Filters:
NameProjectTypeCompare
Örebro-Vivalla JUST PEPP PED Relevant Case Study Compare
Tiurberget, Kongsvinger JUST PEPP PED Relevant Case Study Compare
Texel JUST PEPP PED Relevant Case Study Compare
Hällefors, Sweden JUST PEPP PED Relevant Case Study Compare
Cerdanyola del Valles, School of Engineering, Campus Universitat Autonoma de Barcelona OPEN4CEC PED Lab Compare
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab OPEN4CEC PED Lab Uncompare
Pamplona OPEN4CEC PED Lab Uncompare
Trondheim, Svartlamon OPEN4CEC PED Lab Uncompare
Savona, The University of Genova, Savona Campus OPEN4CEC PED Lab Compare
Torres Vedras, Encosta de São Vicente COPPER PED Lab Compare
Malmö, Stadium area (Stadionområdet) PED StepWise PED Case Study Compare
Utrecht, Utrecht Science Park PED StepWise PED Relevant Case Study Compare
Vienna, Kriegerheimstätten PED StepWise PED Relevant Case Study Compare
Vienna, 16. District, Leben am Wilhelminenberg HeatCOOP PED Relevant Case Study Compare
Vienna, Laxenburgerstraße AH HeatCOOP PED Lab Compare
Tartu, Annelinn V2G-QUESTS PED Relevant Case Study Compare
Utrecht, Kanaleneiland V2G-QUESTS PED Relevant Case Study Uncompare
Aveiro, Aradas district V2G-QUESTS PED Relevant Case Study Compare
Győr Geothermal District Heating Project PED Relevant Case Study Uncompare
Jacobs Borchs Gate, Drammen PED Relevant Case Study Compare
Dietenbach, Freiburg im Breisgau PED Relevant Case Study Compare
Lecce, SmartEnCity SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study Compare
STARDUST, Trento STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study / PED Lab Compare
Klimatkontrakt Hyllie, Malmö PED Relevant Case Study Compare
EnStadt:Pfaff, Kaiserslautern PED Relevant Case Study / PED Lab Compare
mySMARTlife, Helsinki PED Relevant Case Study Compare
Firenze, Novoli-Cascine district on “le PIagge” buildings PED Relevant Case Study Compare
Sinfonia, Bolzano PED Relevant Case Study Compare
Hunziker Areal, Zürich PED Relevant Case Study Compare
Hammarby Sjöstad 2.0, PED Relevant Case Study Compare
Sharing Cities, Milano PED Relevant Case Study Compare
District Heating Pozo Barredo, Mieres PED Relevant Case Study Compare
Cityfied (demo Linero), Lund PED Relevant Case Study Compare
Smart Otaniemi, Espoo PED Relevant Case Study / PED Lab Compare
Zukunftsquartier, Vienna PED Case Study Compare
Santa Chiara Open Lab, Trento PED Case Study Compare
Barrio La Pinada, Paterna PED Case Study / PED Lab Compare
Zero Village Bergen (ZVB) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Võru +CityxChange PED Case Study Compare
NTNU Campus within the Knowledge Axis, Trondheim ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Furuset project, Oslo ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Laser Valley – Land of Lights PED Case Study Compare
Ydalir project ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
NyBy – Ny Flyplass (New City – New Airport) ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fornebu, Bærum ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Case Study Compare
Fleuraye west, Carquefou PED Case Study Compare
Smart Energy Åland PED Case Study Compare
Romania, Alba Iulia PED ASCEND – Accelerate poSitive Clean ENergy Districts PED Case Study Compare
Romania, Alba Iulia PED InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Compare
Munich, Harthof district PED Case Study Compare
Lublin MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Roubaix, MustBe0 – Résidence Philippe le Hardi – 125 Rue d’Oran CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Uncompare
Bærum, Eiksveien 116 CULTURAL-E – Climate and cultural-based solutions for Plus Energy Buildings PED Relevant Case Study Compare
Findhorn, the Park InterPED – INTERoperable cloud-based solution for cross-vector planning and management of Positive Energy Districts PED Case Study Compare
Amsterdam, Buiksloterham PED ATELIER – AmsTErdam BiLbao cItizen drivEn smaRt cities PED Case Study Compare
Schönbühel-Aggsbach, Schönbühel an der Donau PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Compare
Umeå, Ålidhem district PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Aalborg East PED Relevant Case Study / PED Lab Compare
Ankara, Çamlık District PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study / PED Relevant Case Study Compare
Trenčín MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Luxembourg, Betzdorf LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Vantaa, Aviapolis NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Vidin, Himik and Bononia MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Oslo, Verksbyen Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Uden, Loopkantstraat Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Relevant Case Study Compare
Zaragoza, Actur NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Relevant Case Study Compare
Aarhus, Brabrand BIPED – Building Intelligent Positive Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Riga, Ķīpsala, RTU smart student city ExPEDite – Enabling Positive Energy Districts through Digital Twins PED Case Study Compare
Izmir, District of Karşıyaka PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Istanbul, Ozyegin University Campus LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Uncompare
Espoo, Kera SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study / PED Relevant Case Study Compare
Borlänge, Rymdgatan’s Residential Portfolio PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Compare
Freiburg, Waldsee PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district PED Case Study Compare
Innsbruck, Campagne-Areal PED Relevant Case Study Compare
Graz, Reininghausgründe PED Case Study Uncompare
Stor-Elvdal, Campus Evenstad ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Relevant Case Study Compare
Oulu, Kaukovainio MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Halmstad, Fyllinge PED Relevant Case Study Compare
Lund, Brunnshög district PED Case Study Compare
Vienna, Am Kempelenpark PED Case Study Compare
Évora, Portugal POCITYF – A POsitive Energy CITY Transformation Framework PED Relevant Case Study / PED Lab Compare
Kladno, Sletiště (Sport Area), PED Winter Stadium SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study Compare
Groningen, PED South MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Groningen, PED North MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Maia, Sobreiro Social Housing SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Lab Compare
Lubia (Soria), CEDER-CIEMAT PED Lab Compare
Tampere, Ilokkaanpuisto district STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study Compare
Leon, Former Sugar Factory district MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Istanbul, Kadikoy district, Caferaga MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Espoo, Leppävaara district, Sello center SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Espoo, Espoonlahti district, Lippulaiva block SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Salzburg, Gneis district Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Barcelona, Santa Coloma de Gramenet Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Tartu, City centre area SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study / PED Lab Compare
Bologna, Pilastro-Roveri district GRETA – GReen Energy Transition Actions PED Relevant Case Study Compare
Barcelona, SEILAB & Energy SmartLab PED Lab Compare
Leipzig, Baumwollspinnerei district SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Kifissia, Energy community SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study
TitleKifissia, Energy community
Trondheim, Svartlamon
Istanbul, Ozyegin University Campus
Győr, Geothermal District Heating Project
Graz, Reininghausgründe
Utrecht, Kanaleneiland
Bucharest, The Bucharest University of Economic Studies (ASE) PED Lab
Roubaix, MustBe0 - Résidence Philippe le Hardi – 125 Rue d’Oran
Pamplona
A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED LabKifissia, Energy communityTrondheim, SvartlamonIstanbul, Ozyegin University CampusGyőr, Geothermal District Heating ProjectGraz, ReininghausgründeUtrecht, KanaleneilandBucharest, The Bucharest University of Economic Studies (ASE) PED LabRoubaix, MustBe0 - Résidence Philippe le Hardi – 125 Rue d’OranPamplona
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P003: Categorisation of the PED site
