Filters:
NameProjectTypeCompare
Umeå, Ålidhem distirct PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Ankara, Çamlık District PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study / PED Relevant Case Study Compare
Trenčín MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Luxembourg, Betzdorf LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Compare
Vantaa, Aviapolis NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Vidin, Himik and Bononia MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Oslo, Verksbyen Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Uden, Loopkantstraat Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Relevant Case Study Compare
Zaragoza, Actur NEUTRALPATH – Pathway towards Climate-Neutrality through low risky and fully replicable Positive Clean Energy Districts PED Relevant Case Study Compare
Aarhus, Brabrand BIPED – Building Intelligent Positive Energy Districts PED Case Study / PED Relevant Case Study / PED Lab Compare
Riga, Ķīpsala, RTU smart student city ExPEDite – Enabling Positive Energy Districts through Digital Twins PED Case Study Compare
Izmir, District of Karşıyaka PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Case Study Compare
Istanbul, Ozyegin University Campus LEGOFIT – Adaptable technological solutions based on early design actions for the construction and renovation of Energy Positive Homes PED Relevant Case Study Uncompare
Espoo, Kera SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study / PED Relevant Case Study Compare
Borlänge, Rymdgatan’s Residential Portfolio PED-ACT – Auto characterization of PEDs for digital references towards iterative process optimisation PED Relevant Case Study Uncompare
Freiburg, Waldsee PED urban – Development of methods and tools for accounting, planning and operation of climate-neutral district PED Case Study Compare
Innsbruck, Campagne-Areal PED Relevant Case Study Uncompare
Graz, Reininghausgründe PED Case Study Compare
Stor-Elvdal, Campus Evenstad ZEN – Research Centre on Zero Emission Neighbourhoods in Smart Cities PED Relevant Case Study Compare
Oulu, Kaukovainio MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Halmstad, Fyllinge PED Relevant Case Study Uncompare
Lund, Brunnshög district PED Case Study Uncompare
Vienna, Am Kempelenpark PED Case Study Compare
Évora, Portugal POCITYF – A POsitive Energy CITY Transformation Framework PED Relevant Case Study / PED Lab Compare
Kladno, Sletiště (Sport Area), PED Winter Stadium SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study Compare
Groningen, PED South MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Groningen, PED North MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Lab Compare
Maia, Sobreiro Social Housing SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Lab Uncompare
Lubia (Soria), CEDER-CIEMAT PED Lab Compare
Tampere, Ilokkaanpuisto district STARDUST – Holistic and Integrated Urban Model for Smart Cities PED Relevant Case Study Compare
Leon, Former Sugar Factory district MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Istanbul, Kadikoy district, Caferaga MAKING-CITY – Energy efficient pathway for the city transformation: enabling a positive future PED Case Study Compare
Espoo, Leppävaara district, Sello center SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Espoo, Espoonlahti district, Lippulaiva block SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Compare
Salzburg, Gneis district Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Barcelona, Santa Coloma de Gramenet Syn.ikia – Sustainable Plus Energy Neighbourhoods PED Case Study Compare
Tartu, City centre area SmartEnCity – Towards Smart Zero CO2 Cities across Europe PED Relevant Case Study / PED Lab Compare
Bologna, Pilastro-Roveri district GRETA – GReen Energy Transition Actions PED Relevant Case Study Compare
Barcelona, SEILAB & Energy SmartLab PED Lab Compare
Leipzig, Baumwollspinnerei district SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Case Study Uncompare
Kifissia, Energy community SPARCS – Sustainable energy Positive & zero cARbon CommunitieS PED Relevant Case Study
TitleKifissia, Energy community
Maia, Sobreiro Social Housing
Innsbruck, Campagne-Areal
Leipzig, Baumwollspinnerei district
Lund, Brunnshög district
Borlänge, Rymdgatan’s Residential Portfolio
Halmstad, Fyllinge
Istanbul, Ozyegin University Campus
A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED LabKifissia, Energy communityMaia, Sobreiro Social HousingInnsbruck, Campagne-ArealLeipzig, Baumwollspinnerei districtLund, Brunnshög districtBorlänge, Rymdgatan’s Residential PortfolioHalmstad, FyllingeIstanbul, Ozyegin University Campus
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P003: Categorisation of the PED site
PED case studynononoyesyesnonono
PED relevant case studyyesnoyesnonoyesyesyes
PED Lab.noyesnononononono
A1P004: Targets of the PED case study / PED Lab
Climate neutralitynoyesyesyesyesyesnoyes
Annual energy surplusnonononoyesyesnono
Energy communityyesnononoyesyesyesno
Circularitynonononoyesnonono
Air quality and urban comfortyesnonoyesyesnonoyes
Electrificationyesnonoyesyesyesnoyes
Net-zero energy costnononononononono
Net-zero emissionnonoyesnoyesnonono
Self-sufficiency (energy autonomous)nononononononono
Maximise self-sufficiencynoyesnononoyesnono
Othernononoyesyesnonoyes
Other (A1P004)Net-zero emission; Annual energy surplusHolistic approach on city planning; Minimise car traffic - walkability; Local service; Climate neutral buildings 2030;almost nZEB district
A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED LabPlanning PhasePlanning PhaseCompletedImplementation PhaseIn operationPlanning PhasePlanning PhaseImplementation Phase
A1P006: Start Date
A1P006: Start date10/2104/16201501/2110/24
A1P007: End Date
A1P007: End date10/2404/22204001/3010/28
A1P008: Reference Project
A1P008: Reference Project
A1P009: Data availability
A1P009: Data availability
  • Monitoring data available within the districts,
  • Open data city platform – different dashboards,
  • Meteorological open data,
  • General statistical datasets,
  • GIS open datasets
  • Monitoring data available within the districts
  • Open data city platform – different dashboards
  • General statistical datasets
  • General statistical datasets
A1P009: OtherGIS open dataset is under construction
A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
              A1P011: Geographic coordinates
              X Coordinate (longitude):23.814588-8.37355711.42434673814025612.31845813.23246940076959915.39449512.9205429.258300
              Y Coordinate (latitude):38.07734941.13580447.27147078672910451.32649255.7198979220719360.48660956.6519441.030600
              A1P012: Country
              A1P012: CountryGreecePortugalAustriaGermanySwedenSwedenSwedenTurkey
              A1P013: City
              A1P013: CityMunicipality of KifissiaMaiaInnsbruckLeipzigLundBorlängeHalmstadIstanbul
              A1P014: Climate Zone (Köppen Geiger classification)
              A1P014: Climate Zone (Köppen Geiger classification).CsaCsbDfbDfbDfbDsbDwbCfa
              A1P015: District boundary
              A1P015: District boundaryVirtualVirtualGeographicFunctionalGeographicGeographicGeographicGeographic
              OtherThe energy will be produced by a PV plant installed on the terrace of a municipal building. Members of the energy community (that is under formation) will benefit from the energy produced via virtual net metering. PV instalment and the buildings (owned by the members of the community) will be within the boundaries of the Municipality but not necessary in the same area/district/neighbourhoodGeographic
              A1P016: Ownership of the case study/PED Lab
              A1P016: Ownership of the case study/PED Lab:PublicMixedPublicMixedMixedPrivate
              A1P017: Ownership of the land / physical infrastructure
              A1P017: Ownership of the land / physical infrastructure:Multiple OwnersMultiple OwnersMultiple OwnersSingle OwnerMultiple OwnersSingle Owner
              A1P018: Number of buildings in PED
              A1P018: Number of buildings in PED22422001025015
              A1P019: Conditioned space
              A1P019: Conditioned space [m²]222771700015000003700
              A1P020: Total ground area
              A1P020: Total ground area [m²]113513000015000009945285.400
              A1P021: Floor area ratio: Conditioned space / total ground area
              A1P021: Floor area ratio: Conditioned space / total ground area00211000
              A1P022: Financial schemes
              A1P022a: Financing - PRIVATE - Real estatenonononoyesnoyesyes
              A1P022a: Add the value in EUR if available [EUR]99999999
              A1P022b: Financing - PRIVATE - ESCO schemenononononononono
