Name | Project | Type | Compare |
---|---|---|---|
Romania, Alba Iulia PED | ASCEND – Accelerate poSitive Clean ENergy Districts | PED Case Study | Compare |
Romania, Alba Iulia PED | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Munich, Harthof district | PED Case Study | Compare | |
Lublin | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Uncompare |
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Uncompare |
Bærum, Eiksveien 116 | CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings | PED Relevant Case Study | Uncompare |
Findhorn, the Park | InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts | PED Case Study | Compare |
Amsterdam, Buiksloterham PED | ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities | PED Case Study | Compare |
Schönbühel-Aggsbach, Schönbühel an der Donau | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Umeå, Ålidhem district | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Aalborg East | PED Relevant Case Study / PED Lab | Compare | |
Ankara, Çamlık District | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study / PED Relevant Case Study | Compare |
Trenčín | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Luxembourg, Betzdorf | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Vantaa, Aviapolis | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Vidin, Himik and Bononia | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Uncompare |
Oslo, Verksbyen | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Uden, Loopkantstraat | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Relevant Case Study | Compare |
Zaragoza, Actur | NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts | PED Relevant Case Study | Compare |
Aarhus, Brabrand | BIPED – Building Intelligent Positive Energy Districts | PED Case Study / PED Relevant Case Study / PED Lab | Compare |
Riga, Ķīpsala, RTU smart student city | ExPEDite – Enabling Positive Energy Districts through Digital Twins | PED Case Study | Uncompare |
Izmir, District of Karşıyaka | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Case Study | Compare |
Istanbul, Ozyegin University Campus | LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes | PED Relevant Case Study | Compare |
Espoo, Kera | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study / PED Relevant Case Study | Compare |
Borlänge, Rymdgatan’s Residential Portfolio | PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation | PED Relevant Case Study | Compare |
Freiburg, Waldsee | PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district | PED Case Study | Compare |
Innsbruck, Campagne-Areal | PED Relevant Case Study | Compare | |
Graz, Reininghausgründe | PED Case Study | Compare | |
Stor-Elvdal, Campus Evenstad | ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities | PED Relevant Case Study | Compare |
Oulu, Kaukovainio | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Halmstad, Fyllinge | PED Relevant Case Study | Compare | |
Lund, Brunnshög district | PED Case Study | Compare | |
Vienna, Am Kempelenpark | PED Case Study | Compare | |
Évora, Portugal | POCITYF – A POsitive Energy CITY Transformation Framework | PED Relevant Case Study / PED Lab | Compare |
Kladno, Sletiště (Sport Area), PED Winter Stadium | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Uncompare |
Groningen, PED South | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Groningen, PED North | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Lab | Compare |
Maia, Sobreiro Social Housing | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Lab | Compare |
Lubia (Soria), CEDER-CIEMAT | PED Lab | Compare | |
Tampere, Ilokkaanpuisto district | STARDUST – Holistic and Integrated Urban Model for Smart Cities | PED Relevant Case Study | Compare |
Leon, Former Sugar Factory district | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Istanbul, Kadikoy district, Caferaga | MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future | PED Case Study | Compare |
Espoo, Leppävaara district, Sello center | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Uncompare |
Espoo, Espoonlahti district, Lippulaiva block | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Salzburg, Gneis district | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Compare |
Barcelona, Santa Coloma de Gramenet | Syn.ikia – Sustainable Plus Energy Neighbourhoods | PED Case Study | Uncompare |
Tartu, City centre area | SmartEnCity – Towards Smart Zero CO2 Cities across Europe | PED Relevant Case Study / PED Lab | |
Bologna, Pilastro-Roveri district | GRETA – GReen Energy Transition Actions | PED Relevant Case Study | Compare |
Barcelona, SEILAB & Energy SmartLab | PED Lab | Compare | |
Leipzig, Baumwollspinnerei district | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Case Study | Compare |
Kifissia, Energy community | SPARCS – Sustainable energy Positive & zero cARbon CommunitieS | PED Relevant Case Study | Compare |
Title | Tartu, City centre area | Bærum, Eiksveien 116 | Barcelona, Santa Coloma de Gramenet | Roubaix, MustBe0 - Résidence Philippe le Hardi – 125 Rue d’Oran | Vidin, Himik and Bononia | Kladno, Sletiště (Sport Area), PED Winter Stadium | Espoo, Leppävaara district, Sello center | Lublin | Riga, Ķīpsala, RTU smart student city |
---|---|---|---|---|---|---|---|---|---|
A1P001: Name of the PED case study / PED Lab | |||||||||
A1P001: Name of the PED case study / PED Lab | Tartu, City centre area | Bærum, Eiksveien 116 | Barcelona, Santa Coloma de Gramenet | Roubaix, MustBe0 - Résidence Philippe le Hardi – 125 Rue d’Oran | Vidin, Himik and Bononia | Kladno, Sletiště (Sport Area), PED Winter Stadium | Espoo, Leppävaara district, Sello center | Lublin | Riga, Ķīpsala, RTU smart student city |
A1P002: Map / aerial view / photos / graphic details / leaflet | |||||||||
A1P002: Map / aerial view / photos / graphic details / leaflet |
|
| |||||||
A1P003: Categorisation of the PED site | |||||||||
PED case study | no | no | yes | no | yes | no | yes | yes | yes |
PED relevant case study | yes | yes | no | yes | no | yes | no | no | no |
PED Lab. | yes | no | no | no | no | no | no | no | no |
A1P004: Targets of the PED case study / PED Lab | |||||||||
Climate neutrality | yes | yes | yes | yes | yes | yes | yes | yes | yes |
Annual energy surplus | no | no | yes | yes | yes | yes | no | yes | no |
Energy community | no | no | no | no | no | yes | no | yes | yes |
Circularity | yes | no | no | no | no | no | no | yes | no |