PED case studynonononoyesnononono
PED relevant case studyyesnoyesyesnoyesnoyesno
PED Lab.noyesnonononoyesnoyes
A1P004: Targets of the PED case study / PED Lab
Climate neutralitynoyesyesyesyesyesyesyesyes
Annual energy surplusnononononononoyesno
Energy communityyesyesnononoyesnonoyes
Circularitynonononononononono
Air quality and urban comfortyesnoyesnonononoyesno
Electrificationyesnoyesnonoyesnonono
Net-zero energy costnonononononononono
Net-zero emissionnonononononononono
Self-sufficiency (energy autonomous)nonononononononono
Maximise self-sufficiencynonononononononono
Othernonoyesyesnonoyesnono
Other (A1P004)almost nZEB districtEnergy efficient; Carbon-freeSmart Buildings
A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED LabPlanning PhasePlanning PhaseImplementation PhaseCompletedImplementation PhasePlanning PhasePlanning PhaseCompletedImplementation Phase
A1P006: Start Date
A1P006: Start date11/2410/2412/13201911/2303/2501/2206/24
A1P007: End Date
A1P007: End date03/2610/2810/18202511/2612/2701/2407/28
A1P008: Reference Project
A1P008: Reference Project
A1P009: Data availability
A1P009: Data availability
  • General statistical datasets
  • GIS open datasets
A1P009: Other
A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
        • E. Rainer, H. Schnitzer, T. Mach, T. Wieland, M. Reiter, L. Fickert, E. Schmautzer, A. Passer, H. Oblak, H. Kreiner, R. Lazar, M. Duschek, et al. (2015): Rahmenplan Energy City Graz-Reininghaus – Subprojekt 2 des Leitprojektes „ECR Energy City Graz – Reininghaus Online: Rahmenplan Energy City Graz-Reininghaus - Haus der Zukunft (nachhaltigwirtschaften.at),
        • H.Schnitzer et al. (2016): Arbeiten und Wohnen in der Smart City Reininghaus, Online: Arbeiten und Wohnen in Graz Reininghaus - Smartcities
                A1P011: Geographic coordinates
                X Coordinate (longitude):23.81458810.4229.25830017.86812415.4074405.087526.097394325914983.1651-1.64323
                Y Coordinate (latitude):38.07734963.436341.03060047.65145247.060752.065344.4472496751992950.693742.81687
                A1P012: Country
                A1P012: CountryGreeceNorwayTurkeyHungaryAustriaNetherlandsRomaniaFranceSpain
                A1P013: City
                A1P013: CityMunicipality of KifissiaTrondheimIstanbulGyőrGrazUtrecht (Kanaleneiland)BucharestRoubaixPamplona
                A1P014: Climate Zone (Köppen Geiger classification)
                A1P014: Climate Zone (Köppen Geiger classification).CsaCfbCfaCfbDfbCfbCsaCfbCfb
                A1P015: District boundary
                A1P015: District boundaryVirtualVirtualGeographicGeographicGeographicGeographicOtherGeographic
                OtherThe energy will be produced by a PV plant installed on the terrace of a municipal building. Members of the energy community (that is under formation) will benefit from the energy produced via virtual net metering. PV instalment and the buildings (owned by the members of the community) will be within the boundaries of the Municipality but not necessary in the same area/district/neighbourhoodPEB
                A1P016: Ownership of the case study/PED Lab
                A1P016: Ownership of the case study/PED Lab:PrivatePrivateMixedMixedPrivatePublicPrivateMixed
                A1P017: Ownership of the land / physical infrastructure
                A1P017: Ownership of the land / physical infrastructure:Multiple OwnersSingle OwnerMultiple OwnersMultiple OwnersMultiple OwnersSingle OwnerSingle OwnerMultiple Owners
                A1P018: Number of buildings in PED
                A1P018: Number of buildings in PED151001
                A1P019: Conditioned space
                A1P019: Conditioned space [m²]1442
                A1P020: Total ground area
                A1P020: Total ground area [m²]3200285.40010000002910000485250023550000
                A1P021: Floor area ratio: Conditioned space / total ground area
                A1P021: Floor area ratio: Conditioned space / total ground area000000010
                A1P022: Financial schemes
                A1P022a: Financing - PRIVATE - Real estatenonoyesnoyesnonoyesno
                A1P022a: Add the value in EUR if available [EUR]0
                A1P022b: Financing - PRIVATE - ESCO schemenonononononononono
                A1P022b: Add the value in EUR if available [EUR]
                A1P022c: Financing - PRIVATE - Othernonononononononono
                A1P022c: Add the value in EUR if available [EUR]
                A1P022d: Financing - PUBLIC - EU structural fundingnononoyesnonononono
                A1P022d: Add the value in EUR if available [EUR]
                A1P022e: Financing - PUBLIC - National fundingnoyesnonoyesyesnonono
                A1P022e: Add the value in EUR if available [EUR]
                A1P022f: Financing - PUBLIC - Regional fundingnononononononoyesno
                A1P022f: Add the value in EUR if available [EUR]
                A1P022g: Financing - PUBLIC - Municipal fundingnonononoyesnonoyesyes
                A1P022g: Add the value in EUR if available [EUR]
                A1P022h: Financing - PUBLIC - Othernonononononoyesnono
                A1P022h: Add the value in EUR if available [EUR]
                A1P022i: Financing - RESEARCH FUNDING - EUnonoyesnonononoyesno
                A1P022i: Add the value in EUR if available [EUR]
                A1P022j: Financing - RESEARCH FUNDING - Nationalnonononononononono
                A1P022j: Add the value in EUR if available [EUR]
                A1P022k: Financing - RESEARCH FUNDING - Local/regionalnonononononononono
                A1P022k: Add the value in EUR if available [EUR]
                A1P022l: Financing - RESEARCH FUNDING - Othernonononononononono
                A1P022l: Add the value in EUR if available [EUR]
                A1P022: OtherRetrofitted through various subsidies
                A1P023: Economic Targets
                A1P023: Economic Targets
                • Positive externalities,
                • Boosting local and sustainable production,
                • Boosting consumption of local and sustainable products
                • Job creation,
                • Boosting local businesses,
                • Boosting consumption of local and sustainable products
                A1P023: Other
                A1P024: More comments:
                A1P024: More comments:In addition to having the most energy efficient academic building in Turkey, the university campus also has 3 buildings with LEED NC Campus certificate and LEED BD+C Gold certificate. In addition, it aims to continuously improve the energy efficiency objectives on campus in an innovative way. For this purpose, energy management and storage systems are being installed in the Dormitory 6 building, which is used as the demo area of the LEGOFIT project, for the purpose of turning it into a PED project.The “Reininghausgründe” are a new quarter near the centre of the City of Graz. In the area of a former brewery, close to more, still working industries, a new town centre is being established. It will include living areas, workplaces, shops, schools and a park, so that the need for individual mobility is minimized. It is connected to the city centre by bike paths, busses and a tram. Car sharing is provided as well. Some key-energy aspects: • characteristic 1: For the heat supply in the innovative Reininghaus energy model, low-temperature waste heat from a nearby steel plant is harnessed through the use of heat pumps. • characteristic 2: The district heating system operates at low temperatures. • characteristic 3: Generated heat that is not used immediately is stored in the power tower and supplied on demand. Other important aspects of the project are the following: • characteristic 1: Most houses are low-energy houses, some of the certified with the “Klima Aktiv” label • characteristic 2: There are extremely few parking possibilities for residents and visitors; this will foster the use of public transport and bikes • characteristic 3: All the necessary infrastructure for the “daily need” can be reached within walking distance The area of the project is going to be very “green” when finished. Featuring a big district parc, lots of other green spaces are in planning.The building comprises 32 homes. The refurbishment complies with EnergieSprong specifications. This implies a performance of E=0 over 25 years.