              A1P022b: Add the value in EUR if available [EUR]
              A1P022c: Financing - PRIVATE - Othernoyesnononononono
              A1P022c: Add the value in EUR if available [EUR]
              A1P022d: Financing - PUBLIC - EU structural fundingnonononoyesnonono
              A1P022d: Add the value in EUR if available [EUR]1000000
              A1P022e: Financing - PUBLIC - National fundingnoyesnonoyesnonono
              A1P022e: Add the value in EUR if available [EUR]30000000
              A1P022f: Financing - PUBLIC - Regional fundingnoyesnonoyesnonono
              A1P022f: Add the value in EUR if available [EUR]30000000
              A1P022g: Financing - PUBLIC - Municipal fundingnonononoyesnonono
              A1P022g: Add the value in EUR if available [EUR]180000000
              A1P022h: Financing - PUBLIC - Othernononononononono
              A1P022h: Add the value in EUR if available [EUR]
              A1P022i: Financing - RESEARCH FUNDING - EUnoyesnonoyesnoyesyes
              A1P022i: Add the value in EUR if available [EUR]2000000
              A1P022j: Financing - RESEARCH FUNDING - Nationalnonoyesnonononono
              A1P022j: Add the value in EUR if available [EUR]
              A1P022k: Financing - RESEARCH FUNDING - Local/regionalnononononononono
              A1P022k: Add the value in EUR if available [EUR]
              A1P022l: Financing - RESEARCH FUNDING - Othernononononononono
              A1P022l: Add the value in EUR if available [EUR]
              A1P022: Other
              A1P023: Economic Targets
              A1P023: Economic Targets
              • Positive externalities,
              • Boosting local and sustainable production
              • Job creation,
              • Other
              • Other
              • Positive externalities,
              • Boosting local businesses,
              • Boosting consumption of local and sustainable products
              • Boosting local and sustainable production
              • Positive externalities,
              • Boosting local and sustainable production,
              • Boosting consumption of local and sustainable products
              A1P023: OtherCreate affordable appartments for the citizensSustainable and replicable business models regarding renewable energy systemsWorld class sustainable living and research environments
              A1P024: More comments:
              A1P024: More comments:Owners are two local social housing companies. The complete district will consist 4 building blocks, from which only the first one with 4 building is ready built and occupied. At the end, it would be a district of ca. 1100 flats in 16 buildings with 78000 m2In addition to having the most energy efficient academic building in Turkey, the university campus also has 3 buildings with LEED NC Campus certificate and LEED BD+C Gold certificate. In addition, it aims to continuously improve the energy efficiency objectives on campus in an innovative way. For this purpose, energy management and storage systems are being installed in the Dormitory 6 building, which is used as the demo area of the LEGOFIT project, for the purpose of turning it into a PED project.
              A1P025: Estimated PED case study / PED LAB costs
              A1P025: Estimated PED case study / PED LAB costs [mil. EUR]1
              Contact person for general enquiries
              A1P026: NameArtemis Giavasoglou, Kleopatra KalampokaAdelina RodriguesGeorgios DermentzisSimon BaumMarkus PaulssonJingchun ShenMarkus OlofsgårdCem Keskin
              A1P027: OrganizationMunicipality of Kifissia – SPARCS local teamMaia Municipality (CM Maia) – Energy and Mobility divisionUniversity of InnsbruckCENERO Energy GmbHCity of LundHögskolan DalarnaAFRYCenter for Energy, Environment and Economy, Ozyegin University
              A1P028: AffiliationMunicipality / Public BodiesMunicipality / Public BodiesResearch Center / UniversityOtherMunicipality / Public BodiesResearch Center / UniversityOtherResearch Center / University
              A1P028: OtherCENERO Energy GmbH
              A1P029: Emailgiavasoglou@kifissia.grdscm.adelina@cm-maia.ptGeorgios.Dermentzis@uibk.ac.atsib@cenero.demarkus.paulsson@lund.sejih@du.semarkus.olofsgard@afry.comcem.keskin@ozyegin.edu.tr
              Contact person for other special topics
              A1P030: NameStavros Zapantis - vice mayorCarolina Gonçalves (AdEPorto)Simon BaumEva DalmanXingxing ZhangM. Pınar Mengüç
              A1P031: Emailstavros.zapantis@gmail.comcarolinagoncalves@adeporto.eusib@cenero.deeva.dalman@lund.sexza@du.sepinar.menguc@ozyegin.edu.tr
              Pursuant to the General Data Protection RegulationYesYesYesYesYesYes
              A2P001: Fields of application
              A2P001: Fields of application
              • Energy production
              • Energy efficiency,
              • Energy flexibility,
              • Energy production,
              • E-mobility,
              • Urban comfort (pollution, heat island, noise level etc.),
              • Digital technologies
              • Energy efficiency,
              • Energy production,
              • Indoor air quality
              • Energy efficiency,
              • Energy flexibility,
              • Energy production
              • Energy efficiency,
              • Energy flexibility,
              • Energy production,
              • E-mobility,
              • Urban comfort (pollution, heat island, noise level etc.),
              • Digital technologies,
              • Water use,
              • Waste management,
              • Construction materials,
              • Other
              • Energy efficiency,
              • Energy flexibility,
              • Energy production,
              • E-mobility,
              • Construction materials
              • Energy flexibility,
              • Energy production,
              • E-mobility,
              • Digital technologies
              • Energy efficiency,
              • Energy flexibility,
              • Energy production,
              • E-mobility,
              • Digital technologies,
              • Waste management,
              • Indoor air quality,
              • Construction materials
              A2P001: OtherWalkability and biking
              A2P002: Tools/strategies/methods applied for each of the above-selected fields
              A2P002: Tools/strategies/methods applied for each of the above-selected fieldsEnergy production: - installation of photovoltaic systems for renewable on-site energy production; - installation of a BIPV demonstrator for the City Hall building. Energy flexibility: - implementation of an energy community through an active citizens involvement process. Digital technologies: - smart-meters installation in some dwellings in order to monitor consumption and suggest more sustainable energy behaviours. [PCP] Through https://balcaodigital.e-redes.pt/consumptions/history “Espaço Municipal” (https://www.espacomunicipal.pt/pt/) might access history of consumption up to midnight of the previous day. E-mobility: - Installation of new charging stations for electric vehicles; Urban comfort and air quality: - Monitoring units for air pollutants concentration (PM2.5, PM10, NO2) [PCP] Currently we are monitoring CO, O3, NO2, SO2, noise, PM2.5 and PM10 at a point 267 m east from the four buildings southeast of Sobreiro area:The buildings are designed based on Passive House standards and dynamic building and system simulations are performed to optimise the HVAC systems, that are a ground-water heat pump for space heating and district heating for domestic hot water preparation. Photovoltaic systems are installed in the available roof spaces, however, more renewable sources are required due to very large number of apartments (very high density) to reach PED, and thus, simulation studies are performed.LundaMaTs methodology for traffic and city planning. LundaEko - Lund's programme for ecological sustainability. Municipally owned land is sold to property developers on environmental conditions.Load calculation and system optimisation: City Energy Analyst Identification of stranded assets for asset owners and investors to understand the carbon risks: CRREMlink based regulation of electricity gridLEED NC Campus + LEGOFIT Project Energy Efficiency: Tri- generation, Compliance with ISO 50001, ASHRAE 90.1, energy efficient appliances, HVAC and lighting Energy flexibility: Energy demand management Energy production: Solar PVs Onsite + (to be installed more) E-mobility: EV Charging stations Indoor Air Quality: Energy Management System, Compliance with ASHRAE 62.1, ASHRAE 55 Construction materials: Passive systems, LEED certified buildings, innovative materials such as PCM Waste Management: Zero waste document