Air quality and urban comfort | no | no | yes | yes | no | no | no | yes | no |
Electrification | yes | yes | no | no | no | yes | no | no | no |
Net-zero energy cost | no | yes | no | no | no | no | no | yes | no |
Net-zero emission | yes | yes | no | no | no | no | no | yes | no |
Self-sufficiency (energy autonomous) | no | no | no | no | no | no | no | yes | yes |
Maximise self-sufficiency | yes | no | no | no | no | no | yes | yes | yes |
Other | no | no | no | no | no | no | no | no | no |
Other (A1P004) | |||||||||
A1P005: Phase of the PED case study / PED Lab | |||||||||
A1P005: Project Phase of your case study/PED Lab | Implementation Phase | Completed | Implementation Phase | Completed | Planning Phase | Planning Phase | Implementation Phase | Planning Phase | Planning Phase |
A1P006: Start Date | |||||||||
A1P006: Start date | 02/16 | 01/18 | 01/22 | 12/18 | 2022 | 09/19 | 01/24 | ||
A1P007: End Date | |||||||||
A1P007: End date | 07/22 | 06/23 | 01/24 | 12/30 | 10/22 | 12/26 | |||
A1P008: Reference Project | |||||||||
A1P008: Reference Project | |||||||||
A1P009: Data availability | |||||||||
A1P009: Data availability |
|
|
|
|
|
|
| ||
A1P009: Other | |||||||||
A1P010: Sources | |||||||||
Any publication, link to website, deliverable referring to the PED/PED Lab |
| ||||||||
A1P011: Geographic coordinates | |||||||||
X Coordinate (longitude): | 26.722737 | 10.5333 | 2.16 | 3.1651 | 22.8826 | 14.09296 | 24.8101 | 22.5684 | 24.08168339 |
Y Coordinate (latitude): | 58.380713 | 59.9100 | 41.39 | 50.6937 | 43.9936 | 50.13715 | 60.2179 | 51.2465 | 56.95245956 |
A1P012: Country | |||||||||
A1P012: Country | Estonia | Norway | Spain | France | Bulgaria | Czech Republic | Finland | Poland | Latvia |
A1P013: City | |||||||||
A1P013: City | Tartu | Bærum | Barcelona | Roubaix | Vidin | Kladno | Espoo | Lublin | Riga |
A1P014: Climate Zone (Köppen Geiger classification) | |||||||||
A1P014: Climate Zone (Köppen Geiger classification). | Dfb | Dfb | Csa | Cfb | Cfa | Cfb | Dfb | Cfb | Cfb |
A1P015: District boundary | |||||||||
A1P015: District boundary | Functional | Other | Geographic | Other | Geographic | Geographic | Geographic | Geographic | Geographic |
Other | Building | PEB | V1* (ca 8 buildings) | ||||||
A1P016: Ownership of the case study/PED Lab | |||||||||
A1P016: Ownership of the case study/PED Lab: | Private | Public | Private | Private | Mixed | Mixed | Private | Public | |
A1P017: Ownership of the land / physical infrastructure | |||||||||
A1P017: Ownership of the land / physical infrastructure: | Multiple Owners | Single Owner | Single Owner | Single Owner | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners | Multiple Owners |
A1P018: Number of buildings in PED | |||||||||
A1P018: Number of buildings in PED | 18 | 1 | 16 | 1 | 74 | 8 | 5 | 5 | 15 |
A1P019: Conditioned space | |||||||||
A1P019: Conditioned space [m²] | 35217 | 21542 | 1442 | 98759.53 | 267956 | 21664.73 | 170000 | ||
A1P020: Total ground area | |||||||||
A1P020: Total ground area [m²] | 793144 | 2500 | 195234.80 | 53000 | 72833.47 | 119264 | |||
A1P021: Floor area ratio: Conditioned space / total ground area | |||||||||
A1P021: Floor area ratio: Conditioned space / total ground area | 0 | 0 | 0 | 1 | 1 | 0 | 5 | 0 | 1 |
A1P022: Financial schemes | |||||||||
A1P022a: Financing - PRIVATE - Real estate | yes | no | no | yes | no | yes | no | no | no |
A1P022a: Add the value in EUR if available [EUR] | 6500000 | 0 | |||||||
A1P022b: Financing - PRIVATE - ESCO scheme | no | no | no | no | no | yes | no | no | no |
A1P022b: Add the value in EUR if available [EUR] | |||||||||
A1P022c: Financing - PRIVATE - Other | no | no | no | no | no | no | no | no | no |
A1P022c: Add the value in EUR if available [EUR] | |||||||||
A1P022d: Financing - PUBLIC - EU structural funding | yes | no | no | no | no | yes | no | no | no |
A1P022d: Add the value in EUR if available [EUR] | 4000000 | ||||||||
A1P022e: Financing - PUBLIC - National funding | yes | no | no | no | yes | no | no | no | no |
A1P022e: Add the value in EUR if available [EUR] | 8000000 | ||||||||
A1P022f: Financing - PUBLIC - Regional funding | no | no | no | yes | no | no | no | no | no |
A1P022f: Add the value in EUR if available [EUR] | |||||||||
A1P022g: Financing - PUBLIC - Municipal funding | no | yes | no | yes | no | yes | no | no | no |
A1P022g: Add the value in EUR if available [EUR] | |||||||||
A1P022h: Financing - PUBLIC - Other | no | no | no | no | no | no | no | no | no |
A1P022h: Add the value in EUR if available [EUR] | |||||||||
A1P022i: Financing - RESEARCH FUNDING - EU | no | no | yes | yes | no | yes | yes | no | yes |
A1P022i: Add the value in EUR if available [EUR] | 503903 | 629000 | 7500000 | ||||||
A1P022j: Financing - RESEARCH FUNDING - National | no | no | no | no | no | yes | no | no | no |
A1P022j: Add the value in EUR if available [EUR] | |||||||||
A1P022k: Financing - RESEARCH FUNDING - Local/regional | no | no | no | no | no | no | no | no | no |
A1P022k: Add the value in EUR if available [EUR] | |||||||||
A1P022l: Financing - RESEARCH FUNDING - Other | no | no | no | no | no | no | no | no | no |
A1P022l: Add the value in EUR if available [EUR] | |||||||||
A1P022: Other | Retrofitted through various subsidies | ||||||||
A1P023: Economic Targets | |||||||||
A1P023: Economic Targets |
|
|
|
|
|
|
| ||
A1P023: Other | Social housing | ||||||||
A1P024: More comments: | |||||||||
A1P024: More comments: | The building comprises 32 homes. The refurbishment complies with EnergieSprong specifications. This implies a performance of E=0 over 25 years. | Lublin PED Area is geographically bounded and the ambition is to reach Self-Sufficiency. There is a shopping centre with a large rooftop area for solar generation and there are also an empty lot (just on the east side of the building) and a carpark area (on the north side) next to the commercial centre. These areas can also be evaluated for on-site (on the ground – or canopies for cars) energy generation. There are also new built (mainly in 2012) residential blocks with high efficiency and this district is so-called an “eco-district”. Thanks to the District Heating Grid (DHN), all buildings are connected to each other the network has potential for sharing mechanisms in the PED Area. Another opportunity for renewable energy is that these buildings are connected to more or less the end point of DHN and for this reason, a waste heat potential from the return pipe may also be considered. There are also small size residentials, that are not connected to the DHN, around the PED area and this enlightened the technical team for exporting energy from PED to these areas with a new infrastructure. | |||||||
