/annum | (not specified) | 5000 GWh/annum | (not specified) | (not specified) |
A2P009: Annual energy demand for e-mobility | ||||||
A2P009: Annual energy demand for e-mobility | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P010: Annual energy demand for urban infrastructure | ||||||
A2P010: Annual energy demand for urban infrastructure | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Annual renewable electricity production on-site during target year | ||||||
A2P011: PV | no | yes | no | no | no | no |
A2P011: PV - specify production in GWh/annum | (not specified) | 0.18 GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Wind | no | no | no | yes | no | no |
A2P011: Wind - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Hydro | no | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Biomass_el | no | no | no | no | no | no |
A2P011: Biomass_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Biomass_peat_el | no | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: PVT_el | no | no | no | yes | no | no |
A2P011: PVT_el - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P011: Other | no | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Annual renewable thermal production on-site during target year | ||||||
A2P012: Geothermal | yes | no | no | no | no | no |
A2P012 - Geothermal: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Solar Thermal | yes | no | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_heat | yes | no | no | yes | no | no |
A2P012 - Biomass_heat: Please specify production in GWh/annum | 0.1 GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Waste heat+HP | yes | no | no | no | no | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_peat_heat | no | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: PVT_th | yes | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Biomass_firewood_th | no | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P012: Other | no | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P013: Renewable resources on-site - Additional notes | ||||||
A2P013: Renewable resources on-site - Additional notes | Geothermal heatpump systems, Waste heat from data centers | (not specified) | (not specified) | Conventional power generation: The university’s heat supply is designed as a local centralized heat supply system. Electrical power, generated in combined heat and power (CHP) units, is delivered to the distribution network and sold to energy traders as regulated by local legislation and norms. There are two natural gas burners acting as heat sources (3MW and 6MW capacity), and two CHP units (1.6MW and 0.45MW thermal capacity). All heating is supplied from the CHP plants. Renewable Energy Sources (RES): a wind turbine (3.6 kW) and PV panels (11.7 kW) are connected to the faculty microgrid. In the future it is planned to power the campus entirely from local RES. | (not specified) | (not specified) |
A2P014: Annual energy use | ||||||
A2P014: Annual energy use | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P015: Annual energy delivered | ||||||
A2P015: Annual energy delivered | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P016: Annual non-renewable electricity production on-site during target year | ||||||
A2P016: Annual non-renewable electricity production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Annual non-renewable thermal production on-site during target year | ||||||
A2P017: Gas | no | no | no | yes | no | no |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Coal | no | no | no | no | no | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Oil | no | no | no | no | no | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P017: Other | no | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Annual renewable electricity imports from outside the boundary during target year | ||||||
A2P018: PV | no | no | no | no | no | no |
A2P018 - PV: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Wind | no | no | no | no | no | no |
A2P018 - Wind: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Hydro | no | no | no | no | no | no |
A2P018 - Hydro: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Biomass_el | no | no | no | no | no | no |
A2P018 - Biomass_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Biomass_peat_el | no | no | no | no | no | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: PVT_el | no | no | no | no | no | no |
A2P018 - PVT_el: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P018: Other | no | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Annual renewable thermal imports from outside the boundary during target year | ||||||
A2P019: Geothermal | no | no | no | no | no | no |
A2P019 Geothermal: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Solar Thermal | no | no | no | no | no | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_heat | no | no | no | no | no | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Waste heat+HP | no | no | no | no | no | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_peat_heat | no | no | no | no | no | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: PVT_th | no | no | no | no | no | no |
A2P019 PVT_th: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Biomass_firewood_th | no | no | no | no | no | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P019: Other | no | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P020: Share of RES on-site / RES outside the boundary | ||||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | ||||||
A2P021: GHG-balance calculated for the PED | (not specified) | -6.035 tCO2/annum | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: KPIs related to the PED case study / PED Lab | ||||||