              A2P003: Application of ISO52000
              A2P003: Application of ISO52000NoNoNoNoNoYes
              A2P004: Appliances included in the calculation of the energy balance
              A2P004: Appliances included in the calculation of the energy balanceYesYesYesYesNoYes
              A2P005: Mobility included in the calculation of the energy balance
              A2P005: Mobility included in the calculation of the energy balanceNoNoYesNoYesNo
              A2P006: Description of how mobility is included (or not included) in the calculation
              A2P006: Description of how mobility is included (or not included) in the calculationToday electrically charged vehicles are included in the energy balance. In the future also other fuels should be included.Not included, the campus is a non car area except emergencies
              A2P007: Annual energy demand in buildings / Thermal demand
              A2P007: Annual energy demand in buildings / Thermal demand [GWh/annum]0.391.65250.6777
              A2P008: Annual energy demand in buildings / Electric Demand
              A2P008: Annual energy demand in buildings / Electric Demand [GWh/annum]0.655300.03656
              A2P009: Annual energy demand for e-mobility
              A2P009: Annual energy demand for e-mobility [GWh/annum]000
              A2P010: Annual energy demand for urban infrastructure
              A2P010: Annual energy demand for urban infrastructure [GWh/annum]0
              A2P011: Annual renewable electricity production on-site during target year
              A2P011: PVyesyesyesyesyesnoyesyes
              A2P011: PV - specify production in GWh/annum [GWh/annum]0.42
              A2P011: Windnonononoyesnonono
              A2P011: Wind - specify production in GWh/annum [GWh/annum]
              A2P011: Hydronononononononono
              A2P011: Hydro - specify production in GWh/annum [GWh/annum]
              A2P011: Biomass_elnononononononono
              A2P011: Biomass_el - specify production in GWh/annum [GWh/annum]
              A2P011: Biomass_peat_elnononononononono
              A2P011: Biomass_peat_el - specify production in GWh/annum [GWh/annum]
              A2P011: PVT_elnononononoyesnono
              A2P011: PVT_el - specify production in GWh/annum [GWh/annum]0.01818
              A2P011: Othernononononononono
              A2P011: Other - specify production in GWh/annum [GWh/annum]
              A2P012: Annual renewable thermal production on-site during target year
              A2P012: Geothermalnonononononoyesno
              A2P012 - Geothermal: Please specify production in GWh/annum [GWh/annum]
              A2P012: Solar Thermalnoyesnononononono
              A2P012 - Solar Thermal: Please specify production in GWh/annum [GWh/annum]
              A2P012: Biomass_heatnononononononono
              A2P012 - Biomass_heat: Please specify production in GWh/annum [GWh/annum]
              A2P012: Waste heat+HPnonononoyesnonono
              A2P012 - Waste heat+HP: Please specify production in GWh/annum [GWh/annum]200
              A2P012: Biomass_peat_heatnononononononono
              A2P012 - Biomass_peat_heat: Please specify production in GWh/annum [GWh/annum]
              A2P012: PVT_thnononononoyesnono
              A2P012 - PVT_th: Please specify production in GWh/annum [GWh/annum]0.0825
              A2P012: Biomass_firewood_thnononononononono
              A2P012 - Biomass_firewood_th: Please specify production in GWh/annum [GWh/annum]
              A2P012: Othernononononononono
              A2P012 - Other: Please specify production in GWh/annum [GWh/annum]
              A2P013: Renewable resources on-site - Additional notes
              A2P013: Renewable resources on-site - Additional notes
              A2P014: Annual energy use
              A2P014: Annual energy use [GWh/annum]0.962.4210.3183.5
              A2P015: Annual energy delivered
              A2P015: Annual energy delivered [GWh/annum]-20.2055
              A2P016: Annual non-renewable electricity production on-site during target year
              A2P016: Annual non-renewable electricity production on-site during target year [GWh/annum]000
              A2P017: Annual non-renewable thermal production on-site during target year
              A2P017: Gasnononononononono
              A2P017 - Gas: Annual non-renewable thermal production on-site during target year [GWh/annum]
              A2P017: Coalnononononononono
              A2P017 - Coal: Annual non-renewable thermal production on-site during target year [GWh/annum]
              A2P017: Oilnononononononono
              A2P017 - Oil: Annual non-renewable thermal production on-site during target year [GWh/annum]
              A2P017: Othernononononoyesnono
              A2P017 - Other: Annual non-renewable thermal production on-site during target year [GWh/annum]0
              A2P018: Annual renewable electricity imports from outside the boundary during target year
              A2P018: PVnonononoyesnonoyes
              A2P018 - PV: specify production in GWh/annum if available [GWh/annum]0.00045547
              A2P018: Windnonononoyesnonono
              A2P018 - Wind: specify production in GWh/annum if available [GWh/annum]
              A2P018: Hydrononononoyesnonono
              A2P018 - Hydro: specify production in GWh/annum if available [GWh/annum]
              A2P018: Biomass_elnonononoyesnonono
              A2P018 - Biomass_el: specify production in GWh/annum if available [GWh/annum]
              A2P018: Biomass_peat_elnononononononono
              A2P018 - Biomass_peat_el: specify production in GWh/annum if available [GWh/annum]
              A2P018: PVT_elnononononononono
              A2P018 - PVT_el: specify production in GWh/annum if available [GWh/annum]
              A2P018: Othernononononoyesnono
              A2P018 - Other: specify production in GWh/annum if available [GWh/annum]0.187
              A2P019: Annual renewable thermal imports from outside the boundary during target year
              A2P019: Geothermalnononononononono
              A2P019 Geothermal: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Solar Thermalnononononononono
              A2P019 Solar Thermal: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Biomass_heatnononononononono
              A2P019 Biomass_heat: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Waste heat+HPnononononononono
              A2P019 Waste heat+HP: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Biomass_peat_heatnononononononono
              A2P019 Biomass_peat_heat: Please specify imports in GWh/annum [GWh/annum]
              A2P019: PVT_thnononononononono
              A2P019 PVT_th: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Biomass_firewood_thnononononononono
              A2P019 Biomass_firewood_th: Please specify imports in GWh/annum [GWh/annum]
              A2P019: Othernononononoyesnono
              A2P019 Other: Please specify imports in GWh/annum [GWh/annum]0
              A2P020: Share of RES on-site / RES outside the boundary
              A2P020: Share of RES on-site / RES outside the boundary000000.5383957219251300
              A2P021: GHG-balance calculated for the PED
              A2P021: GHG-balance calculated for the PED [tCO2/annum]6.93
              A2P022: KPIs related to the PED case study / PED Lab
              A2P022: Safety & Securitynone
              A2P022: Healthindoor air quility (indoor CO2 concentration) - measured on the extract air of the mechanical ventilation system. Relative humidity to avoid mold.thermal comfort diagram
              A2P022: Educationnone
              A2P022: MobilityMaximum 1/3 transport with carnone
              A2P022: EnergySpace heating demand, thermal energy delivered by district heating, electricity of the heat pump, thermal losses of the pipes, and PV production.applyLocal energy production 150% of energy neednormalized CO2/GHG & Energy intensity
              A2P022: Water
              A2P022: Economic developmentcost of excess emissions
              A2P022: Housing and Community50% rental apartments and 50% owner apartments
              A2P022: Waste
              A2P022: Other
              A2P023: Technological Solutions / Innovations - Energy Generation
              A2P023: Photovoltaicsnoyesyesnoyesyesyesyes
              A2P023: Solar thermal collectorsnoyesnonoyesyesnono
              A2P023: Wind Turbinesnonononoyesnonoyes
              A2P023: Geothermal energy systemnonononoyesyesnono
              A2P023: Waste heat recoverynonononoyesyesnono
              A2P023: Waste to energynononononononono
              A2P023: Polygenerationnonononoyesnonono