                A1P025: Estimated PED case study / PED LAB costs
                A1P025: Estimated PED case study / PED LAB costs [mil. EUR]0.0213.6
                Contact person for general enquiries
                A1P026: NameArtemis Giavasoglou, Kleopatra KalampokaTatiana González Grandón; Raymundo E. Torres-OlguinCem KeskinChristoph GollnerKatharina SchwarzDr. Gonçalo Homem De Almeida Rodriguez CorreiaAdela BaraJulien HolgardOscar Puyal LAtorre
                A1P027: OrganizationMunicipality of Kifissia – SPARCS local teamNTNUCenter for Energy, Environment and Economy, Ozyegin UniversityFFGStadtLABOR, Innovationen für urbane Lebensqualität GmbHDelft University of TechnologyThe Bucharest University of Economic StudiesVilogiaEndef Engineering SL
                A1P028: AffiliationMunicipality / Public BodiesResearch Center / UniversityResearch Center / UniversityOtherSME / IndustryResearch Center / UniversityResearch Center / UniversityOtherSME / Industry
                A1P028: OtherSocial Housing Company
                A1P029: Emailgiavasoglou@kifissia.grtatiana.c.g.grandon@ntnu.nocem.keskin@ozyegin.edu.trchristoph.gollner@ffg.atkatharina.schwarz@stadtlaborgraz.atg.correia@tudelft.nlBara.adela@ie.ase.rojulien.holgard@vilogia.froscar.puyal@endef.com
                Contact person for other special topics
                A1P030: NameStavros Zapantis - vice mayorRaymundo E. Torres-OlguinM. Pınar MengüçHans SchnitzerQiaochu FanJulien Holgard
                A1P031: Emailstavros.zapantis@gmail.comraymundo.torres-olguin@sintef.nopinar.menguc@ozyegin.edu.trhans.schnitzer@stadtlaborgraz.atq.fan-1@tudelft.nljulien.holgard@vilogia.fr
                Pursuant to the General Data Protection RegulationYesYesYesYesYesYesYesYes
                A2P001: Fields of application
                A2P001: Fields of application
                • Energy production
                • Energy flexibility,
                • Digital technologies
                • Energy efficiency,
                • Energy flexibility,
                • Energy production,
                • E-mobility,
                • Digital technologies,
                • Waste management,
                • Indoor air quality,
                • Construction materials
                • Energy efficiency,
                • Energy production
                • Energy efficiency,
                • Urban comfort (pollution, heat island, noise level etc.),
                • Water use,
                • Indoor air quality,
                • Other
                • Energy efficiency,
                • Energy flexibility,
                • E-mobility,
                • Urban comfort (pollution, heat island, noise level etc.),
                • Digital technologies
                • Energy efficiency,
                • Energy flexibility,
                • Digital technologies,
                • Indoor air quality
                • Energy efficiency,
                • Energy production,
                • Urban comfort (pollution, heat island, noise level etc.),
                • Indoor air quality,
                • Construction materials
                • Energy efficiency
                A2P001: OtherUrban Management; Air Quality
                A2P002: Tools/strategies/methods applied for each of the above-selected fields
                A2P002: Tools/strategies/methods applied for each of the above-selected fieldsLEED NC Campus + LEGOFIT Project Energy Efficiency: Tri- generation, Compliance with ISO 50001, ASHRAE 90.1, energy efficient appliances, HVAC and lighting Energy flexibility: Energy demand management Energy production: Solar PVs Onsite + (to be installed more) E-mobility: EV Charging stations Indoor Air Quality: Energy Management System, Compliance with ASHRAE 62.1, ASHRAE 55 Construction materials: Passive systems, LEED certified buildings, innovative materials such as PCM Waste Management: Zero waste documentEnergy efficiency: o Several activities: Workshops, Webinars to deepen the knowledge and raise awareness renewable energies o for example rooftop Photovoltaics green & blue infrastructures o Parks, Rooftop Gardens, Quarter Parks, Water elements included in the parks rooftop farming o To produce vegetables in the quarter stormwater management mobility o less parking and less cars in the district. Solutions for boosting public transport with sponsored public transport tickets; building of better bike and pedestrian infrastructure social aspects o district management was established in the district local supply of goods of daily need o Schools within 15 minutes walking distance Supermarkets and other shops within the district
                A2P003: Application of ISO52000
                A2P003: Application of ISO52000YesNoNo
                A2P004: Appliances included in the calculation of the energy balance
                A2P004: Appliances included in the calculation of the energy balanceYesYesYes
                A2P005: Mobility included in the calculation of the energy balance
                A2P005: Mobility included in the calculation of the energy balanceNoYesNo
                A2P006: Description of how mobility is included (or not included) in the calculation
                A2P006: Description of how mobility is included (or not included) in the calculationNot included, the campus is a non car area except emergencies- Number of cars per household - Fraction of electric cars - Number of public transport tickets (week/ annual tickets)
                A2P007: Annual energy demand in buildings / Thermal demand
                A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum]14
                A2P008: Annual energy demand in buildings / Electric Demand
                A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum]90
                A2P009: Annual energy demand for e-mobility
                A2P009: Annual energy demand for e-mobility [GWh/annum]0
                A2P010: Annual energy demand for urban infrastructure
                A2P010: Annual energy demand for urban infrastructure [GWh/annum]9
                A2P011: Annual renewable electricity production on-site during target year
                A2P011: PVyesnoyesnoyesnonoyesno
                A2P011: PV - specify production in GWh/annum [GWh/annum]
                A2P011: Windnonononononononono
                A2P011: Wind - specify production in GWh/annum [GWh/annum]
                A2P011: Hydrononononononononono
                A2P011: Hydro - specify production in GWh/annum [GWh/annum]
                A2P011: Biomass_elnonononononononono
                A2P011: Biomass_el - specify production in GWh/annum [GWh/annum]
                A2P011: Biomass_peat_elnonononononononono
                A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum]
                A2P011: PVT_elnonononononononono
                A2P011: PVT_el - specify production in GWh/annum [GWh/annum]
                A2P011: Othernonononononononono
                A2P011: Other - specify production in GWh/annum [GWh/annum]
                A2P012: Annual renewable thermal production on-site during target year
                A2P012: Geothermalnonononoyesnononono
                A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum]
                A2P012: Solar Thermalnonononoyesnononono
                A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum]
                A2P012: Biomass_heatnonononononononono
                A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum]
                A2P012: Waste heat+HPnonononoyesnononono
                A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum]
                A2P012: Biomass_peat_heatnonononononononono
                A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum]
                A2P012: PVT_thnonononononononono
                A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum]
                A2P012: Biomass_firewood_thnonononononononono
                A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum]
                A2P012: Othernonononononononono
                A2P012 - Other: Please specify production in GWh/annum [GWh/annum]
                A2P013: Renewable resources on-site - Additional notes
                A2P013: Renewable resources on-site - Additional notesGroundwater (used for heat pumps)
                A2P014: Annual energy use
                A2P014: Annual energy use [GWh/annum]3.50.084
                A2P015: Annual energy delivered
                A2P015: Annual energy delivered [GWh/annum]0.11
                A2P016: Annual non-renewable electricity production on-site during target year
                A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum]0
                A2P017: Annual non-renewable thermal production on-site during target year
                A2P017: Gasnonononononononono
                A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum]
                A2P017: Coalnonononononononono
                A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum]
                A2P017: Oilnonononononononono