A2P022: Safety & Security | (not specified) | Personal Safety | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Health | (not specified) | Healthy community + Indoor Evironmental Quality (indoor air quality, thermal comfort, lighting and visual comfort) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Education | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Mobility | (not specified) | Sustainable mobility | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Energy | (not specified) | Energy and environmental performance (non-renewable primary energy balance, renewable energy ratio, grid purchase factor, load cover factor/self-generation, supply cover factor/ self-consumption, net energy/net power. peak delivered(peak exported power, connection capacity credit, total greenhouse gas emissions | (not specified) | (not specified) | (not specified) | Yes |
A2P022: Water | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Economic development | (not specified) | Economic Performance: capital costs, operational costs, overall performance | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Housing and Community | (not specified) | demopraphic composiiton, diverse community, social cohesion access to amenities, access to services, afordability of energy, affordability of shousing, living conditions, universal design, energy consciousness | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Waste | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P022: Other | (not specified) | Smartness and Flexibility | (not specified) | (not specified) | (not specified) | (not specified) |
A2P023: Technological Solutions / Innovations - Energy Generation | ||||||
A2P023: Photovoltaics | yes | yes | yes | no | no | yes |
A2P023: Solar thermal collectors | yes | no | yes | no | no | no |
A2P023: Wind Turbines | no | no | no | no | no | no |
A2P023: Geothermal energy system | yes | yes | yes | no | no | yes |
A2P023: Waste heat recovery | yes | no | no | no | no | no |
A2P023: Waste to energy | yes | no | no | no | no | no |
A2P023: Polygeneration | no | no | no | no | no | no |
A2P023: Co-generation | no | no | no | no | no | no |
A2P023: Heat Pump | yes | yes | yes | no | no | yes |
A2P023: Hydrogen | no | no | no | no | no | no |
A2P023: Hydropower plant | no | no | no | no | no | no |
A2P023: Biomass | no | no | no | no | no | no |
A2P023: Biogas | no | no | no | no | no | no |
A2P023: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P024: Technological Solutions / Innovations - Energy Flexibility | ||||||
A2P024: A2P024: Information and Communication Technologies (ICT) | yes | yes | no | yes | no | no |
A2P024: Energy management system | yes | yes | yes | yes | no | no |
A2P024: Demand-side management | yes | yes | no | yes | no | no |
A2P024: Smart electricity grid | no | no | no | yes | no | no |
A2P024: Thermal Storage | yes | no | no | yes | no | yes |
A2P024: Electric Storage | yes | no | no | yes | no | no |
A2P024: District Heating and Cooling | yes | no | yes | yes | no | yes |
A2P024: Smart metering and demand-responsive control systems | yes | yes | no | yes | no | no |
A2P024: P2P – buildings | no | no | no | no | no | no |
A2P024: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P025: Technological Solutions / Innovations - Energy Efficiency | ||||||
A2P025: Deep Retrofitting | no | no | yes | no | no | yes |
A2P025: Energy efficiency measures in historic buildings | yes | no | no | no | no | yes |
A2P025: High-performance new buildings | yes | yes | no | no | no | no |
A2P025: Smart Public infrastructure (e.g. smart lighting) | yes | no | yes | no | no | no |
A2P025: Urban data platforms | yes | no | no | yes | no | no |
A2P025: Mobile applications for citizens | no | no | yes | yes | no | no |
A2P025: Building services (HVAC & Lighting) | no | yes | no | yes | no | no |
A2P025: Smart irrigation | no | no | no | no | no | no |
A2P025: Digital tracking for waste disposal | no | no | no | no | no | no |
A2P025: Smart surveillance | no | no | no | no | no | no |
A2P025: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P026: Technological Solutions / Innovations - Mobility | ||||||
A2P026: Efficiency of vehicles (public and/or private) | no | no | yes | no | no | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | no | no | no | no | no | no |
A2P026: e-Mobility | yes | no | yes | no | no | no |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | yes | no | no | no |
A2P026: Car-free area | no | no | no | no | no | no |
A2P026: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P027: Mobility strategies - Additional notes | ||||||
A2P027: Mobility strategies - Additional notes | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A2P028: Energy efficiency certificates | ||||||
A2P028: Energy efficiency certificates | Yes | Yes | (not specified) | No | (not specified) | (not specified) |
A2P028: If yes, please specify and/or enter notes | Energy Performance Certificate | NS3700 Norwegian Passive House | (not specified) | (not specified) | (not specified) | (not specified) |
A2P029: Any other building / district certificates | ||||||
A2P029: Any other building / district certificates | (not specified) | (not specified) | (not specified) | No | (not specified) | (not specified) |
A2P029: If yes, please specify and/or enter notes | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P001: Relevant city /national strategy | ||||||
A3P001: Relevant city /national strategy |
| (not specified) |
|
| (not specified) | (not specified) |
A3P002: Quantitative targets included in the city / national strategy | ||||||
A3P002: Quantitative targets included in the city / national strategy | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P003: Strategies towards decarbonization of the gas grid | ||||||
A3P003: Strategies towards decarbonization of the gas grid |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P003: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P004: Identification of needs and priorities | ||||||
A3P004: Identification of needs and priorities | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P005: Sustainable behaviour | ||||||
