A1P001: Name of the PED case study / PED Lab |
A1P001: Name of the PED case study / PED Lab
|
|
Smart Energy Åland
|
A1P002: Map / aerial view / photos / graphic details / leaflet |
A1P002: Map / aerial view / photos / graphic details / leaflet
|
|
|
A1P003: Categorisation of the PED site |
PED case study
|
|
|
A1P004: Targets of the PED case study / PED Lab |
Climate neutrality
|
|
|
Self-sufficiency (energy autonomous)
|
|
- Self-sufficiency (energy autonomous)
|
Other
|
|
|
A1P005: Phase of the PED case study / PED Lab |
A1P005: Project Phase of your case study/PED Lab
|
|
In operation
|
A1P006: Start Date |
A1P006: Start date
|
|
01/94
|
A1P010: Sources |
Any publication, link to website, deliverable referring to the PED/PED Lab
|
|
- https://flexens.com/
- https://smartenergy.ax/om-smart-energy-aland/
|
A1P011: Geographic coordinates |
X Coordinate (longitude):
|
|
60.2166218
|
Y Coordinate (latitude):
|
|
19.9438638
|
A1P012: Country |
A1P012: Country
|
|
Finland
|
A1P013: City |
A1P013: City
|
|
Åland
|
A1P014: Climate Zone (Köppen Geiger classification) |
A1P014: Climate Zone (Köppen Geiger classification).
|
|
Dfb
|
A1P016: Ownership of the case study/PED Lab |
A1P016: Ownership of the case study/PED Lab:
|
|
Mixed
|
A1P017: Ownership of the land / physical infrastructure |
A1P017: Ownership of the land / physical infrastructure:
|
|
Multiple Owners
|
A1P021: Floor area ratio: Conditioned space / total ground area |
A1P021: Floor area ratio: Conditioned space / total ground area
|
|
0
|
Contact person for general enquiries |
A1P026: Name
|
|
Christoph Gollner
|
A1P027: Organization
|
|
FFG
|
A1P028: Affiliation
|
|
Other
|
A1P029: Email
|
|
christoph.gollner@ffg.at
|
Contact person for other special topics |
Pursuant to the General Data Protection Regulation
|
|
Yes
|
A2P001: Fields of application |
A2P001: Fields of application
|
|
- Energy efficiency
- Energy production
|
A2P011: Annual renewable electricity production on-site during target year |
A2P011: PV
|
|
|
A2P011: Wind
|
|
|
A2P012: Annual renewable thermal production on-site during target year |
A2P012: Geothermal
|
|
|
A2P012: Solar Thermal
|
|
|
A2P020: Share of RES on-site / RES outside the boundary |
A2P020: Share of RES on-site / RES outside the boundary
|
|
0
|
A2P023: Technological Solutions / Innovations – Energy Generation |
A2P023: Photovoltaics
|
|
|
A2P023: Solar thermal collectors
|
|
|
A2P023: Wind Turbines
|
|
|
A2P023: Geothermal energy system
|
|
|
A2P024: Technological Solutions / Innovations – Energy Flexibility |
A2P024: Smart electricity grid
|
|
|
A2P024: Electric Storage
|
|
|
A2P026: Technological Solutions / Innovations – Mobility |
A2P026: Efficiency of vehicles (public and/or private)
|
|
- Efficiency of vehicles (public and/or private)
|
A2P026: e-Mobility
|
|
|
A3P007: Social models |
A3P007: Social models
|
|
- Citizen/owner involvement in planning and maintenance
|
B1P004: Type of district |
B2P004: Type of district
|
|
- New construction
- Renovation
|
B1P005: Case Study Context |
B1P005: Case Study Context
|
|
|
B1P011: Population density before intervention |
B1P011: Population density before intervention
|
|
0
|
B1P012: Population density after intervention |
B1P012: Population density after intervention
|
|
0
|
B1P013: Building and Land Use before intervention |
B1P013: Residential
|
|
|
B1P013: Industry and Utility
|
|
|
B1P013: Commercial
|
|
|
B1P013: Natural areas
|
|
|
B1P014: Building and Land Use after intervention |
B1P014: Residential
|
|
|
B1P014: Industry and Utility