A1P025: Estimated PED case study / PED LAB costs | |||||||||
A1P025: Estimated PED case study / PED LAB costs [mil. EUR] | 25 | 3.6 | |||||||
Contact person for general enquiries | |||||||||
A1P026: Name | Jaanus Tamm | John Einar Thommesen | Jaume Salom | Julien Holgard | Daniela Kostova | David Škorňa | Jaano Juhmen | Dorota Wolińska-Pietrzak | Judith Stiekema |
A1P027: Organization | Tartu City Government | SINTEF Community | IREC | Vilogia | Green Synergy Cluster | Město Kladno | SIEMENS - Data Center Forum | Lublin Municipality | OASC |
A1P028: Affiliation | Municipality / Public Bodies | Municipality / Public Bodies | Research Center / University | Other | Other | Municipality / Public Bodies | SME / Industry | Municipality / Public Bodies | Other |
A1P028: Other | Social Housing Company | Cluster | not for profit private organisation | ||||||
A1P029: Email | Jaanus.tamm@tartu.ee | john.thommesen@sintef.no | jsalom@irec.cat | julien.holgard@vilogia.fr | daniela@greensynergycluster.eu | david.skorna@mestokladno.cz | Jaano.juhmen@siemens.com | dwolinska@lublin.eu | judith@oascities.org |
Contact person for other special topics | |||||||||
A1P030: Name | Kaspar Alev | John Einar Thommesen | Joan Estrada Aliberas | Julien Holgard | Michal Kuzmič | ||||
A1P031: Email | Kaspar.alev@tartu.ee | john.thommesen@sintef.no | j_estrada@gencat.cat | julien.holgard@vilogia.fr | michal.kuzmic@cvut.cz | ||||
Pursuant to the General Data Protection Regulation | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes | Yes |
A2P001: Fields of application | |||||||||
A2P001: Fields of application |
|
|
|
|
|
|
| ||
A2P001: Other | |||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | |||||||||
A2P002: Tools/strategies/methods applied for each of the above-selected fields | Energy efficiency: - buildings retrofitting - combined public and private financing - low temperature central heating - LED lighting Energy production: - installation of photovoltaic (PV) systems for renewable on-site energy production; Digital technologies: - smart-meters smart home system. Smart city information platform E-mobility - Installation of new charging stations for electric vehicles; - e-bike/bikesharing services implementation. Urban comfort and air quality - Control units for air pollutants concentration (PM2.5, PM10, NO2) - Sustainable Energy and Climate Action Plan - SECAP) | - Integrated energy design process of both active and passive elements - Multicriteria analysis of energy system, environmental variables, indoor comfort and economic parameters - Energy modelling - Predictive control to optimize performance within the neighbourhood | Trnsys, PV modelling tools, CAD | SEE: D4.1 - Methodology and Guidelines for PED design https://makingcity.eu/results/#1551708358627-aefa76ef-66b2 | A suite of replicable modeling tools will enable stakeholders to analyze planning actions towards positive energy in a cost-effective fashion, aiding their evidence based decision-making process. The tools will be able to model the district’s energy production and demand, optimize for flexibility and simulate mobility and transport. By employing gamification and co-creation approaches, the project will enhance public awareness and engagement in energy efficiency. The project will culminate in the publication of practical guidelines, reusable models, algorithms, and training materials to aid other cities to replicate the digital twin for their districts, fostering widespread adoption of sustainable energy practices. | ||||
A2P003: Application of ISO52000 | |||||||||
A2P003: Application of ISO52000 | No | No | No | No | No | No | |||
A2P004: Appliances included in the calculation of the energy balance | |||||||||
A2P004: Appliances included in the calculation of the energy balance | Yes | No | Yes | No | Yes | Yes | Yes | ||
A2P005: Mobility included in the calculation of the energy balance | |||||||||
A2P005: Mobility included in the calculation of the energy balance | No | No | No | Yes | No | No | Yes | ||
A2P006: Description of how mobility is included (or not included) in the calculation | |||||||||
A2P006: Description of how mobility is included (or not included) in the calculation | Not yet included. | The university operates a fleet of 13 electric vehicles (EV) (61kW power each). There are 5 EV charging stations on campus. | |||||||
A2P007: Annual energy demand in buildings / Thermal demand | |||||||||
A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum] | 9.1 | 1.4 | 8000 | ||||||
A2P008: Annual energy demand in buildings / Electric Demand | |||||||||
A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum] | 0.3 | 5000 | |||||||
A2P009: Annual energy demand for e-mobility | |||||||||
A2P009: Annual energy demand for e-mobility [GWh/annum] | |||||||||
A2P010: Annual energy demand for urban infrastructure | |||||||||
A2P010: Annual energy demand for urban infrastructure [GWh/annum] | |||||||||
A2P011: Annual renewable electricity production on-site during target year | |||||||||
A2P011: PV | yes | no | yes | yes | no | yes | no | no | no |
A2P011: PV - specify production in GWh/annum [GWh/annum] | 0.05 | 1.1 | |||||||
A2P011: Wind | no | no | no | no | no | no | no | no | yes |
A2P011: Wind - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Hydro | no | no | no | no | no | no | no | no | no |
A2P011: Hydro - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Biomass_el | no | no | no | no | no | no | no | no | no |
A2P011: Biomass_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Biomass_peat_el | no | no | no | no | no | no | no | no | no |
A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: PVT_el | no | no | no | no | no | no | no | no | yes |
A2P011: PVT_el - specify production in GWh/annum [GWh/annum] | |||||||||
A2P011: Other | no | no | yes | no | no | no | no | no | no |
A2P011: Other - specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Annual renewable thermal production on-site during target year | |||||||||
A2P012: Geothermal | no | no | no | no | no | no | no | no | no |
A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Solar Thermal | yes | no | no | no | no | no | no | no | no |
A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum] | 0.5 | ||||||||
A2P012: Biomass_heat | no | no | no | no | no | no | no | no | yes |