                A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum]
                A2P017: Othernonononononononono
                A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum]
                A2P018: Annual renewable electricity imports from outside the boundary during target year
                A2P018: PVnonoyesnoyesnononono
                A2P018 - PV: specify production in GWh/annum if available [GWh/annum]0.00045547
                A2P018: Windnonononoyesnononono
                A2P018 - Wind: specify production in GWh/annum if available [GWh/annum]
                A2P018: Hydrononononoyesnononono
                A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum]
                A2P018: Biomass_elnonononononononono
                A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum]
                A2P018: Biomass_peat_elnonononononononono
                A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum]
                A2P018: PVT_elnonononononononono
                A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum]
                A2P018: Othernonononononononono
                A2P018 - Other: specify production in GWh/annum if available [GWh/annum]
                A2P019: Annual renewable thermal imports from outside the boundary during target year
                A2P019: Geothermalnonononononononono
                A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Solar Thermalnonononoyesnononono
                A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Biomass_heatnonononoyesnononono
                A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Waste heat+HPnonononoyesnononono
                A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Biomass_peat_heatnonononononononono
                A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum]
                A2P019: PVT_thnonononononononono
                A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Biomass_firewood_thnonononononononono
                A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum]
                A2P019: Othernonononononononono
                A2P019 Other: Please specify imports in GWh/annum [GWh/annum]
                A2P020: Share of RES on-site / RES outside the boundary
                A2P020: Share of RES on-site / RES outside the boundary000000000
                A2P021: GHG-balance calculated for the PED
                A2P021: GHG-balance calculated for the PED [tCO2/annum]0.036
                A2P022: KPIs related to the PED case study / PED Lab
                A2P022: Safety & Security
                A2P022: Health
                A2P022: Education
                A2P022: MobilityxImproved accessibility to V2G-related transport options, focusing on inclusivity and equitable adoption in urban districts
                A2P022: EnergyYesxTarget zero greenhouse gas emissions through the adoption of EVs with V2G capabilities, aiming to reduce reliance on fossil fuels and enhance local grid stabilityYes
                A2P022: Waterx
                A2P022: Economic developmentxDevelopment of viable business models for V2G that allow decentralized energy markets to integrate with the grid, enhancing local economic resilience
                A2P022: Housing and CommunityxNumber of people interested in participating in an energy community
                A2P022: Waste
                A2P022: Other
                A2P023: Technological Solutions / Innovations - Energy Generation
                A2P023: Photovoltaicsnoyesyesnoyesyesnoyesyes
                A2P023: Solar thermal collectorsnononoyesnonononono
                A2P023: Wind Turbinesnonoyesnonoyesnonono
                A2P023: Geothermal energy systemnononoyesnonononono
                A2P023: Waste heat recoverynonononoyesnononono
                A2P023: Waste to energynonononononononono
                A2P023: Polygenerationnonononononononono
                A2P023: Co-generationnonoyesnononononono
                A2P023: Heat Pumpnonoyesnoyesnononono
                A2P023: Hydrogennonononononononono
                A2P023: Hydropower plantnonononononononono
                A2P023: Biomassnonononononononono
                A2P023: Biogasnonononononononono
                A2P023: OtherBatteriesPhotovoltaics are considered for the next years
                A2P024: Technological Solutions / Innovations - Energy Flexibility
                A2P024: A2P024: Information and Communication Technologies (ICT)noyesyesnoyesnoyesnono
                A2P024: Energy management systemnoyesyesnonoyesyesnono
                A2P024: Demand-side managementnonoyesnononoyesnono
                A2P024: Smart electricity gridnononononoyesnonono
                A2P024: Thermal Storagenonononoyesnononono
                A2P024: Electric Storagenonoyesnonoyesnonono
                A2P024: District Heating and Coolingnonoyesyesyesnononono
                A2P024: Smart metering and demand-responsive control systemsnonoyesnonononoyesyes
                A2P024: P2P – buildingsnoyesnonononononono
                A2P024: Other
                A2P025: Technological Solutions / Innovations - Energy Efficiency
                A2P025: Deep Retrofittingnononononoyesyesyesno
                A2P025: Energy efficiency measures in historic buildingsnonononononoyesnono
                A2P025: High-performance new buildingsnonoyesnoyesnononono
                A2P025: Smart Public infrastructure (e.g. smart lighting)noyesnonoyesyesnonono
                A2P025: Urban data platformsnoyesnononoyesnonono
                A2P025: Mobile applications for citizensnonononoyesnononono
                A2P025: Building services (HVAC & Lighting)nonoyesnononoyesnono
                A2P025: Smart irrigationnonoyesnoyesnononono
                A2P025: Digital tracking for waste disposalnonononononononono
                A2P025: Smart surveillancenonoyesnononoyesnoyes
                A2P025: Other
                A2P026: Technological Solutions / Innovations - Mobility
                A2P026: Efficiency of vehicles (public and/or private)nonononoyesyesnonono
                A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances)nonononoyesyesnonono
                A2P026: e-Mobilitynonoyesnoyesyesnonono
                A2P026: Soft mobility infrastructures and last mile solutionsnonoyesnoyesnononono
                A2P026: Car-free areanonoyesnoyesnononono
                A2P026: Other
                A2P027: Mobility strategies - Additional notes
                A2P027: Mobility strategies - Additional notes- Multimodal mobility nodes - Support of public transport tickets - Mobility consulting - District management
                A2P028: Energy efficiency certificates
                A2P028: Energy efficiency certificatesYesYesNo
                A2P028: If yes, please specify and/or enter notesEnergy Performance Certificate - in Greece it is mandatory in order to buy or rent a house or a dwellingEnergieausweis mandatory if buildings/ flats/ apartments are sold
                A2P029: Any other building / district certificates
                A2P029: Any other building / district certificatesYesYesNo
                A2P029: If yes, please specify and/or enter notesLEED BD+C, LEED NC CAMPUSKlimaaktiv standard  Voluntary! Certification can be for buildings and/or quarters. The different quarters are built in different standards. Ranging from bronze/silver/gold
                A3P001: Relevant city /national strategy
                A3P001: Relevant city /national strategy
                • Energy master planning (SECAP, etc.),
                • Promotion of energy communities (REC/CEC)
                • Smart cities strategies,
                • Energy master planning (SECAP, etc.),
                • Climate change adaption plan/strategy (e.g. Climate City contract),
                • National / international city networks addressing sustainable urban development and climate neutrality
                • Smart cities strategies,
                • Energy master planning (SECAP, etc.),
                • Climate change adaption plan/strategy (e.g. Climate City contract),
                • National / international city networks addressing sustainable urban development and climate neutrality
                • Climate change adaption plan/strategy (e.g. Climate City contract)
                A3P002: Quantitative targets included in the city / national strategy
                A3P002: Quantitative targets included in the city / national strategyCity level targets Klimaschutzplan Graz - 2022 | Targets: - Climate neutrality until 2040 - Social justice and high quality of life - High innovation levels Mobilitätsplan Graz 2040 – under development | Targets: - Modal Split 80:20 until 2040 80% Public transport, bike, walking | 20% cars Kommunales Energiekonzept (2017) | Targets: - Increase of district heating Energiemasterplan Graz (2018) | Targets: - Energy efficiency of urban dwellings and infrastructures - District heating and solar energy - Energy efficiency of private dwellings - Climate conscious mobility National level targets Klimaschutzplan Österreich -draft, expected by 2024 | Targets: - Decarbonisation (reduction of GHG, renewable energies, - Climate neutrality until 2040 - Energy efficiency - Security of energy supply