              A2P023: Co-generationnononononononoyes
              A2P023: Heat Pumpnoyesyesnoyesyesnoyes
              A2P023: Hydrogennonononoyesnonono
              A2P023: Hydropower plantnononononononono
              A2P023: Biomassnononononononono
              A2P023: Biogasnononononononono
              A2P023: Other
              A2P024: Technological Solutions / Innovations - Energy Flexibility
              A2P024: A2P024: Information and Communication Technologies (ICT)noyesnonoyesyesyesyes
              A2P024: Energy management systemnoyesnonoyesnonoyes
              A2P024: Demand-side managementnonononoyesnoyesyes
              A2P024: Smart electricity gridnonononoyesnoyesno
              A2P024: Thermal Storagenonoyesnoyesyesnono
              A2P024: Electric Storagenoyesnonoyesnonoyes
              A2P024: District Heating and Coolingnonoyesnoyesyesnoyes
              A2P024: Smart metering and demand-responsive control systemsnoyesnonoyesnoyesyes
              A2P024: P2P – buildingsnonoyesnonononono
              A2P024: Other
              A2P025: Technological Solutions / Innovations - Energy Efficiency
              A2P025: Deep Retrofittingnoyesnononoyesnono
              A2P025: Energy efficiency measures in historic buildingsnononononononono
              A2P025: High-performance new buildingsnonoyesnoyesnonoyes
              A2P025: Smart Public infrastructure (e.g. smart lighting)noyesnonoyesnonono
              A2P025: Urban data platformsnonononoyesnonono
              A2P025: Mobile applications for citizensnononononononono
              A2P025: Building services (HVAC & Lighting)noyesyesnoyesyesnoyes
              A2P025: Smart irrigationnononononononoyes
              A2P025: Digital tracking for waste disposalnoyesnonoyesnonono
              A2P025: Smart surveillancenononononononoyes
              A2P025: Other
              A2P026: Technological Solutions / Innovations - Mobility
              A2P026: Efficiency of vehicles (public and/or private)noyesnononononono
              A2P026: Measures to reduce traffic volume (e.g. measure to support public transportation, shared mobility, measure to reduce journeys and distances)nonononoyesnonono
              A2P026: e-Mobilitynoyesnonoyesnonoyes
              A2P026: Soft mobility infrastructures and last mile solutionsnonononoyesnonoyes
              A2P026: Car-free areanonononoyesnonoyes
              A2P026: Other
              A2P027: Mobility strategies - Additional notes
              A2P027: Mobility strategies - Additional notesTest-Concept for bidirectional charging.Walkability
              A2P028: Energy efficiency certificates
              A2P028: Energy efficiency certificatesYesYesYesNoNoYes
              A2P028: If yes, please specify and/or enter notesEnergy Performance Certificate - in Greece it is mandatory in order to buy or rent a house or a dwellingThe Municipal Buildings have an energy certificate, according to the Portuguese legislation.Two buildings are certified "Passive House new build"Miljöbyggnad silver/guld
              A2P029: Any other building / district certificates
              A2P029: Any other building / district certificatesNoNoNoNoNoYes
              A2P029: If yes, please specify and/or enter notesLEED BD+C, LEED NC CAMPUS
              A3P001: Relevant city /national strategy
              A3P001: Relevant city /national strategy
              • Energy master planning (SECAP, etc.),
              • Promotion of energy communities (REC/CEC)
              • Urban Renewal Strategies,
              • Energy master planning (SECAP, etc.),
              • Promotion of energy communities (REC/CEC),
              • Climate change adaption plan/strategy (e.g. Climate City contract)
              • Smart cities strategies
              • Climate change adaption plan/strategy (e.g. Climate City contract)
              • Promotion of energy communities (REC/CEC),
              • Climate change adaption plan/strategy (e.g. Climate City contract)
              • Promotion of energy communities (REC/CEC)
              • Smart cities strategies,
              • Energy master planning (SECAP, etc.),
              • Climate change adaption plan/strategy (e.g. Climate City contract),
              • National / international city networks addressing sustainable urban development and climate neutrality
              A3P002: Quantitative targets included in the city / national strategy
              A3P002: Quantitative targets included in the city / national strategyCity strategy: Net climate neutrality 2030The study aligns closely with the decarbonisation and energy reduction pathways of residential multi family buildings with 1.5°C global warming target in Sweden. This study will also contribute to the achievement of the carbon neturality of whole Borlänge city by 2030.
              A3P003: Strategies towards decarbonization of the gas grid
              A3P003: Strategies towards decarbonization of the gas grid
              • Other
              • Electrification of Heating System based on Heat Pumps,
              • Other
              • Biogas
              • Electrification of Heating System based on Heat Pumps,
              • Electrification of Cooking Methods
              A3P003: OtherAt a national level there are some studies regarding the decarbonization of the gas grid, but no concrete strategies so far.District heating based mainly on heat pumps and renewable sourcesNo gas grid in BrunnshögBoiler Automation, Energy Management System, Electric Battery Storage, Demand Management and Flexible Pricing
              A3P004: Identification of needs and priorities
              A3P004: Identification of needs and prioritiesThe priority was to eliminate the CO2 emissions by optimizing the building envelope and the heating systems.Local waste heat is utlized to a very large extent. More local electricity production is needed. Need to minimise the use of private cars.In our project, we carried out a comprehensive exploration of strategies to achieve positive energy districts in a Swedish residential portfolio. The focus on urban energy transitions necessitates a holistic approach that integrates building retrofit, solar technology exploration, and heating supply optimisation. Exploration of Local Solar Sources: The analysis reveals varying solar irradiance resources throughout the year, emphasizing the importance of strategic placement. Integration of combined photovoltaic and thermal panels into building envelopes demonstrates the potential to cover a significant portion of the energy demand even in Sweden. Heating Supply Optimisation with Solar Technologies: Despite the surplus energy production from on-site solar technology, challenges arise due to temporal energy asymmetry. The introduction of heat pumps emerges as a feasible solution to balance energy gaps, utilising both rejected and free heat. Optimisation scenarios, utilising a combination of geothermal heat pumps, water source heat pumps, and PVT, showcase remarkable reductions in emissions and primary energy consumption. Urban Form and Energy Infrastructure Design: We realised the importance of returning to urban form and energy infrastructure design to optimise future residential portfolio potential. Building layout design, influenced by zoning regulations and innovative typologies, plays a crucial role in achieving district level energy efficiency. Future challenges, including demographic shifts, e-mobility, and climate change, necessitate a more holistic approach to energy infrastructure design, addressing not only heating and electricity demands but also cooling requirements.Carbon and Energy Neutrality
              A3P005: Sustainable behaviour
              A3P005: Sustainable behaviourNeed to minimise the use of private cars. Need to provide efficient methods for sorce separated waste collection.While our investigation primarily centres on technical optimisation within Positive Energy District (PED) development, it is essential to acknowledge the broader scope encompassing social and governance dimensions. Specifically, understanding stakeholders' willingness to embrace technical recommendations upon project completion is important. Several potential influencing factors merit exploration, including economic considerations, technical optimisation-associated embodied carbon balance, the general public's technical perceptions, and operational feasibility. Evaluating these aspects holistically not only enhances the efficacy of PED initiatives but also fosters greater acceptance and participation within the communities they serve.Under LEGOFIT project, promoting sustainable behavior for better occupant experience is a targeted aim under a work package.