A3P005: Sustainable behaviour | In Groningen we are working with different sustainable behaviours approaches and also developed the Unified Citizen Engagement Approach (UCEA). Currently, there are two different approaches in use in the municipality of Groningen: the District energy approach (Wijkgerichte aanpak, developed by the Municipality of Groningen) and the Cooperative approach (Coöperative Aanpak, developed by Grunneger Power). Based upon those approaches and knowledge that is gained through social research executed by TNO and HUAS the new Unified Citizen Engagement Approach (UCEA) has been developed. | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P006: Economic strategies | ||||||
A3P006: Economic strategies |
| (not specified) | (not specified) |
| (not specified) |
|
A3P006: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P007: Social models | ||||||
A3P007: Social models |
| (not specified) |
|
| (not specified) |
|
A3P007: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P008: Integrated urban strategies | ||||||
A3P008: Integrated urban strategies |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
A3P008: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P009: Environmental strategies | ||||||
A3P009: Environmental strategies |
| (not specified) | (not specified) |
| (not specified) |
|
A3P009: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
A3P010: Legal / Regulatory aspects | ||||||
A3P010: Legal / Regulatory aspects | At national/regional/local level a legislation on PEDs development is not yet available in the Netherlands. There will be a new Environmental Act and Heat Act in the nearby future. We are working on a paper about the current legal barriers, which are in short for Groningen: Lack of legal certainty and clarity with regard to the energy legislation. Lack of coherence between policy and legislation from different ministries. The planned revision of the Dutch Heat Law prevents Groningen from effectively realizing sustainable heat transition plans and goals. Lack of capacity on the distribution grid for electricity | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P001: PED/PED relevant concept definition | ||||||
B1P001: PED/PED relevant concept definition | (not specified) | The case study follows the concept of syn.ikia with sustainable plus energy neighbourhoods (SPEN) and aims to reach a plus energy balance based on EPB uses on an annual basis. | (not specified) | ExPEDite aims at creating and deploying a novel digital twin, allowing for real-time monitoring, visualization and management of district-level energy flows. Cities consume 65% of the world’s energy supply and are responsible for 70% of the CO² emissions, hence sharing a lot of the responsibility for climate change. We are faced with the challenge of redesigning our existing cities to make them more sustainable, resilient, inclusive and safe. Developing Positive Energy Districts (PEDs), is a breakthrough way to deal with the issue of urban emissions and applying adaptation and mitigation strategies to climate change, while ensuring that these urban areas generate an annual surplus of renewable energy and net zero greenhouse gas emissions. PEDs must address environmental, economic and social issues, providing solutions to energy consumption, production, emissions, transport & mobility and livability. By constantly monitoring and evaluating parameters through existing and/or novel sensor systems (e.g., renewable energy production/supply, transport conditions, air quality, energy demand, meteorological conditions, etc.), unconventional techniques may be applied to provide more sustainable options for the district’s needs. | (not specified) | (not specified) |
B1P002: Motivation behind PED/PED relevant project development | ||||||
B1P002: Motivation behind PED/PED relevant project development | (not specified) | The developers call their concept for Future Living, where the neighbourhood consist of highly energy-efficient buildings, is supplied with renewable energy onsite and includes green areas for well-being. | (not specified) | Expected outcome 1 Increased number of (tangible) city planning actions for positive clean energy districts using the (proto-)PED design, development and management digital twin tools (based on pre-market research learnings) using open-standards based components which can be reused elsewhere. 2 Increased integration of existing smaller scale management systems (e.g. Building management systems) with open-standards based operational city platforms using sectorial data (e.g. building data, mobility, urban planning, etc.). 3 Enhanced data gathering approaches with identification of relevant multidimensional data sets (e.g. meteorological, load profile, social, geo-spatial, etc.) high-resolution real-time data streams (e.g. renewable energy production, energy consumption), and relevant forecasting data, drawing also on the work of common European data spaces. 4 Increased number of city planning departments / approaches using common data and (replicable) elements and processes. 5 Consolidated city sensor network specifications, complemented by appropriate data gathering approaches for soft data. 6 Improved performance of AI based self-learning systems for optimization of positive clean energy districts and bottom-up complex models. 7 Enhanced innovation capacity of local/regional administrations and accelerated uptake of shared, smart and sustainable zero emission solutions. | (not specified) | (not specified) |
B1P003: Environment of the case study area | ||||||
B2P003: Environment of the case study area | (not specified) | Suburban area | Urban area | Urban area | (not specified) | (not specified) |
B1P004: Type of district | ||||||
B2P004: Type of district | (not specified) |
|
| (not specified) | (not specified) | (not specified) |
B1P005: Case Study Context | ||||||
B1P005: Case Study Context | (not specified) |
|
| (not specified) | (not specified) | (not specified) |
B1P006: Year of construction | ||||||