                A3P003: Strategies towards decarbonization of the gas grid
                A3P003: Strategies towards decarbonization of the gas grid
                • Electrification of Heating System based on Heat Pumps,
                • Electrification of Cooking Methods
                • Electrification of Heating System based on Heat Pumps,
                • Electrification of Cooking Methods,
                • Biogas
                • Electrification of Heating System based on Heat Pumps
                A3P003: OtherBoiler Automation, Energy Management System, Electric Battery Storage, Demand Management and Flexible Pricing
                A3P004: Identification of needs and priorities
                A3P004: Identification of needs and prioritiesCarbon and Energy NeutralityReininghaus needs green spaces and places Sector coupling of water, waste water, electricity ICT and demand side management Mobility - Reininghaus needs better infrastructure for bikes and pedestrians - Public transportation should be more affordable and Sharing should be implemented in the district Infrastructure should cover daily needs within walking distance Infrastructure for local jobs and shared offices
                A3P005: Sustainable behaviour
                A3P005: Sustainable behaviourUnder LEGOFIT project, promoting sustainable behavior for better occupant experience is a targeted aim under a work package.- citizen participation and promotion of functioning neighbourhoods (e.g., through city district management) As of today, solutions for the energy transition in the residential sector have focused on the construction of energy-efficient buildings and on the energy-efficient refurbishment of existing buildings. Measures to influence user behaviour and to directly address residents and neighbourhoods as actors of the energy transition play a minor role and are also not formalized. At the same time, moving into a new apartment offers a ‘window of opportunity’ to establish new everyday practices and behaviour. In already inhabited housing developments, well-functioning neighbourhoods or existing, ‘sustainability pioneers’ are key to motivating people to adopt more resource-efficient lifestyles. In order to prepare such agents of change towards more climate protection and sustainability in the context of housing, Austria launched the BAREWO project. The aim is to develop a kit of formats, methods, and interventions for resource-efficient housing. This toolkit will be tested in six testbeds, among which quarter 12 (Q12) of Graz- Reininghaus, as soon as first residents move in (approx. 2024). Austrian TRANS-PED partner StadtLABOR, which is also a partner in the BAREWO project, will support Q12 in this process. In parallel, a monitoring system will be developed to make the (climate) effects of the kit measurable. In addition, a guideline for property managers will be developed, which will serve as an orientation for them on how their residents can be coached in matters of climate protection and sustainability in everyday (residential) life. From the very beginning, (communication) measures are implemented and relevant stakeholders are involved in the project (project advisory board) to ensure the multiplicability, financing and broad application of the toolkit. If successful, the toolkit could also be scaled up to other quarters in Reininghaus.
                A3P006: Economic strategies
                A3P006: Economic strategies
                • Local trading,
                • Existing incentives
                • PPP models,
                • Local trading
                • Innovative business models,
                • Local trading,
                • Existing incentives
                • Innovative business models,
                • Demand management Living Lab
                A3P006: Other
                A3P007: Social models
                A3P007: Social models
                • Co-creation / Citizen engagement strategies
                • Strategies towards (local) community-building,
                • Co-creation / Citizen engagement strategies,
                • Behavioural Change / End-users engagement,
                • Social incentives,
                • Quality of Life,
                • Affordability,
                • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
                • Strategies towards (local) community-building,
                • Co-creation / Citizen engagement strategies,
                • Behavioural Change / End-users engagement,
                • Social incentives,
                • Prevention of energy poverty,
                • Digital Inclusion
                • Digital Inclusion,
                • Citizen/owner involvement in planning and maintenance,
                • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
                • Behavioural Change / End-users engagement,
                • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
                • Co-creation / Citizen engagement strategies
                A3P007: Other
                A3P008: Integrated urban strategies
                A3P008: Integrated urban strategies
                • City Vision 2050,
                • SECAP Updates,
                • Building / district Certification
                • Strategic urban planning,
                • City Vision 2050,
                • Building / district Certification
                • Strategic urban planning,
                • District Energy plans
                • Digital twinning and visual 3D models
                A3P008: Other
                A3P009: Environmental strategies
                A3P009: Environmental strategies
                • Low Emission Zone
                • Energy Neutral,
                • Low Emission Zone,
                • Net zero carbon footprint,
                • Greening strategies,
                • Cool Materials
                • Energy Neutral,
                • Carbon-free
                • Pollutants Reduction,
                • Greening strategies,
                • Sustainable Urban drainage systems (SUDS),
                • Nature Based Solutions (NBS)
                • Energy Neutral,
                • Low Emission Zone,
                • Nature Based Solutions (NBS)
                • Energy Neutral
                • Greening strategies
                A3P009: Other
                A3P010: Legal / Regulatory aspects
                A3P010: Legal / Regulatory aspectsISO 45001, ISO 14001, ISO 50001, Zero Waste PolicyMobility contracts: A mobility contract is concluded between the City of Graz and the property developers in the course of development plans and serves to reduce the motor vehicle traffic to be expected as a result of the construction project. Push & pull measures are agreed: With a lower car parking space key, which is significantly lower than today's usual requirements, offers and information for easier use of public transport, walking and cycling, as well as car sharing and e-mobility are simultaneously created by the property developers, leading to a win-win-win situation for all parties involved. Basic principles - Possibility of combining effective "push & pull" measures => control option (e.g. reduction of car parking spaces, but optimisation of accessibility to public transport and walking and cycling networks, public transport tickets, mobility information, ... etc.) - Changing mobility behaviour in favour of sustainable forms of transport from the moment the flat is handed over ("upheaval" in personal mobility behaviour when changing the residential location) - Reduction in construction and maintenance costs (underground car parks, public road infrastructure) - Easier realisation of larger construction projects in the inner city area with lower generation of vehicle demand Städtebauliche Verträge in Graz / Urban development contracts in Graz Qualitative urban (neighbourhood) development with added value for all stakeholders: urban development contracts are modern instruments in the development of cities and neighbourhoods. As one of the pioneers in this field, the City of Graz also increasingly favours this form of quality assurance. Urban development contracts are a contractual form of regulation between the City of Graz and landowners, which enables flexible control of urban (sub)development in the interests of the common interests while at the same time relieving the public authorities. The contracts make property-related stipulations in accordance with urban planning requirements (e.g. urban development concept, development concept, framework plan, zoning plan) and the specialist planning requirements in particular infrastructure, development, design and mobility. This is intended to infrastructure, services of general interest, building land quality and settlement development required for the (parts of the) city.