|
|
|
B1P014: Commercial
|
|
|
B1P014: Natural areas
|
|
|
C1P001: Unlocking Factors |
C1P001: Recent technological improvements for on-site RES production
|
|
1 – Unimportant
|
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock
|
|
1 – Unimportant
|
C1P001: Energy Communities, P2P, Prosumers concepts
|
|
1 – Unimportant
|
C1P001: Storage systems and E-mobility market penetration
|
|
1 – Unimportant
|
C1P001: Decreasing costs of innovative materials
|
|
1 – Unimportant
|
C1P001: Financial mechanisms to reduce costs and maximize benefits
|
|
1 – Unimportant
|
C1P001: The ability to predict Multiple Benefits
|
|
1 – Unimportant
|
C1P001: The ability to predict the distribution of benefits and impacts
|
|
1 – Unimportant
|
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)
|
|
1 – Unimportant
|
C1P001: Social acceptance (top-down)
|
|
1 – Unimportant
|
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)
|
|
1 – Unimportant
|
C1P001: Presence of integrated urban strategies and plans
|
|
1 – Unimportant
|
C1P001: Multidisciplinary approaches available for systemic integration
|
|
1 – Unimportant
|
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects
|
|
1 – Unimportant
|
C1P001: Availability of RES on site (Local RES)
|
|
1 – Unimportant
|
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders
|
|
1 – Unimportant
|
C1P001: Any other UNLOCKING FACTORS
|
|
1 – Unimportant
|
C1P002: Driving Factors |
C1P002: Climate Change adaptation need
|
|
1 – Unimportant
|
C1P002: Climate Change mitigation need (local RES production and efficiency)
|
|
1 – Unimportant
|
C1P002: Rapid urbanization trend and need of urban expansions
|
|
1 – Unimportant
|
C1P002: Urban re-development of existing built environment
|
|
1 – Unimportant
|
C1P002: Economic growth need
|
|
1 – Unimportant
|
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)
|
|
1 – Unimportant
|
C1P002: Territorial and market attractiveness
|
|
1 – Unimportant
|
C1P002: Energy autonomy/independence
|
|
1 – Unimportant
|
C1P002: Any other DRIVING FACTOR
|
|
1 – Unimportant
|
C1P003: Administrative barriers |
C1P003: Difficulty in the coordination of high number of partners and authorities
|
|
1 – Unimportant
|
C1P003: Lack of good cooperation and acceptance among partners
|
|
1 – Unimportant
|
C1P003: Lack of public participation
|
|
1 – Unimportant
|
C1P003: Lack of institutions/mechanisms to disseminate information
|
|
1 – Unimportant
|
C1P003:Long and complex procedures for authorization of project activities
|
|
1 – Unimportant
|
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy
|
|
1 – Unimportant
|
C1P003: Complicated and non-comprehensive public procurement
|
|
1 – Unimportant
|
C1P003: Fragmented and or complex ownership structure
|
|
1 – Unimportant
|
C1P003: City administration & cross-sectoral attitude/approaches (silos)
|
|
1 – Unimportant
|
C1P003: Lack of internal capacities to support energy transition
|
|
1 – Unimportant
|
C1P003: Any other Administrative BARRIER
|
|
1 – Unimportant
|
C1P004: Policy barriers |
C1P004: Lack of long-term and consistent energy plans and policies
|
|
1 – Unimportant
|
C1P004: Lacking or fragmented local political commitment and support on the long term
|
|
1 – Unimportant
|
C1P004: Lack of Cooperation & support between national-regional-local entities
|
|
1 – Unimportant
|
C1P004: Any other Political BARRIER
|
|
1 – Unimportant
|
C1P005: Legal and Regulatory barriers |
C1P005: Inadequate regulations for new technologies
|
|
1 – Unimportant
|
C1P005: Regulatory instability