A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Waste heat+HP | no | no | no | no | no | yes | no | no | no |
A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum] | 1.7 | ||||||||
A2P012: Biomass_peat_heat | no | no | no | no | no | no | no | no | no |
A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: PVT_th | no | no | no | no | no | no | no | no | no |
A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Biomass_firewood_th | no | no | no | no | no | no | no | no | no |
A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P012: Other | no | no | no | no | no | no | no | no | no |
A2P012 - Other: Please specify production in GWh/annum [GWh/annum] | |||||||||
A2P013: Renewable resources on-site - Additional notes | |||||||||
A2P013: Renewable resources on-site - Additional notes | -Rooftop PV 39.1 kWp -4 pipe air-to-water heat pump to cover heating and cooling | Waste heat from cooling the ice rink. | Conventional power generation: The university’s heat supply is designed as a local centralized heat supply system. Electrical power, generated in combined heat and power (CHP) units, is delivered to the distribution network and sold to energy traders as regulated by local legislation and norms. There are two natural gas burners acting as heat sources (3MW and 6MW capacity), and two CHP units (1.6MW and 0.45MW thermal capacity). All heating is supplied from the CHP plants. Renewable Energy Sources (RES): a wind turbine (3.6 kW) and PV panels (11.7 kW) are connected to the faculty microgrid. In the future it is planned to power the campus entirely from local RES. | ||||||
A2P014: Annual energy use | |||||||||
A2P014: Annual energy use [GWh/annum] | 0.033 | 0.084 | 2.1 | ||||||
A2P015: Annual energy delivered | |||||||||
A2P015: Annual energy delivered [GWh/annum] | 0.030 | 0.11 | |||||||
A2P016: Annual non-renewable electricity production on-site during target year | |||||||||
A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum] | 0 | 0 | |||||||
A2P017: Annual non-renewable thermal production on-site during target year | |||||||||
A2P017: Gas | no | no | no | no | no | no | no | no | yes |
A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Coal | no | no | no | no | no | no | no | no | no |
A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Oil | no | no | no | no | no | no | no | no | no |
A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P017: Other | no | no | no | no | no | no | no | no | no |
A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum] | |||||||||
A2P018: Annual renewable electricity imports from outside the boundary during target year | |||||||||
A2P018: PV | no | no | no | no | no | no | no | no | no |
A2P018 - PV: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Wind | no | no | no | no | no | no | no | no | no |
A2P018 - Wind: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Hydro | no | no | no | no | no | no | no | no | no |
A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Biomass_el | no | no | no | no | no | no | no | no | no |
A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Biomass_peat_el | no | no | no | no | no | no | no | no | no |
A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: PVT_el | no | no | no | no | no | no | no | no | no |
A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P018: Other | no | no | no | no | no | no | no | no | no |
A2P018 - Other: specify production in GWh/annum if available [GWh/annum] | |||||||||
A2P019: Annual renewable thermal imports from outside the boundary during target year | |||||||||
A2P019: Geothermal | no | no | no | no | no | no | no | no | no |
A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Solar Thermal | no | no | no | no | no | no | no | no | no |
A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_heat | no | no | no | no | no | no | no | no | no |
A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Waste heat+HP | no | no | no | no | no | no | no | no | no |
A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_peat_heat | no | no | no | no | no | no | no | no | no |
A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: PVT_th | no | no | no | no | no | no | no | no | no |
A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Biomass_firewood_th | no | no | no | no | no | no | no | no | no |
A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P019: Other | no | no | no | no | no | no | no | no | no |
A2P019 Other: Please specify imports in GWh/annum [GWh/annum] | |||||||||
A2P020: Share of RES on-site / RES outside the boundary | |||||||||
A2P020: Share of RES on-site / RES outside the boundary | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
A2P021: GHG-balance calculated for the PED | |||||||||
A2P021: GHG-balance calculated for the PED [tCO2/annum] | 980 | -104 | |||||||
A2P022: KPIs related to the PED case study / PED Lab | |||||||||
A2P022: Safety & Security | |||||||||
A2P022: Health | Carbon Dioxide (CO2) levels, Predicted Mean Vote,Predicted Percentage of Dissatisfied, Temperature, Relative Humidity, Illuminance, Daylight factor, Sound pressure levels | ||||||||
A2P022: Education | |||||||||
A2P022: Mobility | |||||||||
A2P022: Energy | Non-renewable primary energy balance, Renewable energy ratio, Grid Purchase factor, Load cover factor/Self-generation, Supply cover factor/Self-consumption, Net energy/Net power, Peak delivered/exported power, Connection capacity credit, Total greenhouse gas emissions | Energy demand (heating and hot water), Energy demand (cooling), Cooling demand, Distributin losses, PV production, RES production, OER, Primafry Non-renewable energy balance, AMR, HMR, CO2 balance | |||||||
A2P022: Water | |||||||||
A2P022: Economic development | : Investment costs, Share of investments covered by grants, Maintenance-related costs, Requirement-related costs, Operation-related costs, Other costs, Net Present Value, Internal Rate of Return, Economic Value Added, Payback Period, nZEB Cost Comparison | Investment cost, Caputal cost, Operation cost, payback period, NPV, cummulated cash flow, savings, Life cycle, ROI, SROI | |||||||
A2P022: Housing and Community | : Access to services, Affordability of energy, Affordability of housing, Democratic legitimacy, Living conditions, Social cohesion, Personal safety, Energy consciousness | ||||||||
A2P022: Waste | |||||||||
A2P022: Other | |||||||||
A2P023: Technological Solutions / Innovations - Energy Generation | |||||||||