              A3P006: Economic strategies
              A3P006: Economic strategies
              • Innovative business models,
              • PPP models,
              • Existing incentives
              • Innovative business models,
              • Other
              • PPP models,
              • Other
              • Open data business models,
              • Life Cycle Cost,
              • Circular economy models,
              • Local trading
              • Local trading
              A3P006: Otheroperational savings through efficiency measuresAttractivenes
              A3P007: Social models
              A3P007: Social models
              • Co-creation / Citizen engagement strategies,
              • Prevention of energy poverty,
              • Digital Inclusion,
              • Citizen/owner involvement in planning and maintenance,
              • Educational activities and trainings (including capacity building towards technology literacy, energy efficient behaviour)
              • Co-creation / Citizen engagement strategies,
              • Social incentives,
              • Affordability,
              • Prevention of energy poverty,
              • Citizen/owner involvement in planning and maintenance
              • Behavioural Change / End-users engagement
              • Co-creation / Citizen engagement strategies,
              • Behavioural Change / End-users engagement,
              • Quality of Life,
              • Strategies towards social mix
              • Strategies towards (local) community-building,
              • Behavioural Change / End-users engagement,
              • Social incentives,
              • Affordability,
              • Digital Inclusion
              • Behavioural Change / End-users engagement,
              • Citizen/owner involvement in planning and maintenance
              A3P007: Other
              A3P008: Integrated urban strategies
              A3P008: Integrated urban strategies
              • City Vision 2050,
              • SECAP Updates,
              • Building / district Certification
              • Strategic urban planning,
              • Digital twinning and visual 3D models,
              • City Vision 2050,
              • SECAP Updates
              • Strategic urban planning,
              • Digital twinning and visual 3D models,
              • District Energy plans,
              • Building / district Certification
              • Strategic urban planning
              • City Vision 2050,
              • SECAP Updates,
              • Building / district Certification
              A3P008: Other
              A3P009: Environmental strategies
              A3P009: Environmental strategies
              • Energy Neutral,
              • Net zero carbon footprint,
              • Pollutants Reduction
              • Energy Neutral,
              • Low Emission Zone
              • Other
              • Net zero carbon footprint,
              • Greening strategies,
              • Sustainable Urban drainage systems (SUDS),
              • Nature Based Solutions (NBS)
              • Low Emission Zone,
              • Net zero carbon footprint,
              • Life Cycle approach,
              • Sustainable Urban drainage systems (SUDS)
              • Energy Neutral,
              • Carbon-free
              • Energy Neutral,
              • Low Emission Zone,
              • Net zero carbon footprint,
              • Greening strategies,
              • Cool Materials
              A3P009: OtherPositive Energy Balance for the demo site
              A3P010: Legal / Regulatory aspects
              A3P010: Legal / Regulatory aspectsThe municipality cannot demand a specific energy solution to private property owners. It has to be voluntary and market based solutions.ISO 45001, ISO 14001, ISO 50001, Zero Waste Policy
              B1P001: PED/PED relevant concept definition
              B1P001: PED/PED relevant concept definitionExtremely low building energy demand, the electric energy of the heat pump used for space heating is significantly lower compared to thermal energy for the domestic hot water preparation.Vision: The city as a power plant. The ultimate goal is that more energy is produced within the distric boundaries than is being used (heating, electricity & mobility). Energy efficient buildings, efficient mobility, reuse of residual heat and solar electricity are the main methods.The Rymdgatan's Residential Portfolio in Sweden presents a compelling case study for its classification as a PED-related research, given its alignment with sustainable behaviours and overarching PED development principles as follows: Inclusivity and Social Equity: The residential portfolio situated in Rymdgatan caters primarily to a low-income community. By focusing on this demographic, the project addresses critical aspects of social equity within sustainable urban development. Ensuring access to energy-efficient housing and amenities for economically disadvantaged populations not only fosters social cohesion but also mitigates energy poverty, a pressing concern in many urban contexts. Multifamily Residential Building: The inclusion of multifamily residential buildings within the portfolio underscores a commitment to density and efficient land use, both essential components of sustainable urban design. Such developments promote resource optimisation by consolidating housing units, thereby reducing per capita energy consumption and infrastructure demands. Moreover, multifamily dwellings often facilitate community engagement and shared resource management, fostering a culture of sustainability among residents. Low Carbon Retrofitting and Transition: The overarching initiative to transition the entire Jakobsgårdarna district. The included Rymdgatan portfolio, towards low carbon retrofitting, represents a significant example of decarbonization and climate resilience. By integrating energy-efficient technologies and renewable energy solutions into existing infrastructure, the project not only reduces carbon emissions but also serves as a blueprint for revitalising old urban environments sustainably. This holistic approach to retrofitting demonstrates a systemic commitment to environmental stewardship and long-term sustainability. Climate Adaptation and Renewable Energy Integration: Despite Sweden's climatic challenges, including lower solar resources during winter months, the Rymdgatan project leverages its geographical context to optimize renewable energy utilization. Sweden's greater solar resource availability during summer and geothermal potentials complement the design's emphasis on seasonal energy planning, where surplus energy generated during peak periods can be stored or redistributed efficiently. By embracing climate-responsive design strategies, the project demonstrates resilience in the face of climate variability while harnessing renewable energy potential effectively.The campus should be considered a PED case study due to its exemplary commitment to sustainability and energy efficiency, as evidenced by several of its buildings achieving LEED certification. This certification underscores the campus's adherence to rigorous environmental standards and its proactive steps towards reducing carbon footprints. Also, the integration of sustainable practices across the campus aligns with the PED framework, which aims to create urban areas that produce more energy than they consume. Therefore, this campus serves as a model of how educational institutions can lead the way in fostering sustainable communities and advancing the goals of PED.
              B1P002: Motivation behind PED/PED relevant project development
              B1P002: Motivation behind PED/PED relevant project developmentSince it is an urban area, with high building and apartment density, the need for CO2 reduction is quite relevant and thus, in new built, the minimization of CO2 emissions is crucial.The aim is to build a sustainable city with minimal climate impact and maximum quality of life. PED is an important step to acheive the aims of a very ambitious city development.Borlänge city has committed to become the carbon-neutral city by 2030.The purpose of implementing the PED project on this sustainable campus, where several buildings have LEED certification, is to further enhance its energy efficiency and environmental stewardship by creating a district that generates more energy than it consumes. The initiator was motivated by the need to address climate change, reduce greenhouse gas emissions, and promote renewable energy sources. Additionally, the campus's existing commitment to sustainability and the success of its LEED-certified buildings provided a strong foundation for demonstrating the feasibility and benefits of PED development, serving as a model for sustainable urban living and energy self-sufficiency.