                B1P001: PED/PED relevant concept definition
                B1P001: PED/PED relevant concept definitionThe campus should be considered a PED case study due to its exemplary commitment to sustainability and energy efficiency, as evidenced by several of its buildings achieving LEED certification. This certification underscores the campus's adherence to rigorous environmental standards and its proactive steps towards reducing carbon footprints. Also, the integration of sustainable practices across the campus aligns with the PED framework, which aims to create urban areas that produce more energy than they consume. Therefore, this campus serves as a model of how educational institutions can lead the way in fostering sustainable communities and advancing the goals of PED.Reininghaus addresses some relevant key aspects listed in the JPI UE PED Framework Definition such as: - high level of aspiration in terms of energy efficiency, energy flexibility and energy production; - integration of different systems and infrastructures; - inclusion of aspects not only related to energy sector, but also connected with social, economic and environmental sustainability.Refurbishment of social housing. The refurbishment complies with EnergieSprong specifications. This implies a performance of E=0 over 25 years.
                B1P002: Motivation behind PED/PED relevant project development
                B1P002: Motivation behind PED/PED relevant project developmentThe purpose of implementing the PED project on this sustainable campus, where several buildings have LEED certification, is to further enhance its energy efficiency and environmental stewardship by creating a district that generates more energy than it consumes. The initiator was motivated by the need to address climate change, reduce greenhouse gas emissions, and promote renewable energy sources. Additionally, the campus's existing commitment to sustainability and the success of its LEED-certified buildings provided a strong foundation for demonstrating the feasibility and benefits of PED development, serving as a model for sustainable urban living and energy self-sufficiency.The Reininghausgründe is a new quarter near the centre of the City of Graz. On the area of a former brewery, close to more, still working industries, a new town centre is being established. The quarter will include living areas, workplaces, shops, schools and a park, so that the need for individual mobility is minimized. It is connected to the historical city centre by bike paths, busses and a tram. Car sharing is provided as well.Refurbishment of social housing
                B1P003: Environment of the case study area
                B2P003: Environment of the case study areaSuburban areaUrban areaUrban areaSuburban area
                B1P004: Type of district
                B2P004: Type of district
                • Renovation
                • New construction
                • New construction
                • Renovation
                B1P005: Case Study Context
                B1P005: Case Study Context
                • Retrofitting Area
                • New Development
                • New Development
                • Retrofitting Area
                B1P006: Year of construction
                B1P006: Year of construction202420251958
                B1P007: District population before intervention - Residential
                B1P007: District population before intervention - Residential0
                B1P008: District population after intervention - Residential
                B1P008: District population after intervention - Residential10000
                B1P009: District population before intervention - Non-residential
                B1P009: District population before intervention - Non-residential98000
                B1P010: District population after intervention - Non-residential
                B1P010: District population after intervention - Non-residential9800
                B1P011: Population density before intervention
                B1P011: Population density before intervention003400000
                B1P012: Population density after intervention
                B1P012: Population density after intervention0034.33777154870400.01000
                B1P013: Building and Land Use before intervention
                B1P013: Residentialnononononononoyesno
                B1P013 - Residential: Specify the sqm [m²]
                B1P013: Officenonononononononono
                B1P013 - Office: Specify the sqm [m²]
                B1P013: Industry and Utilitynonononoyesnononono
                B1P013 - Industry and Utility: Specify the sqm [m²]
                B1P013: Commercialnonononononononono
                B1P013 - Commercial: Specify the sqm [m²]
                B1P013: Institutionalnonoyesnononononono
                B1P013 - Institutional: Specify the sqm [m²]285.400
                B1P013: Natural areasnonononoyesnononono
                B1P013 - Natural areas: Specify the sqm [m²]
                B1P013: Recreationalnonononononononono
                B1P013 - Recreational: Specify the sqm [m²]
                B1P013: Dismissed areasnonononononononono
                B1P013 - Dismissed areas: Specify the sqm [m²]
                B1P013: Othernonononononononono
                B1P013 - Other: Specify the sqm [m²]
                B1P014: Building and Land Use after intervention
                B1P014: Residentialnonononoyesnonoyesno
                B1P014 - Residential: Specify the sqm [m²]
                B1P014: Officenonononoyesnononono
                B1P014 - Office: Specify the sqm [m²]
                B1P014: Industry and Utilitynonononononononono
                B1P014 - Industry and Utility: Specify the sqm [m²]
                B1P014: Commercialnonononoyesnononono
                B1P014 - Commercial: Specify the sqm [m²]
                B1P014: Institutionalnonoyesnoyesnononono
                B1P014 - Institutional: Specify the sqm [m²]280000
                B1P014: Natural areasnonononoyesnononono
                B1P014 - Natural areas: Specify the sqm [m²]
                B1P014: Recreationalnonononoyesnononono
                B1P014 - Recreational: Specify the sqm [m²]
                B1P014: Dismissed areasnonononononononono
                B1P014 - Dismissed areas: Specify the sqm [m²]
                B1P014: Othernonononononononono
                B1P014 - Other: Specify the sqm [m²]
                B2P001: PED Lab concept definition
                B2P001: PED Lab concept definition
                B2P002: Installation life time
                B2P002: Installation life time
                B2P003: Scale of action
                B2P003: Scale
                B2P004: Operator of the installation
                B2P004: Operator of the installation
                B2P005: Replication framework: Applied strategy to reuse and recycling the materials
                B2P005: Replication framework: Applied strategy to reuse and recycling the materials
                B2P006: Circular Economy Approach
                B2P006: Do you apply any strategy to reuse and recycling the materials?