B1P006: Year of construction | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P007: District population before intervention - Residential | ||||||
B1P007: District population before intervention - Residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P008: District population after intervention - Residential | ||||||
B1P008: District population after intervention - Residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P009: District population before intervention - Non-residential | ||||||
B1P009: District population before intervention - Non-residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P010: District population after intervention - Non-residential | ||||||
B1P010: District population after intervention - Non-residential | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P011: Population density before intervention | ||||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 | 0 |
B1P012: Population density after intervention | ||||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0 | 0 | 0 |
B1P013: Building and Land Use before intervention | ||||||
B1P013: Residential | no | no | yes | no | no | no |
B1P013 - Residential: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Office | no | no | no | no | no | no |
B1P013 - Office: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Industry and Utility | no | yes | no | no | no | no |
B1P013 - Industry and Utility: Specify the sqm | (not specified) | whole site was used for idustry and excavation m² | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Commercial | no | no | no | no | no | no |
B1P013 - Commercial: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Institutional | no | no | no | no | no | no |
B1P013 - Institutional: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Natural areas | no | no | no | no | no | no |
B1P013 - Natural areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Recreational | no | no | no | no | no | no |
B1P013 - Recreational: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Dismissed areas | no | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P013: Other | no | no | no | no | no | no |
B1P013 - Other: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Building and Land Use after intervention | ||||||
B1P014: Residential | no | yes | yes | no | no | no |
B1P014 - Residential: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Office | no | no | no | no | no | no |
B1P014 - Office: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Industry and Utility | no | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Commercial | no | no | no | no | no | no |
B1P014 - Commercial: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Institutional | no | no | no | no | no | no |
B1P014 - Institutional: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Natural areas | no | no | no | no | no | no |
B1P014 - Natural areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Recreational | no | no | no | no | no | no |
B1P014 - Recreational: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Dismissed areas | no | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B1P014: Other | no | no | no | no | no | no |
B1P014 - Other: Specify the sqm | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P001: PED Lab concept definition | ||||||
B2P001: PED Lab concept definition | Groningen was selected as Lighthouse City for the MAKING-CITY project. MAKING-CITY is a 60-month Horizon 2020 project launched in December 2018. It aims to address and demonstrate the urban energy system transformation towards smart and low-carbon cities, based on the Positive Energy District (PED) concept. The PED operational models developed in MAKING-CITY will help European and other cities around the world to adopt a long-term City Vision 2050 for energy transition and sustainable urbanisation whilst turning citizens into actors of this transformation. Groningen works with two PED districts in two completely different neighbourhoods in terms of structure and buildings. This is why we see this as a lab: to see wat works and what doesn’t. In order to be able to implement this in the rest of the city. | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P002: Installation life time | ||||||
B2P002: Installation life time | The MAKING-CITY project lasts from November 2018 – November 2023. By that time PED North and PED South East are a fact. | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P003: Scale of action | ||||||
B2P003: Scale | District | (not specified) | District | (not specified) | (not specified) | (not specified) |
B2P004: Operator of the installation | ||||||
B2P004: Operator of the installation | The Municipality of Groningen is Manager of the lab but works closely with other parties such as the university, university of applied sciences, research institute TNO and several other parties. | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | ||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | Groningen does not have a strategy to reuse and recyle materials | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P006: Circular Economy Approach | ||||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | No | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P006: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P007: Motivation for developing the PED Lab | ||||||
B2P007: Motivation for developing the PED Lab |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P007: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P008: Lead partner that manages the PED Lab | ||||||
B2P008: Lead partner that manages the PED Lab | Municipality | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P008: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P009: Collaborative partners that participate in the PED Lab | ||||||
B2P009: Collaborative partners that participate in the PED Lab |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P009: Other | research companies, monitoring company, ict company | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P010: Synergies between the fields of activities | ||||||