              B1P003: Environment of the case study area
              B2P003: Environment of the case study areaUrban areaUrban areaUrban areaSuburban areaSuburban area
              B1P004: Type of district
              B2P004: Type of district
              • New construction
              • New construction
              • Renovation
              • New construction
              • Renovation
              B1P005: Case Study Context
              B1P005: Case Study Context
              • Re-use / Transformation Area,
              • New Development
              • Preservation Area
              • New Development
              • Re-use / Transformation Area,
              • Retrofitting Area
              • New Development
              • Retrofitting Area
              B1P006: Year of construction
              B1P006: Year of construction202219902024
              B1P007: District population before intervention - Residential
              B1P007: District population before intervention - Residential0100
              B1P008: District population after intervention - Residential
              B1P008: District population after intervention - Residential78018000100
              B1P009: District population before intervention - Non-residential
              B1P009: District population before intervention - Non-residential200069800
              B1P010: District population after intervention - Non-residential
              B1P010: District population after intervention - Non-residential2200069800
              B1P011: Population density before intervention
              B1P011: Population density before intervention000000034
              B1P012: Population density after intervention
              B1P012: Population density after intervention000.06871641265086800.0266666666666670.010658622423328034.337771548704
              B1P013: Building and Land Use before intervention
              B1P013: Residentialnononononoyesnono
              B1P013 - Residential: Specify the sqm [m²]4360
              B1P013: Officenonononoyesnonono
              B1P013 - Office: Specify the sqm [m²]60000
              B1P013: Industry and Utilitynononononononono
              B1P013 - Industry and Utility: Specify the sqm [m²]
              B1P013: Commercialnononononononono
              B1P013 - Commercial: Specify the sqm [m²]
              B1P013: Institutionalnononononononoyes
              B1P013 - Institutional: Specify the sqm [m²]285.400
              B1P013: Natural areasnonononoyesnoyesno
              B1P013 - Natural areas: Specify the sqm [m²]2000000
              B1P013: Recreationalnononononononono
              B1P013 - Recreational: Specify the sqm [m²]
              B1P013: Dismissed areasnononononononono
              B1P013 - Dismissed areas: Specify the sqm [m²]
              B1P013: Othernonononoyesyesnono
              B1P013 - Other: Specify the sqm [m²]Outdoor parking: 100000706
              B1P014: Building and Land Use after intervention
              B1P014: Residentialnonoyesnoyesyesnono
              B1P014 - Residential: Specify the sqm [m²]6000004360
              B1P014: Officenonononoyesnonono
              B1P014 - Office: Specify the sqm [m²]650000
              B1P014: Industry and Utilitynononononononono
              B1P014 - Industry and Utility: Specify the sqm [m²]
              B1P014: Commercialnonoyesnonononono
              B1P014 - Commercial: Specify the sqm [m²]
              B1P014: Institutionalnonoyesnoyesnonoyes
              B1P014 - Institutional: Specify the sqm [m²]50000280000
              B1P014: Natural areasnononononononono
              B1P014 - Natural areas: Specify the sqm [m²]
              B1P014: Recreationalnonoyesnoyesnonono
              B1P014 - Recreational: Specify the sqm [m²]400000
              B1P014: Dismissed areasnononononononono
              B1P014 - Dismissed areas: Specify the sqm [m²]
              B1P014: Othernononononoyesnono
              B1P014 - Other: Specify the sqm [m²]706
              B2P001: PED Lab concept definition
              B2P001: PED Lab concept definition
              B2P002: Installation life time
              B2P002: Installation life timePermanent installation
              B2P003: Scale of action
              B2P003: ScaleVirtual
              B2P004: Operator of the installation
              B2P004: Operator of the installationCM Maia, IPMAIA, NEW, AdEP.
              B2P005: Replication framework: Applied strategy to reuse and recycling the materials
              B2P005: Replication framework: Applied strategy to reuse and recycling the materials
              B2P006: Circular Economy Approach
              B2P006: Do you apply any strategy to reuse and recycling the materials?No
              B2P006: Other
              B2P007: Motivation for developing the PED Lab
              B2P007: Motivation for developing the PED Lab
              • Strategic
              B2P007: Other
              B2P008: Lead partner that manages the PED Lab
              B2P008: Lead partner that manages the PED LabMunicipality
              B2P008: Other
              B2P009: Collaborative partners that participate in the PED Lab
              B2P009: Collaborative partners that participate in the PED Lab
              • Academia,
              • Private,
              • Industrial,
              • Citizens, public, NGO,
              • Other
              B2P009: OtherEnergy Agency
              B2P010: Synergies between the fields of activities
              B2P010: Synergies between the fields of activities
              B2P011: Available facilities to test urban configurations in PED Lab
              B2P011: Available facilities to test urban configurations in PED Lab
              • Buildings,
              • Demand-side management,
              • Prosumers,
              • Renewable generation,
              • Energy storage,
              • Efficiency measures,
              • Lighting,
              • E-mobility,
              • Information and Communication Technologies (ICT),
              • Ambient measures,
              • Social interactions
              B2P011: Other
              B2P012: Incubation capacities of PED Lab
              B2P012: Incubation capacities of PED Lab
              • Monitoring and evaluation infrastructure,
              • Tools, spaces, events for testing and validation
              B2P013: Availability of the facilities for external people
              B2P013: Availability of the facilities for external peopleDepends on the building: _Tecmaia is open to the public but the buildings are for the exclusive use of companies allocated at the industrial site; _The municipal buildings have public access; _The residential buildings have an exclusive use for the residents.
              B2P014: Monitoring measures
              B2P014: Monitoring measures
              • Execution plan,
              • Available data,
              • Type of measured data
              B2P015: Key Performance indicators
              B2P015: Key Performance indicators
              • Energy,
              • Environmental,
              • Social,
              • Economical / Financial
              B2P016: Execution of operations
              B2P016: Execution of operationsCurrent PED status (WP5 SPARCS): Conceptualization and methodology definition of the (virtual) PED for Maia Municipality with real monitoring and assessment in order to replicate and scale up to a city-level PED. The financial investments were already targeted.
              B2P017: Capacities
              B2P017: Capacities_Energy production and storage, _Monitoring; _Digitization.
              B2P018: Relations with stakeholders
              B2P018: Relations with stakeholdersThe relationship with stakeholders (municipal companies, industry, citizens, etc) has been fundamental for the definition of the PED. In this sense, some sessions were organized to gather different points of view in order to trace the best path for the PED. Also, the participation of Maia Municipality in EU projects, as EHHUR and OMEGA-X, makes possible the share of knowledge between different partners.