                B2P006: Other
                B2P007: Motivation for developing the PED Lab
                B2P007: Motivation for developing the PED Lab
                B2P007: Other
                B2P008: Lead partner that manages the PED Lab
                B2P008: Lead partner that manages the PED Lab
                B2P008: Other
                B2P009: Collaborative partners that participate in the PED Lab
                B2P009: Collaborative partners that participate in the PED Lab
                B2P009: Other
                B2P010: Synergies between the fields of activities
                B2P010: Synergies between the fields of activities
                B2P011: Available facilities to test urban configurations in PED Lab
                B2P011: Available facilities to test urban configurations in PED Lab
                B2P011: Other
                B2P012: Incubation capacities of PED Lab
                B2P012: Incubation capacities of PED Lab
                B2P013: Availability of the facilities for external people
                B2P013: Availability of the facilities for external people
                B2P014: Monitoring measures
                B2P014: Monitoring measures
                B2P015: Key Performance indicators
                B2P015: Key Performance indicators
                B2P016: Execution of operations
                B2P016: Execution of operations
                B2P017: Capacities
                B2P017: Capacities
                B2P018: Relations with stakeholders
                B2P018: Relations with stakeholders
                B2P019: Available tools
                B2P019: Available tools
                B2P019: Available tools
                B2P020: External accessibility
                B2P020: External accessibility
                C1P001: Unlocking Factors
                C1P001: Recent technological improvements for on-site RES production5 - Very important3 - Moderately important5 - Very important1 - Unimportant3 - Moderately important5 - Very important4 - Important1 - Unimportant1 - Unimportant
                C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock5 - Very important1 - Unimportant5 - Very important1 - Unimportant2 - Slightly important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant
                C1P001: Energy Communities, P2P, Prosumers concepts5 - Very important5 - Very important4 - Important1 - Unimportant4 - Important5 - Very important4 - Important1 - Unimportant5 - Very important
                C1P001: Storage systems and E-mobility market penetration4 - Important4 - Important1 - Unimportant2 - Slightly important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P001: Decreasing costs of innovative materials4 - Important1 - Unimportant4 - Important1 - Unimportant2 - Slightly important3 - Moderately important1 - Unimportant1 - Unimportant2 - Slightly important
                C1P001: Financial mechanisms to reduce costs and maximize benefits4 - Important4 - Important5 - Very important1 - Unimportant2 - Slightly important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P001: The ability to predict Multiple Benefits2 - Slightly important4 - Important1 - Unimportant4 - Important4 - Important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P001: The ability to predict the distribution of benefits and impacts2 - Slightly important4 - Important1 - Unimportant4 - Important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important
                C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)5 - Very important4 - Important5 - Very important1 - Unimportant5 - Very important5 - Very important3 - Moderately important1 - Unimportant5 - Very important
                C1P001: Social acceptance (top-down)5 - Very important4 - Important4 - Important1 - Unimportant4 - Important4 - Important4 - Important1 - Unimportant2 - Slightly important
                C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)3 - Moderately important5 - Very important5 - Very important1 - Unimportant5 - Very important5 - Very important4 - Important1 - Unimportant3 - Moderately important
                C1P001: Presence of integrated urban strategies and plans3 - Moderately important2 - Slightly important4 - Important1 - Unimportant5 - Very important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important
                C1P001: Multidisciplinary approaches available for systemic integration3 - Moderately important2 - Slightly important4 - Important1 - Unimportant5 - Very important4 - Important4 - Important1 - Unimportant4 - Important
                C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects4 - Important4 - Important4 - Important1 - Unimportant4 - Important5 - Very important5 - Very important1 - Unimportant2 - Slightly important
                C1P001: Availability of RES on site (Local RES)4 - Important5 - Very important1 - Unimportant3 - Moderately important5 - Very important5 - Very important1 - Unimportant1 - Unimportant
                C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders4 - Important3 - Moderately important4 - Important1 - Unimportant5 - Very important5 - Very important4 - Important1 - Unimportant1 - Unimportant
                C1P001: Any other UNLOCKING FACTORS1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P001: Any other UNLOCKING FACTORS (if any)
                C1P002: Driving Factors
                C1P002: Climate Change adaptation need4 - Important4 - Important5 - Very important1 - Unimportant5 - Very important4 - Important4 - Important1 - Unimportant3 - Moderately important
                C1P002: Climate Change mitigation need (local RES production and efficiency)5 - Very important4 - Important5 - Very important1 - Unimportant5 - Very important5 - Very important4 - Important1 - Unimportant5 - Very important
                C1P002: Rapid urbanization trend and need of urban expansions1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant4 - Important3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant
                C1P002: Urban re-development of existing built environment3 - Moderately important3 - Moderately important4 - Important1 - Unimportant5 - Very important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant
                C1P002: Economic growth need2 - Slightly important3 - Moderately important4 - Important1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)3 - Moderately important4 - Important5 - Very important1 - Unimportant5 - Very important5 - Very important5 - Very important1 - Unimportant3 - Moderately important
                C1P002: Territorial and market attractiveness2 - Slightly important4 - Important4 - Important1 - Unimportant5 - Very important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant
                C1P002: Energy autonomy/independence5 - Very important4 - Important5 - Very important1 - Unimportant3 - Moderately important5 - Very important5 - Very important1 - Unimportant1 - Unimportant
                C1P002: Any other DRIVING FACTOR1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P002: Any other DRIVING FACTOR (if any)
                C1P003: Administrative barriers
                C1P003: Difficulty in the coordination of high number of partners and authorities4 - Important5 - Very important5 - Very important1 - Unimportant5 - Very important4 - Important2 - Slightly important1 - Unimportant3 - Moderately important
                C1P003: Lack of good cooperation and acceptance among partners3 - Moderately important4 - Important5 - Very important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P003: Lack of public participation3 - Moderately important4 - Important4 - Important1 - Unimportant4 - Important5 - Very important4 - Important1 - Unimportant4 - Important
                C1P003: Lack of institutions/mechanisms to disseminate information3 - Moderately important4 - Important4 - Important1 - Unimportant2 - Slightly important3 - Moderately important4 - Important1 - Unimportant3 - Moderately important
                C1P003:Long and complex procedures for authorization of project activities5 - Very important3 - Moderately important5 - Very important1 - Unimportant5 - Very important3 - Moderately important4 - Important1 - Unimportant5 - Very important
                C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy4 - Important2 - Slightly important3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant
                C1P003: Complicated and non-comprehensive public procurement4 - Important3 - Moderately important4 - Important1 - Unimportant2 - Slightly important3 - Moderately important4 - Important1 - Unimportant3 - Moderately important
                C1P003: Fragmented and or complex ownership structure3 - Moderately important4 - Important4 - Important1 - Unimportant5 - Very important2 - Slightly important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P003: City administration & cross-sectoral attitude/approaches (silos)3 - Moderately important3 - Moderately important5 - Very important1 - Unimportant4 - Important3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P003: Lack of internal capacities to support energy transition3 - Moderately important3 - Moderately important5 - Very important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important1 - Unimportant1 - Unimportant
                C1P003: Any other Administrative BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P003: Any other Administrative BARRIER (if any)
                C1P004: Policy barriers
                C1P004: Lack of long-term and consistent energy plans and policies4 - Important5 - Very important5 - Very important1 - Unimportant2 - Slightly important5 - Very important3 - Moderately important1 - Unimportant2 - Slightly important
                C1P004: Lacking or fragmented local political commitment and support on the long term4 - Important4 - Important5 - Very important1 - Unimportant2 - Slightly important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important
                C1P004: Lack of Cooperation & support between national-regional-local entities3 - Moderately important4 - Important5 - Very important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important
                C1P004: Any other Political BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P004: Any other Political BARRIER (if any)
                C1P005: Legal and Regulatory barriers
                C1P005: Inadequate regulations for new technologies4 - Important4 - Important5 - Very important1 - Unimportant1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant4 - Important
                C1P005: Regulatory instability3 - Moderately important1 - Unimportant5 - Very important1 - Unimportant1 - Unimportant4 - Important2 - Slightly important1 - Unimportant4 - Important
                C1P005: Non-effective regulations4 - Important2 - Slightly important4 - Important1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant3 - Moderately important