|
|
1 – Unimportant
|
C1P005: Non-effective regulations
|
|
1 – Unimportant
|
C1P005: Unfavorable local regulations for innovative technologies
|
|
1 – Unimportant
|
C1P005: Building code and land-use planning hindering innovative technologies
|
|
1 – Unimportant
|
C1P005: Insufficient or insecure financial incentives
|
|
1 – Unimportant
|
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation
|
|
1 – Unimportant
|
C1P005: Shortage of proven and tested solutions and examples
|
|
1 – Unimportant
|
C1P005: Any other Legal and Regulatory BARRIER
|
|
1 – Unimportant
|
C1P007: Technical barriers |
C1P007: Lack of skilled and trained personnel
|
|
1 – Unimportant
|
C1P007: Deficient planning
|
|
1 – Unimportant
|
C1P007: Retrofitting work in dwellings in occupied state
|
|
1 – Unimportant
|
C1P007: Lack of well-defined process
|
|
1 – Unimportant
|
C1P007: Inaccuracy in energy modelling and simulation
|
|
1 – Unimportant
|
C1P007: Lack/cost of computational scalability
|
|
1 – Unimportant
|
C1P007: Grid congestion, grid instability
|
|
1 – Unimportant
|
C1P007: Negative effects of project intervention on the natural environment
|
|
1 – Unimportant
|
C1P007: Energy retrofitting work in dense and/or historical urban environment
|
|
1 – Unimportant
|
C1P007: Difficult definition of system boundaries
|
|
1 – Unimportant
|
C1P007: Any other Thecnical BARRIER
|
|
1 – Unimportant
|
C1P008: Social and Cultural barriers |
C1P008: Inertia
|
|
1 – Unimportant
|
C1P008: Lack of values and interest in energy optimization measurements
|
|
1 – Unimportant
|
C1P008: Low acceptance of new projects and technologies
|
|
1 – Unimportant
|
C1P008: Difficulty of finding and engaging relevant actors
|
|
1 – Unimportant
|
C1P008: Lack of trust beyond social network
|
|
1 – Unimportant
|
C1P008: Rebound effect
|
|
1 – Unimportant
|
C1P008: Hostile or passive attitude towards environmentalism
|
|
1 – Unimportant
|
C1P008: Exclusion of socially disadvantaged groups
|
|
1 – Unimportant
|
C1P008: Non-energy issues are more important and urgent for actors
|
|
1 – Unimportant
|
C1P008: Hostile or passive attitude towards energy collaboration
|
|
1 – Unimportant
|
C1P008: Any other Social BARRIER
|
|
1 – Unimportant
|
C1P009: Information and Awareness barriers |
C1P009: Insufficient information on the part of potential users and consumers
|
|
1 – Unimportant
|
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts
|
|
1 – Unimportant
|
C1P009: Lack of awareness among authorities
|
|
1 – Unimportant
|
C1P009: Information asymmetry causing power asymmetry of established actors
|
|
1 – Unimportant
|
C1P009: High costs of design, material, construction, and installation
|
|
1 – Unimportant
|
C1P009: Any other Information and Awareness BARRIER
|
|
1 – Unimportant
|
C1P010: Financial barriers |
C1P010: Hidden costs
|
|
1 – Unimportant
|
C1P010: Insufficient external financial support and funding for project activities
|
|
1 – Unimportant
|
C1P010: Economic crisis
|
|
1 – Unimportant
|
C1P010: Risk and uncertainty
|
|
1 – Unimportant
|
C1P010: Lack of consolidated and tested business models
|
|
1 – Unimportant
|
C1P010: Limited access to capital and cost disincentives
|
|
1 – Unimportant
|
C1P010: Any other Financial BARRIER
|
|
1 – Unimportant
|
C1P011: Market barriers |
C1P011: Split incentives
|
|
1 – Unimportant
|
C1P011: Energy price distortion
|
|
1 – Unimportant
|
C1P011: Energy market concentration, gatekeeper actors (DSOs)
|
|
1 – Unimportant
|
C1P011: Any other Market BARRIER
|
|
1 – Unimportant
|