              B2P019: Available tools
              B2P019: Available tools
              • Energy modelling,
              • Social models,
              • Business and financial models,
              • Fundraising and accessing resources,
              • Matching actors
              B2P019: Available tools
              B2P020: External accessibility
              B2P020: External accessibility
              C1P001: Unlocking Factors
              C1P001: Recent technological improvements for on-site RES production5 - Very important4 - Important1 - Unimportant5 - Very important4 - Important3 - Moderately important5 - Very important
              C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock5 - Very important4 - Important2 - Slightly important5 - Very important5 - Very important1 - Unimportant5 - Very important
              C1P001: Energy Communities, P2P, Prosumers concepts5 - Very important4 - Important3 - Moderately important5 - Very important3 - Moderately important5 - Very important4 - Important
              C1P001: Storage systems and E-mobility market penetration4 - Important2 - Slightly important3 - Moderately important3 - Moderately important5 - Very important4 - Important
              C1P001: Decreasing costs of innovative materials4 - Important3 - Moderately important1 - Unimportant4 - Important4 - Important1 - Unimportant4 - Important
              C1P001: Financial mechanisms to reduce costs and maximize benefits4 - Important4 - Important1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important5 - Very important
              C1P001: The ability to predict Multiple Benefits4 - Important3 - Moderately important2 - Slightly important4 - Important2 - Slightly important4 - Important
              C1P001: The ability to predict the distribution of benefits and impacts4 - Important3 - Moderately important3 - Moderately important4 - Important4 - Important4 - Important
              C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)5 - Very important4 - Important2 - Slightly important4 - Important5 - Very important4 - Important5 - Very important
              C1P001: Social acceptance (top-down)5 - Very important4 - Important4 - Important3 - Moderately important5 - Very important4 - Important4 - Important
              C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)3 - Moderately important4 - Important3 - Moderately important5 - Very important4 - Important4 - Important5 - Very important
              C1P001: Presence of integrated urban strategies and plans3 - Moderately important5 - Very important4 - Important3 - Moderately important5 - Very important5 - Very important4 - Important
              C1P001: Multidisciplinary approaches available for systemic integration3 - Moderately important4 - Important4 - Important5 - Very important5 - Very important4 - Important4 - Important
              C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects4 - Important4 - Important4 - Important3 - Moderately important4 - Important1 - Unimportant4 - Important
              C1P001: Availability of RES on site (Local RES)4 - Important3 - Moderately important5 - Very important5 - Very important5 - Very important5 - Very important
              C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders4 - Important4 - Important3 - Moderately important2 - Slightly important2 - Slightly important3 - Moderately important4 - Important
              C1P001: Any other UNLOCKING FACTORS1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P001: Any other UNLOCKING FACTORS (if any)
              C1P002: Driving Factors
              C1P002: Climate Change adaptation need4 - Important5 - Very important5 - Very important5 - Very important5 - Very important3 - Moderately important5 - Very important
              C1P002: Climate Change mitigation need (local RES production and efficiency)5 - Very important4 - Important4 - Important5 - Very important5 - Very important3 - Moderately important5 - Very important
              C1P002: Rapid urbanization trend and need of urban expansions1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important3 - Moderately important2 - Slightly important3 - Moderately important
              C1P002: Urban re-development of existing built environment3 - Moderately important4 - Important3 - Moderately important5 - Very important4 - Important1 - Unimportant4 - Important
              C1P002: Economic growth need2 - Slightly important4 - Important1 - Unimportant4 - Important4 - Important1 - Unimportant4 - Important
              C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)3 - Moderately important4 - Important3 - Moderately important5 - Very important1 - Unimportant1 - Unimportant5 - Very important
              C1P002: Territorial and market attractiveness2 - Slightly important4 - Important4 - Important5 - Very important1 - Unimportant1 - Unimportant4 - Important
              C1P002: Energy autonomy/independence5 - Very important4 - Important4 - Important1 - Unimportant2 - Slightly important2 - Slightly important5 - Very important
              C1P002: Any other DRIVING FACTOR1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P002: Any other DRIVING FACTOR (if any)
              C1P003: Administrative barriers
              C1P003: Difficulty in the coordination of high number of partners and authorities4 - Important5 - Very important2 - Slightly important5 - Very important4 - Important1 - Unimportant5 - Very important
              C1P003: Lack of good cooperation and acceptance among partners3 - Moderately important4 - Important2 - Slightly important5 - Very important4 - Important1 - Unimportant5 - Very important
              C1P003: Lack of public participation3 - Moderately important3 - Moderately important1 - Unimportant2 - Slightly important3 - Moderately important1 - Unimportant4 - Important
              C1P003: Lack of institutions/mechanisms to disseminate information3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important4 - Important
              C1P003:Long and complex procedures for authorization of project activities5 - Very important5 - Very important1 - Unimportant4 - Important5 - Very important1 - Unimportant5 - Very important
              C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy4 - Important4 - Important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important
              C1P003: Complicated and non-comprehensive public procurement4 - Important4 - Important1 - Unimportant3 - Moderately important5 - Very important1 - Unimportant4 - Important
              C1P003: Fragmented and or complex ownership structure3 - Moderately important5 - Very important1 - Unimportant2 - Slightly important4 - Important1 - Unimportant4 - Important
              C1P003: City administration & cross-sectoral attitude/approaches (silos)3 - Moderately important5 - Very important1 - Unimportant5 - Very important5 - Very important1 - Unimportant5 - Very important
              C1P003: Lack of internal capacities to support energy transition3 - Moderately important4 - Important1 - Unimportant1 - Unimportant5 - Very important1 - Unimportant5 - Very important
              C1P003: Any other Administrative BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P003: Any other Administrative BARRIER (if any)
              C1P004: Policy barriers
              C1P004: Lack of long-term and consistent energy plans and policies4 - Important3 - Moderately important1 - Unimportant5 - Very important5 - Very important4 - Important5 - Very important
              C1P004: Lacking or fragmented local political commitment and support on the long term4 - Important3 - Moderately important1 - Unimportant5 - Very important5 - Very important4 - Important5 - Very important
              C1P004: Lack of Cooperation & support between national-regional-local entities3 - Moderately important3 - Moderately important1 - Unimportant2 - Slightly important4 - Important1 - Unimportant5 - Very important
              C1P004: Any other Political BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P004: Any other Political BARRIER (if any)
              C1P005: Legal and Regulatory barriers
              C1P005: Inadequate regulations for new technologies4 - Important4 - Important1 - Unimportant5 - Very important4 - Important1 - Unimportant5 - Very important
              C1P005: Regulatory instability3 - Moderately important4 - Important1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant5 - Very important
              C1P005: Non-effective regulations4 - Important4 - Important1 - Unimportant2 - Slightly important2 - Slightly important1 - Unimportant4 - Important
              C1P005: Unfavorable local regulations for innovative technologies3 - Moderately important4 - Important1 - Unimportant3 - Moderately important4 - Important1 - Unimportant4 - Important
              C1P005: Building code and land-use planning hindering innovative technologies4 - Important4 - Important1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant4 - Important
              C1P005: Insufficient or insecure financial incentives4 - Important4 - Important1 - Unimportant5 - Very important3 - Moderately important3 - Moderately important5 - Very important
              C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation4 - Important4 - Important1 - Unimportant1 - Unimportant2 - Slightly important1 - Unimportant3 - Moderately important
              C1P005: Shortage of proven and tested solutions and examples3 - Moderately important1 - Unimportant4 - Important4 - Important1 - Unimportant4 - Important
              C1P005: Any other Legal and Regulatory BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P005: Any other Legal and Regulatory BARRIER (if any)
              C1P006: Environmental barriers
              C1P006: Environmental barriersUrban area very high buildings (and apartment) density and thus, less available space for renewable sources.?2 - Slightly importantAir Quality Management Importance Level: 5 (Very Important) Energy Efficiency Importance Level: 5 (Very Important) Water Conservation Importance Level: 5 (Very Important) Waste Management Importance Level: 4 (Important) Material Selection Importance Level: 4 (Important) Renewable Energy Integration Importance Level: 5 (Very Important) Heat Island Effect Mitigation Importance Level: 4 (Important) Noise Pollution Control Importance Level: 3 (Moderately Important)
              C1P007: Technical barriers
              C1P007: Lack of skilled and trained personnel4 - Important4 - Important2 - Slightly important5 - Very important4 - Important1 - Unimportant5 - Very important
              C1P007: Deficient planning3 - Moderately important3 - Moderately important1 - Unimportant3 - Moderately important4 - Important3 - Moderately important5 - Very important