                C1P005: Unfavorable local regulations for innovative technologies3 - Moderately important3 - Moderately important4 - Important1 - Unimportant4 - Important4 - Important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P005: Building code and land-use planning hindering innovative technologies4 - Important3 - Moderately important4 - Important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P005: Insufficient or insecure financial incentives4 - Important3 - Moderately important5 - Very important1 - Unimportant4 - Important5 - Very important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation4 - Important3 - Moderately important3 - Moderately important1 - Unimportant2 - Slightly important5 - Very important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P005: Shortage of proven and tested solutions and examples4 - Important4 - Important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P005: Any other Legal and Regulatory BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P005: Any other Legal and Regulatory BARRIER (if any)
                C1P006: Environmental barriers
                C1P006: Environmental barriersAir Quality Management Importance Level: 5 (Very Important) Energy Efficiency Importance Level: 5 (Very Important) Water Conservation Importance Level: 5 (Very Important) Waste Management Importance Level: 4 (Important) Material Selection Importance Level: 4 (Important) Renewable Energy Integration Importance Level: 5 (Very Important) Heat Island Effect Mitigation Importance Level: 4 (Important) Noise Pollution Control Importance Level: 3 (Moderately Important)
                C1P007: Technical barriers
                C1P007: Lack of skilled and trained personnel4 - Important4 - Important5 - Very important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant4 - Important
                C1P007: Deficient planning3 - Moderately important4 - Important5 - Very important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant5 - Very important
                C1P007: Retrofitting work in dwellings in occupied state4 - Important3 - Moderately important3 - Moderately important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P007: Lack of well-defined process4 - Important3 - Moderately important4 - Important1 - Unimportant4 - Important4 - Important2 - Slightly important1 - Unimportant4 - Important
                C1P007: Inaccuracy in energy modelling and simulation4 - Important4 - Important5 - Very important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P007: Lack/cost of computational scalability4 - Important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P007: Grid congestion, grid instability4 - Important3 - Moderately important5 - Very important1 - Unimportant1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P007: Negative effects of project intervention on the natural environment3 - Moderately important3 - Moderately important5 - Very important1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P007: Energy retrofitting work in dense and/or historical urban environment5 - Very important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P007: Difficult definition of system boundaries3 - Moderately important3 - Moderately important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P007: Any other Thecnical BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P007: Any other Thecnical BARRIER (if any)
                C1P008: Social and Cultural barriers
                C1P008: Inertia4 - Important2 - Slightly important4 - Important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important1 - Unimportant4 - Important
                C1P008: Lack of values and interest in energy optimization measurements5 - Very important4 - Important5 - Very important1 - Unimportant4 - Important5 - Very important5 - Very important1 - Unimportant4 - Important
                C1P008: Low acceptance of new projects and technologies5 - Very important4 - Important5 - Very important1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P008: Difficulty of finding and engaging relevant actors5 - Very important4 - Important4 - Important1 - Unimportant4 - Important4 - Important3 - Moderately important1 - Unimportant5 - Very important
                C1P008: Lack of trust beyond social network4 - Important4 - Important4 - Important1 - Unimportant3 - Moderately important5 - Very important2 - Slightly important1 - Unimportant3 - Moderately important
                C1P008: Rebound effect4 - Important4 - Important3 - Moderately important1 - Unimportant2 - Slightly important3 - Moderately important2 - Slightly important1 - Unimportant1 - Unimportant
                C1P008: Hostile or passive attitude towards environmentalism5 - Very important5 - Very important5 - Very important1 - Unimportant1 - Unimportant3 - Moderately important4 - Important1 - Unimportant4 - Important
                C1P008: Exclusion of socially disadvantaged groups2 - Slightly important5 - Very important5 - Very important1 - Unimportant1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant1 - Unimportant
                C1P008: Non-energy issues are more important and urgent for actors3 - Moderately important2 - Slightly important4 - Important1 - Unimportant4 - Important4 - Important2 - Slightly important1 - Unimportant5 - Very important
                C1P008: Hostile or passive attitude towards energy collaboration3 - Moderately important5 - Very important1 - Unimportant1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant3 - Moderately important
                C1P008: Any other Social BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P008: Any other Social BARRIER (if any)
                C1P009: Information and Awareness barriers
                C1P009: Insufficient information on the part of potential users and consumers4 - Important5 - Very important1 - Unimportant2 - Slightly important5 - Very important2 - Slightly important1 - Unimportant5 - Very important
                C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts4 - Important5 - Very important1 - Unimportant4 - Important4 - Important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P009: Lack of awareness among authorities4 - Important5 - Very important1 - Unimportant2 - Slightly important3 - Moderately important4 - Important1 - Unimportant4 - Important
                C1P009: Information asymmetry causing power asymmetry of established actors4 - Important4 - Important1 - Unimportant4 - Important3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P009: High costs of design, material, construction, and installation4 - Important4 - Important1 - Unimportant4 - Important5 - Very important2 - Slightly important1 - Unimportant4 - Important
                C1P009: Any other Information and Awareness BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P009: Any other Information and Awareness BARRIER (if any)
                C1P010: Financial barriers
                C1P010: Hidden costs5 - Very important4 - Important1 - Unimportant3 - Moderately important3 - Moderately important2 - Slightly important1 - Unimportant2 - Slightly important
                C1P010: Insufficient external financial support and funding for project activities5 - Very important5 - Very important1 - Unimportant2 - Slightly important4 - Important2 - Slightly important1 - Unimportant5 - Very important
                C1P010: Economic crisis3 - Moderately important4 - Important1 - Unimportant4 - Important3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P010: Risk and uncertainty5 - Very important5 - Very important1 - Unimportant2 - Slightly important4 - Important4 - Important1 - Unimportant3 - Moderately important
                C1P010: Lack of consolidated and tested business models4 - Important4 - Important1 - Unimportant2 - Slightly important5 - Very important4 - Important1 - Unimportant4 - Important
                C1P010: Limited access to capital and cost disincentives4 - Important5 - Very important1 - Unimportant2 - Slightly important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P010: Any other Financial BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P010: Any other Financial BARRIER (if any)
                C1P011: Market barriers
                C1P011: Split incentives5 - Very important5 - Very important1 - Unimportant2 - Slightly important4 - Important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P011: Energy price distortion3 - Moderately important5 - Very important1 - Unimportant4 - Important5 - Very important3 - Moderately important1 - Unimportant3 - Moderately important
                C1P011: Energy market concentration, gatekeeper actors (DSOs)4 - Important4 - Important1 - Unimportant4 - Important5 - Very important3 - Moderately important1 - Unimportant5 - Very important
                C1P011: Any other Market BARRIER1 - Unimportant3 - Moderately important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant
                C1P011: Any other Market BARRIER (if any)
                C1P012: Stakeholders involved
                C1P012: Government/Public Authorities
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Research & Innovation
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Financial/Funding
                • Planning/leading,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Analyst, ICT and Big Data
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Monitoring/operation/management
                C1P012: Business process management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • None
                C1P012: Urban Services providers
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Real Estate developers
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Design/Construction companies
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation
                C1P012: End‐users/Occupants/Energy Citizens
                • Monitoring/operation/management
                • Design/demand aggregation
                C1P012: Social/Civil Society/NGOs
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Design/demand aggregation,
                • Monitoring/operation/management
                C1P012: Industry/SME/eCommerce
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                C1P012: Other
                • Planning/leading,
                • Design/demand aggregation,
                • Construction/implementation,
                • Monitoring/operation/management
                • None
                C1P012: Other (if any)
                Summary

                Authors (framework concept)

                Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)

                Contributors (to the content)

                Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)

                Implemented by

                Boutik.pt: Filipe Martins, Jamal Khan
                Marek Suchánek (Czech Technical University in Prague)