B2P010: Synergies between the fields of activities | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P011: Available facilities to test urban configurations in PED Lab | ||||||
B2P011: Available facilities to test urban configurations in PED Lab |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P011: Other | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P012: Incubation capacities of PED Lab | ||||||
B2P012: Incubation capacities of PED Lab |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P013: Availability of the facilities for external people | ||||||
B2P013: Availability of the facilities for external people | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P014: Monitoring measures | ||||||
B2P014: Monitoring measures |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P015: Key Performance indicators | ||||||
B2P015: Key Performance indicators |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P016: Execution of operations | ||||||
B2P016: Execution of operations | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P017: Capacities | ||||||
B2P017: Capacities | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P018: Relations with stakeholders | ||||||
B2P018: Relations with stakeholders | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P019: Available tools | ||||||
B2P019: Available tools |
| (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P019: Available tools | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
B2P020: External accessibility | ||||||
B2P020: External accessibility | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P001: Unlocking Factors | ||||||
C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 3 - Moderately important | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P001: Energy Communities, P2P, Prosumers concepts | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P001: Storage systems and E-mobility market penetration | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P001: Decreasing costs of innovative materials | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P001: The ability to predict Multiple Benefits | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P001: The ability to predict the distribution of benefits and impacts | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 2 - Slightly important |
C1P001: Social acceptance (top-down) | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 3 - Moderately important |
C1P001: Presence of integrated urban strategies and plans | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P001: Multidisciplinary approaches available for systemic integration | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important |
C1P001: Availability of RES on site (Local RES) | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P001: Any other UNLOCKING FACTORS (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P002: Driving Factors | ||||||
C1P002: Climate Change adaptation need | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 5 - Very important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important |
C1P002: Rapid urbanization trend and need of urban expansions | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P002: Urban re-development of existing built environment | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important |
C1P002: Economic growth need | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important |
C1P002: Territorial and market attractiveness | 2 - Slightly important | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P002: Energy autonomy/independence | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important |
C1P002: Any other DRIVING FACTOR | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P002: Any other DRIVING FACTOR (if any) | Earthquakes due to gas extraction | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P003: Administrative barriers | ||||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 3 - Moderately important |
C1P003: Lack of good cooperation and acceptance among partners | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P003: Lack of public participation | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P003: Lack of institutions/mechanisms to disseminate information | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P003:Long and complex procedures for authorization of project activities | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P003: Complicated and non-comprehensive public procurement | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P003: Fragmented and or complex ownership structure | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P003: Lack of internal capacities to support energy transition | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P003: Any other Administrative BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P003: Any other Administrative BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P004: Policy barriers | ||||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P004: Lacking or fragmented local political commitment and support on the long term | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important |
C1P004: Lack of Cooperation & support between national-regional-local entities | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P004: Any other Political BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P005: Legal and Regulatory barriers | ||||||
C1P005: Inadequate regulations for new technologies | 4 - Important | 5 - Very important | 1 - Unimportant | 4 - Important | 1 - Unimportant | 4 - Important |