              C1P007: Retrofitting work in dwellings in occupied state4 - Important4 - Important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important
              C1P007: Lack of well-defined process4 - Important4 - Important1 - Unimportant4 - Important2 - Slightly important1 - Unimportant4 - Important
              C1P007: Inaccuracy in energy modelling and simulation4 - Important4 - Important1 - Unimportant2 - Slightly important2 - Slightly important5 - Very important5 - Very important
              C1P007: Lack/cost of computational scalability4 - Important4 - Important1 - Unimportant1 - Unimportant3 - Moderately important1 - Unimportant3 - Moderately important
              C1P007: Grid congestion, grid instability4 - Important4 - Important1 - Unimportant4 - Important5 - Very important1 - Unimportant5 - Very important
              C1P007: Negative effects of project intervention on the natural environment3 - Moderately important3 - Moderately important1 - Unimportant5 - Very important2 - Slightly important1 - Unimportant5 - Very important
              C1P007: Energy retrofitting work in dense and/or historical urban environment5 - Very important4 - Important1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant4 - Important
              C1P007: Difficult definition of system boundaries3 - Moderately important4 - Important1 - Unimportant2 - Slightly important1 - Unimportant1 - Unimportant4 - Important
              C1P007: Any other Thecnical BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P007: Any other Thecnical BARRIER (if any)
              C1P008: Social and Cultural barriers
              C1P008: Inertia4 - Important3 - Moderately important1 - Unimportant3 - Moderately important2 - Slightly important1 - Unimportant4 - Important
              C1P008: Lack of values and interest in energy optimization measurements5 - Very important3 - Moderately important1 - Unimportant4 - Important5 - Very important1 - Unimportant5 - Very important
              C1P008: Low acceptance of new projects and technologies5 - Very important3 - Moderately important1 - Unimportant2 - Slightly important5 - Very important1 - Unimportant5 - Very important
              C1P008: Difficulty of finding and engaging relevant actors5 - Very important3 - Moderately important1 - Unimportant5 - Very important4 - Important4 - Important4 - Important
              C1P008: Lack of trust beyond social network4 - Important4 - Important1 - Unimportant3 - Moderately important5 - Very important1 - Unimportant4 - Important
              C1P008: Rebound effect4 - Important4 - Important1 - Unimportant1 - Unimportant4 - Important1 - Unimportant3 - Moderately important
              C1P008: Hostile or passive attitude towards environmentalism5 - Very important3 - Moderately important1 - Unimportant4 - Important3 - Moderately important1 - Unimportant5 - Very important
              C1P008: Exclusion of socially disadvantaged groups2 - Slightly important3 - Moderately important1 - Unimportant4 - Important3 - Moderately important1 - Unimportant5 - Very important
              C1P008: Non-energy issues are more important and urgent for actors3 - Moderately important4 - Important1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant4 - Important
              C1P008: Hostile or passive attitude towards energy collaboration3 - Moderately important1 - Unimportant3 - Moderately important3 - Moderately important1 - Unimportant5 - Very important
              C1P008: Any other Social BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P008: Any other Social BARRIER (if any)
              C1P009: Information and Awareness barriers
              C1P009: Insufficient information on the part of potential users and consumers4 - Important1 - Unimportant4 - Important3 - Moderately important5 - Very important5 - Very important
              C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts4 - Important1 - Unimportant4 - Important3 - Moderately important1 - Unimportant5 - Very important
              C1P009: Lack of awareness among authorities4 - Important1 - Unimportant3 - Moderately important5 - Very important3 - Moderately important5 - Very important
              C1P009: Information asymmetry causing power asymmetry of established actors4 - Important1 - Unimportant2 - Slightly important5 - Very important2 - Slightly important4 - Important
              C1P009: High costs of design, material, construction, and installation4 - Important5 - Very important5 - Very important5 - Very important1 - Unimportant4 - Important
              C1P009: Any other Information and Awareness BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P009: Any other Information and Awareness BARRIER (if any)
              C1P010: Financial barriers
              C1P010: Hidden costs4 - Important1 - Unimportant3 - Moderately important5 - Very important1 - Unimportant4 - Important
              C1P010: Insufficient external financial support and funding for project activities4 - Important1 - Unimportant2 - Slightly important5 - Very important1 - Unimportant5 - Very important
              C1P010: Economic crisis4 - Important4 - Important5 - Very important5 - Very important1 - Unimportant4 - Important
              C1P010: Risk and uncertainty4 - Important1 - Unimportant5 - Very important5 - Very important2 - Slightly important5 - Very important
              C1P010: Lack of consolidated and tested business models4 - Important1 - Unimportant4 - Important5 - Very important4 - Important4 - Important
              C1P010: Limited access to capital and cost disincentives4 - Important1 - Unimportant5 - Very important5 - Very important1 - Unimportant5 - Very important
              C1P010: Any other Financial BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P010: Any other Financial BARRIER (if any)
              C1P011: Market barriers
              C1P011: Split incentives5 - Very important1 - Unimportant3 - Moderately important4 - Important1 - Unimportant5 - Very important
              C1P011: Energy price distortion4 - Important1 - Unimportant3 - Moderately important4 - Important1 - Unimportant5 - Very important
              C1P011: Energy market concentration, gatekeeper actors (DSOs)4 - Important1 - Unimportant2 - Slightly important3 - Moderately important1 - Unimportant4 - Important
              C1P011: Any other Market BARRIER1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant1 - Unimportant3 - Moderately important
              C1P011: Any other Market BARRIER (if any)
              C1P012: Stakeholders involved
              C1P012: Government/Public Authorities
              • Planning/leading
              • Planning/leading,
              • Monitoring/operation/management
              • Monitoring/operation/management
              • Design/demand aggregation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Research & Innovation
              • Planning/leading,
              • Design/demand aggregation,
              • Monitoring/operation/management
              • Design/demand aggregation
              • Planning/leading
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Financial/Funding
              • Planning/leading,
              • Construction/implementation
              • Construction/implementation
              • None
              • Planning/leading,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Analyst, ICT and Big Data
              • Monitoring/operation/management
              • Monitoring/operation/management
              • None
              • Monitoring/operation/management
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Business process management
              • Design/demand aggregation,
              • Construction/implementation
              • None
              • Design/demand aggregation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Urban Services providers
              • Construction/implementation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              • None
              • Design/demand aggregation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Real Estate developers
              • Planning/leading
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              • Design/demand aggregation
              • Construction/implementation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Design/Construction companies
              • Design/demand aggregation,
              • Construction/implementation
              • Design/demand aggregation,
              • Construction/implementation
              • None
              • Design/demand aggregation
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: End‐users/Occupants/Energy Citizens
              • Planning/leading,
              • Design/demand aggregation
              • Monitoring/operation/management
              • Monitoring/operation/management
              • Monitoring/operation/management
              • Monitoring/operation/management
              C1P012: Social/Civil Society/NGOs
              • Planning/leading
              • None
              • Monitoring/operation/management
              • Design/demand aggregation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Industry/SME/eCommerce
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              • None
              • Construction/implementation
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Other
              • Planning/leading,
              • Design/demand aggregation,
              • Construction/implementation,
              • Monitoring/operation/management
              C1P012: Other (if any)
              Summary

              Authors (framework concept)

              Beril Alpagut (Demir Energy); Giulia Turci (University of Bologna); Michal Kuzmic (Czech Technical University in Prague); Paolo Civiero (Università Roma Tre); Serena Pagliulia (University of Bologna); Oscar Seco (CIEMAT); Silvia Soutullo (CIEMAT); Daniele Vettorato (EURAC Research, IEA Annex 83); Bailador Ferreras M. Almudena (CIEMAT); Vicky Albert-Seifried (FHG ISE)

              Contributors (to the content)

              Laura Aelenei (LNEG), Nienke Maas (TNO), Savis Gohari (OsloMet), Andras Reith (ABUD), Ghazal Etminan (AIT), Maria-Beatrice Andreucci (Universita Sapienza), Francesco Reda (VTT, IEA Annex 83), Mari Hukkalainen (VTT), Judith-Borsboom (Locality), Gilda Massa (ENEA), Jelena Ziemele (University of Latvia), Nikola Pokorny (CVUT), Sergio Diaz de Garayo Balsategui (CENER, IEA Annex 83), Matthias Haaze (ZHAW, IEA Annex 83), Christoph Gollner (FFG, JPI UE), Silvia Bossi (ENEA, JPI UE), Christian Winzer (Zurich University of Applied Science), George Martinopoulos (Centre for Research and Technology Hellas), Maria Nuria Sánchez (CIEMAT), Angelina Tomova (Energy Agency of Plovdiv)

              Implemented by

              Boutik.pt: Filipe Martins, Jamal Khan
              Marek Suchánek (Czech Technical University in Prague)