A2P023: Photovoltaics | yes | no | yes | yes | yes | yes | no | yes | no |
A2P023: Solar thermal collectors | no | no | no | no | no | no | no | no | no |
A2P023: Wind Turbines | no | no | no | no | no | no | no | no | no |
A2P023: Geothermal energy system | no | no | no | no | yes | no | no | no | no |
A2P023: Waste heat recovery | no | no | no | no | no | yes | no | no | no |
A2P023: Waste to energy | no | no | no | no | no | no | no | no | no |
A2P023: Polygeneration | no | no | no | no | no | no | no | no | no |
A2P023: Co-generation | no | no | no | no | no | no | no | no | no |
A2P023: Heat Pump | no | no | yes | no | yes | yes | no | yes | no |
A2P023: Hydrogen | no | no | no | no | no | no | no | yes | no |
A2P023: Hydropower plant | no | no | no | no | no | no | no | no | no |
A2P023: Biomass | yes | no | no | no | no | no | no | no | no |
A2P023: Biogas | yes | no | no | no | no | no | no | no | no |
A2P023: Other | |||||||||
A2P024: Technological Solutions / Innovations - Energy Flexibility | |||||||||
A2P024: A2P024: Information and Communication Technologies (ICT) | yes | no | no | no | no | yes | no | yes | yes |
A2P024: Energy management system | yes | no | yes | no | no | yes | no | yes | yes |
A2P024: Demand-side management | no | no | yes | no | no | yes | no | yes | yes |
A2P024: Smart electricity grid | no | no | no | no | no | no | no | yes | yes |
A2P024: Thermal Storage | no | no | no | no | no | no | no | yes | yes |
A2P024: Electric Storage | no | no | no | no | yes | no | no | yes | yes |
A2P024: District Heating and Cooling | yes | no | no | no | no | yes | no | yes | yes |
A2P024: Smart metering and demand-responsive control systems | no | no | no | yes | no | yes | no | yes | yes |
A2P024: P2P – buildings | no | no | no | no | no | no | no | no | no |
A2P024: Other | |||||||||
A2P025: Technological Solutions / Innovations - Energy Efficiency | |||||||||
A2P025: Deep Retrofitting | yes | no | no | yes | yes | yes | no | yes | no |
A2P025: Energy efficiency measures in historic buildings | no | no | no | no | no | no | no | yes | no |
A2P025: High-performance new buildings | no | no | yes | no | no | no | no | yes | no |
A2P025: Smart Public infrastructure (e.g. smart lighting) | yes | no | no | no | no | no | no | yes | no |
A2P025: Urban data platforms | yes | no | no | no | no | yes | no | yes | yes |
A2P025: Mobile applications for citizens | yes | no | no | no | no | no | no | yes | yes |
A2P025: Building services (HVAC & Lighting) | no | no | yes | no | no | yes | no | yes | yes |
A2P025: Smart irrigation | no | no | no | no | no | no | no | no | no |
A2P025: Digital tracking for waste disposal | no | no | no | no | no | no | no | no | no |
A2P025: Smart surveillance | yes | no | no | no | no | no | no | no | no |
A2P025: Other | |||||||||
A2P026: Technological Solutions / Innovations - Mobility | |||||||||
A2P026: Efficiency of vehicles (public and/or private) | yes | no | no | no | no | no | no | yes | no |
A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances) | yes | no | no | no | no | no | no | yes | no |
A2P026: e-Mobility | yes | no | no | no | no | no | no | yes | no |
A2P026: Soft mobility infrastructures and last mile solutions | no | no | no | no | no | no | no | no | no |
A2P026: Car-free area | no | no | no | no | no | no | no | no | no |
A2P026: Other | |||||||||
A2P027: Mobility strategies - Additional notes | |||||||||
A2P027: Mobility strategies - Additional notes | |||||||||
A2P028: Energy efficiency certificates | |||||||||
A2P028: Energy efficiency certificates | Yes | Yes | No | Yes | No | No | |||
A2P028: If yes, please specify and/or enter notes | Energy Performance Certificate | National standards apply. | |||||||
A2P029: Any other building / district certificates | |||||||||
A2P029: Any other building / district certificates | No | No | No | No | No | ||||
A2P029: If yes, please specify and/or enter notes | |||||||||
A3P001: Relevant city /national strategy | |||||||||
A3P001: Relevant city /national strategy |
|
|
|
|
|
| |||
A3P002: Quantitative targets included in the city / national strategy | |||||||||
A3P002: Quantitative targets included in the city / national strategy | Carbon neutrality 2050 | ||||||||
A3P003: Strategies towards decarbonization of the gas grid | |||||||||
A3P003: Strategies towards decarbonization of the gas grid |
|
|
|
| |||||
A3P003: Other | Heating Grid | ||||||||
A3P004: Identification of needs and priorities | |||||||||
A3P004: Identification of needs and priorities | Nursing home for people with special needs | ||||||||
A3P005: Sustainable behaviour | |||||||||
A3P005: Sustainable behaviour | |||||||||
A3P006: Economic strategies | |||||||||
A3P006: Economic strategies |
|
|
| ||||||
A3P006: Other | |||||||||
A3P007: Social models | |||||||||
A3P007: Social models |
|
|
|
|
|
|
| ||
A3P007: Other | |||||||||
A3P008: Integrated urban strategies | |||||||||
A3P008: Integrated urban strategies |
|
|
|
|
| ||||
A3P008: Other | |||||||||
A3P009: Environmental strategies | |||||||||
A3P009: Environmental strategies |
|
|
|
|
|
|
| ||
A3P009: Other | PEB | ||||||||
A3P010: Legal / Regulatory aspects | |||||||||
A3P010: Legal / Regulatory aspects | |||||||||
B1P001: PED/PED relevant concept definition | |||||||||
B1P001: PED/PED relevant concept definition | PEB | Refurbishment of social housing. The refurbishment complies with EnergieSprong specifications. This implies a performance of E=0 over 25 years. | Onsite Energy Ratio > 1 | ExPEDite aims at creating and deploying a novel digital twin, allowing for real-time monitoring, visualization and management of district-level energy flows. Cities consume 65% of the world’s energy supply and are responsible for 70% of the CO² emissions, hence sharing a lot of the responsibility for climate change. We are faced with the challenge of redesigning our existing cities to make them more sustainable, resilient, inclusive and safe. Developing Positive Energy Districts (PEDs), is a breakthrough way to deal with the issue of urban emissions and applying adaptation and mitigation strategies to climate change, while ensuring that these urban areas generate an annual surplus of renewable energy and net zero greenhouse gas emissions. PEDs must address environmental, economic and social issues, providing solutions to energy consumption, production, emissions, transport & mobility and livability. By constantly monitoring and evaluating parameters through existing and/or novel sensor systems (e.g., renewable energy production/supply, transport conditions, air quality, energy demand, meteorological conditions, etc.), unconventional techniques may be applied to provide more sustainable options for the district’s needs. | |||||