C1P005: Regulatory instability | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P005: Non-effective regulations | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P005: Unfavorable local regulations for innovative technologies | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P005: Building code and land-use planning hindering innovative technologies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P005: Insufficient or insecure financial incentives | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P005: Shortage of proven and tested solutions and examples | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P005: Any other Legal and Regulatory BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P006: Environmental barriers | ||||||
C1P006: Environmental barriers | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P007: Technical barriers | ||||||
C1P007: Lack of skilled and trained personnel | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P007: Deficient planning | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P007: Retrofitting work in dwellings in occupied state | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P007: Lack of well-defined process | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P007: Inaccuracy in energy modelling and simulation | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant |
C1P007: Lack/cost of computational scalability | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P007: Grid congestion, grid instability | 4 - Important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 1 - Unimportant |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P007: Difficult definition of system boundaries | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P007: Any other Thecnical BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P008: Social and Cultural barriers | ||||||
C1P008: Inertia | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P008: Lack of values and interest in energy optimization measurements | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P008: Low acceptance of new projects and technologies | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P008: Difficulty of finding and engaging relevant actors | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Lack of trust beyond social network | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Rebound effect | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Hostile or passive attitude towards environmentalism | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P008: Exclusion of socially disadvantaged groups | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Non-energy issues are more important and urgent for actors | 4 - Important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P008: Hostile or passive attitude towards energy collaboration | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P008: Any other Social BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P009: Information and Awareness barriers | ||||||
C1P009: Insufficient information on the part of potential users and consumers | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 2 - Slightly important |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P009: Lack of awareness among authorities | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P009: Information asymmetry causing power asymmetry of established actors | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P009: High costs of design, material, construction, and installation | 4 - Important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P009: Any other Information and Awareness BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P010: Financial barriers | ||||||
C1P010: Hidden costs | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 2 - Slightly important |
C1P010: Insufficient external financial support and funding for project activities | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P010: Economic crisis | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 4 - Important |
C1P010: Risk and uncertainty | 3 - Moderately important | 4 - Important | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important |
C1P010: Lack of consolidated and tested business models | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P010: Limited access to capital and cost disincentives | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 3 - Moderately important |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P010: Any other Financial BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P011: Market barriers | ||||||
C1P011: Split incentives | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P011: Energy price distortion | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 4 - Important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant |
C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant |
C1P011: Any other Market BARRIER (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Stakeholders involved | ||||||
C1P012: Government/Public Authorities |
|
| (not specified) |
| (not specified) | (not specified) |
C1P012: Research & Innovation |
|
| (not specified) |
| (not specified) | (not specified) |
C1P012: Financial/Funding |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Analyst, ICT and Big Data |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Business process management |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Urban Services providers |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Real Estate developers |
|
| (not specified) |
| (not specified) | (not specified) |
C1P012: Design/Construction companies |
|
| (not specified) |
| (not specified) | (not specified) |
C1P012: End‐users/Occupants/Energy Citizens |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Social/Civil Society/NGOs |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Industry/SME/eCommerce |
| (not specified) | (not specified) |
| (not specified) | (not specified) |
C1P012: Other | (not specified) |
| (not specified) | (not specified) | (not specified) | (not specified) |
C1P012: Other (if any) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) | (not specified) |
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)