B1P002: Motivation behind PED/PED relevant project development | |||||||||
B1P002: Motivation behind PED/PED relevant project development | Refurbishment of social housing | Strategic, economic | Expected outcome 1 Increased number of (tangible) city planning actions for positive clean energy districts using the (proto-)PED design, development and management digital twin tools (based on pre-market research learnings) using open-standards based components which can be reused elsewhere. 2 Increased integration of existing smaller scale management systems (e.g. Building management systems) with open-standards based operational city platforms using sectorial data (e.g. building data, mobility, urban planning, etc.). 3 Enhanced data gathering approaches with identification of relevant multidimensional data sets (e.g. meteorological, load profile, social, geo-spatial, etc.) high-resolution real-time data streams (e.g. renewable energy production, energy consumption), and relevant forecasting data, drawing also on the work of common European data spaces. 4 Increased number of city planning departments / approaches using common data and (replicable) elements and processes. 5 Consolidated city sensor network specifications, complemented by appropriate data gathering approaches for soft data. 6 Improved performance of AI based self-learning systems for optimization of positive clean energy districts and bottom-up complex models. 7 Enhanced innovation capacity of local/regional administrations and accelerated uptake of shared, smart and sustainable zero emission solutions. | ||||||
B1P003: Environment of the case study area | |||||||||
B2P003: Environment of the case study area | Urban area | Urban area | Urban area | Suburban area | Urban area | Urban area | Urban area | ||
B1P004: Type of district | |||||||||
B2P004: Type of district |
|
|
|
|
|
| |||
B1P005: Case Study Context | |||||||||
B1P005: Case Study Context |
|
|
|
|
|
| |||
B1P006: Year of construction | |||||||||
B1P006: Year of construction | 1958 | ||||||||
B1P007: District population before intervention - Residential | |||||||||
B1P007: District population before intervention - Residential | 4500 | ||||||||
B1P008: District population after intervention - Residential | |||||||||
B1P008: District population after intervention - Residential | |||||||||
B1P009: District population before intervention - Non-residential | |||||||||
B1P009: District population before intervention - Non-residential | |||||||||
B1P010: District population after intervention - Non-residential | |||||||||
B1P010: District population after intervention - Non-residential | |||||||||
B1P011: Population density before intervention | |||||||||
B1P011: Population density before intervention | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
B1P012: Population density after intervention | |||||||||
B1P012: Population density after intervention | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
B1P013: Building and Land Use before intervention | |||||||||
B1P013: Residential | yes | no | yes | yes | yes | yes | no | no | no |
B1P013 - Residential: Specify the sqm [m²] | 64 787,57 | ||||||||
B1P013: Office | no | no | no | no | no | yes | no | no | no |
B1P013 - Office: Specify the sqm [m²] | |||||||||
B1P013: Industry and Utility | no | no | no | no | no | no | no | no | no |
B1P013 - Industry and Utility: Specify the sqm [m²] | |||||||||
B1P013: Commercial | yes | no | no | no | yes | no | no | no | no |
B1P013 - Commercial: Specify the sqm [m²] | 262,33 | ||||||||
B1P013: Institutional | no | no | no | no | no | no | no | no | no |
B1P013 - Institutional: Specify the sqm [m²] | |||||||||
B1P013: Natural areas | yes | no | no | no | no | no | no | no | no |
B1P013 - Natural areas: Specify the sqm [m²] | |||||||||
B1P013: Recreational | yes | no | no | no | no | yes | no | no | no |
B1P013 - Recreational: Specify the sqm [m²] | |||||||||
B1P013: Dismissed areas | no | no | no | no | no | no | no | no | no |
B1P013 - Dismissed areas: Specify the sqm [m²] | |||||||||
B1P013: Other | no | no | no | no | no | no | no | no | no |
B1P013 - Other: Specify the sqm [m²] | |||||||||
B1P014: Building and Land Use after intervention | |||||||||
B1P014: Residential | yes | no | yes | yes | no | yes | no | no | no |
B1P014 - Residential: Specify the sqm [m²] | |||||||||
B1P014: Office | no | no | no | no | no | yes | no | no | no |
B1P014 - Office: Specify the sqm [m²] | |||||||||
B1P014: Industry and Utility | no | no | no | no | no | no | no | no | no |
B1P014 - Industry and Utility: Specify the sqm [m²] | |||||||||
B1P014: Commercial | yes | no | no | no | no | no | no | no | no |
B1P014 - Commercial: Specify the sqm [m²] | |||||||||
B1P014: Institutional | no | no | no | no | yes | no | no | no | no |
B1P014 - Institutional: Specify the sqm [m²] | 35322.21 | ||||||||
B1P014: Natural areas | yes | no | no | no | no | no | no | no | no |
B1P014 - Natural areas: Specify the sqm [m²] | |||||||||
B1P014: Recreational | yes | no | no | no | no | yes | no | no | no |
B1P014 - Recreational: Specify the sqm [m²] | |||||||||
B1P014: Dismissed areas | no | no | no | no | no | no | no | no | no |
B1P014 - Dismissed areas: Specify the sqm [m²] | |||||||||
B1P014: Other | no | no | no | no | no | no | no | no | no |
B1P014 - Other: Specify the sqm [m²] | |||||||||
B2P001: PED Lab concept definition | |||||||||
B2P001: PED Lab concept definition | |||||||||
B2P002: Installation life time | |||||||||
B2P002: Installation life time | |||||||||
B2P003: Scale of action | |||||||||
B2P003: Scale | District | District | |||||||
B2P004: Operator of the installation | |||||||||
B2P004: Operator of the installation | |||||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||||||
B2P005: Replication framework: Applied strategy to reuse and recycling the materials | |||||||||
B2P006: Circular Economy Approach | |||||||||
B2P006: Do you apply any strategy to reuse and recycling the materials? | No | Yes | |||||||
B2P006: Other | |||||||||
B2P007: Motivation for developing the PED Lab | |||||||||
B2P007: Motivation for developing the PED Lab |
|
| |||||||
B2P007: Other | |||||||||
B2P008: Lead partner that manages the PED Lab | |||||||||
B2P008: Lead partner that manages the PED Lab | Municipality | Municipality | |||||||
B2P008: Other | |||||||||
B2P009: Collaborative partners that participate in the PED Lab | |||||||||
B2P009: Collaborative partners that participate in the PED Lab |
|
| |||||||
B2P009: Other | |||||||||
B2P010: Synergies between the fields of activities | |||||||||
B2P010: Synergies between the fields of activities | |||||||||
B2P011: Available facilities to test urban configurations in PED Lab | |||||||||
B2P011: Available facilities to test urban configurations in PED Lab |
|
| |||||||
B2P011: Other | |||||||||
B2P012: Incubation capacities of PED Lab | |||||||||
B2P012: Incubation capacities of PED Lab |
|
| |||||||
B2P013: Availability of the facilities for external people | |||||||||
B2P013: Availability of the facilities for external people | |||||||||
B2P014: Monitoring measures | |||||||||
B2P014: Monitoring measures |
|
| |||||||
B2P015: Key Performance indicators | |||||||||
B2P015: Key Performance indicators |
|
| |||||||
B2P016: Execution of operations | |||||||||
B2P016: Execution of operations | |||||||||
B2P017: Capacities | |||||||||
B2P017: Capacities | |||||||||
B2P018: Relations with stakeholders | |||||||||
B2P018: Relations with stakeholders | |||||||||
B2P019: Available tools | |||||||||
B2P019: Available tools |
| ||||||||
B2P019: Available tools | |||||||||
B2P020: External accessibility | |||||||||
B2P020: External accessibility | |||||||||
C1P001: Unlocking Factors | |||||||||
C1P001: Recent technological improvements for on-site RES production | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Energy Communities, P2P, Prosumers concepts | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important |
C1P001: Storage systems and E-mobility market penetration | 2 - Slightly important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Decreasing costs of innovative materials | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Financial mechanisms to reduce costs and maximize benefits | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: The ability to predict Multiple Benefits | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: The ability to predict the distribution of benefits and impacts | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up) | 4 - Important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Social acceptance (top-down) | 4 - Important | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 4 - Important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.) | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Presence of integrated urban strategies and plans | 5 - Very important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Multidisciplinary approaches available for systemic integration | 4 - Important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects | 5 - Very important | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P001: Availability of RES on site (Local RES) | 4 - Important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P001: Any other UNLOCKING FACTORS | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P001: Any other UNLOCKING FACTORS (if any) | Collaboration with the local partners | ||||||||
C1P002: Driving Factors | |||||||||
C1P002: Climate Change adaptation need | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P002: Climate Change mitigation need (local RES production and efficiency) | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Rapid urbanization trend and need of urban expansions | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Urban re-development of existing built environment | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Economic growth need | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.) | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Territorial and market attractiveness | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Energy autonomy/independence | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P002: Any other DRIVING FACTOR | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P002: Any other DRIVING FACTOR (if any) | |||||||||
C1P003: Administrative barriers | |||||||||
C1P003: Difficulty in the coordination of high number of partners and authorities | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P003: Lack of good cooperation and acceptance among partners | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P003: Lack of public participation | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P003: Lack of institutions/mechanisms to disseminate information | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003:Long and complex procedures for authorization of project activities | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Complicated and non-comprehensive public procurement | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Fragmented and or complex ownership structure | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: City administration & cross-sectoral attitude/approaches (silos) | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Lack of internal capacities to support energy transition | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Any other Administrative BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P003: Any other Administrative BARRIER (if any) | Fragmented financial support; lack of experimental budget for complex projects, etc. | ||||||||
C1P004: Policy barriers | |||||||||
C1P004: Lack of long-term and consistent energy plans and policies | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P004: Lacking or fragmented local political commitment and support on the long term | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P004: Lack of Cooperation & support between national-regional-local entities | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P004: Any other Political BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P004: Any other Political BARRIER (if any) | Different priorities; overall problematic system od decentralization powers; non-fuctioning model of local development funding, etc. | ||||||||
C1P005: Legal and Regulatory barriers | |||||||||
C1P005: Inadequate regulations for new technologies | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P005: Regulatory instability | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Non-effective regulations | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Unfavorable local regulations for innovative technologies | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P005: Building code and land-use planning hindering innovative technologies | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Insufficient or insecure financial incentives | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Shortage of proven and tested solutions and examples | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Any other Legal and Regulatory BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P005: Any other Legal and Regulatory BARRIER (if any) | |||||||||
C1P006: Environmental barriers | |||||||||
C1P006: Environmental barriers | |||||||||
C1P007: Technical barriers | |||||||||
C1P007: Lack of skilled and trained personnel | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P007: Deficient planning | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P007: Retrofitting work in dwellings in occupied state | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P007: Lack of well-defined process | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 4 - Important |
C1P007: Inaccuracy in energy modelling and simulation | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 1 - Unimportant |
C1P007: Lack/cost of computational scalability | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important |
C1P007: Grid congestion, grid instability | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P007: Negative effects of project intervention on the natural environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P007: Energy retrofitting work in dense and/or historical urban environment | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P007: Difficult definition of system boundaries | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P007: Any other Thecnical BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P007: Any other Thecnical BARRIER (if any) | Inadequate regulation towards energy transition | ||||||||
C1P008: Social and Cultural barriers | |||||||||
C1P008: Inertia | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Lack of values and interest in energy optimization measurements | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Low acceptance of new projects and technologies | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 5 - Very important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P008: Difficulty of finding and engaging relevant actors | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Lack of trust beyond social network | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Rebound effect | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Hostile or passive attitude towards environmentalism | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Exclusion of socially disadvantaged groups | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Non-energy issues are more important and urgent for actors | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Hostile or passive attitude towards energy collaboration | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Any other Social BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P008: Any other Social BARRIER (if any) | |||||||||
C1P009: Information and Awareness barriers | |||||||||
C1P009: Insufficient information on the part of potential users and consumers | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 4 - Important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: Lack of awareness among authorities | 2 - Slightly important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: Information asymmetry causing power asymmetry of established actors | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 2 - Slightly important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: High costs of design, material, construction, and installation | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: Any other Information and Awareness BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P009: Any other Information and Awareness BARRIER (if any) | |||||||||
C1P010: Financial barriers | |||||||||
C1P010: Hidden costs | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 4 - Important | 1 - Unimportant | 5 - Very important | 4 - Important |
C1P010: Insufficient external financial support and funding for project activities | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Economic crisis | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Risk and uncertainty | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Lack of consolidated and tested business models | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 4 - Important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Limited access to capital and cost disincentives | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Any other Financial BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P010: Any other Financial BARRIER (if any) | |||||||||
C1P011: Market barriers | |||||||||
C1P011: Split incentives | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P011: Energy price distortion | 3 - Moderately important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 5 - Very important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P011: Energy market concentration, gatekeeper actors (DSOs) | 4 - Important | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 3 - Moderately important | 5 - Very important | 1 - Unimportant | 5 - Very important | 5 - Very important |
C1P011: Any other Market BARRIER | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 1 - Unimportant | 5 - Very important | 3 - Moderately important |
C1P011: Any other Market BARRIER (if any) | |||||||||
C1P012: Stakeholders involved | |||||||||
C1P012: Government/Public Authorities |
|
|
|
|
| ||||
C1P012: Research & Innovation |
|
|
|
|
| ||||
C1P012: Financial/Funding |
|
|
|
| |||||
C1P012: Analyst, ICT and Big Data |
|
|
|
| |||||
C1P012: Business process management |
|
|
|
| |||||
C1P012: Urban Services providers |
|
|
|
| |||||
C1P012: Real Estate developers |
|
|
|
| |||||
C1P012: Design/Construction companies |
|
|
|
| |||||
C1P012: End‐users/Occupants/Energy Citizens |
|
|
|
|
| ||||
C1P012: Social/Civil Society/NGOs |
|
|
|
| |||||
C1P012: Industry/SME/eCommerce |
|
|
|
| |||||
C1P012: Other |
| ||||||||
C1P012: Other (if any) | |||||||||
Summary |
Authors (framework concept)
Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)
Contributors (to the content)
Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)
Implemented by
Boutik.pt: Filipe Martins, Jamal Khan
Marek Suchánek (Czech Technical University in Prague)