A1P001: Name of the PED case study / PED Lab
|
|
Municipality of Kifissia – Energy community with the participation of the Municipality and the citizens
|
A1P002: Map / aerial view / photos / graphic details / leaflet
|
|
|
A1P003: Categorisation of the PED site |
PED relevant case study
|
|
- PED/PED relevant case study.
|
A1P004: Targets of the PED case study / PED Lab |
Energy community
|
|
|
Air quality and urban comfort
|
|
- Air quality and urban comfort
|
Electrification
|
|
|
A1P005: Phase of the PED case study / PED Lab |
A1P005: Project Phase of your case study/PED Lab
|
|
Planning Phase
|
A1P006: Strart Date |
A1P006: Start date
|
|
07/01/2021
|
A1P009: Data availability |
A1P009: Data availability
|
|
Monitoring data available within the districts
|
A1P011: Geographic coordinates |
X Coordinate (longitude):
|
|
38.077349
|
Y Coordinate (latitude):
|
|
23.814588
|
A1P012: Country |
A1P012: Country
|
|
Greece
|
A1P013: City |
A1P013: City
|
|
Municipality of Kifissia
|
A1Q2B: Place (georeferenced position): |
A1Q2B: Place (georeferenced position):
|
|
Greece
|
A1P014: Climate Zone (Köppen Geiger classification). |
CS011: Climate Zone (Köppen Geiger classification).
|
|
Csa
|
A1P015: District boundary |
A1P015: District boundary
|
|
Virtual
|
Other
|
|
The energy will be produced by a PV plant installed on the terrace of a municipal building. Members of the energy community (that is under formation) will benefit from the energy produced via virtual net metering. PV instalment and the buildings (owned by the members of the community) will be within the boundaries of the Municipality but not necessary in the same area/district/neighbourhood
|
A1P016: Ownership of the case study/PED Lab: |
A1P016: Ownership of the case study/PED Lab:
|
|
|
A1P017: Ownership of the land / physical infrastructure: |
A1P017: Ownership of the land / physical infrastructure:
|
|
|
A1P021: Floor area ratio: Conditioned space / total ground area |
A1P021: Floor area ratio: Conditioned space / total ground area
|
|
0
|
A1P022: Financial schemes |
A1P022: Financial schemes
|
|
Financing – PRIVATE – Other
|
A1P022: Please specify (if other)
|
|
Self -financed by members of the Energy community (proposal)
|
A1P023: Economic Targets |
A1P023: Economic Targets
|
|
Boosting Local and sustainable production
|
A1P024: More comments: |
A1P024: More comments:
|
|
The project consists the establishment of an energy community with the participation of the Municipality and citizens. The community will not be in a geographical limited area (within the boundaries of the Municipality). Each member of the community (owners of houses/apartments etc, around the city) will benefit from the energy produced from a pv system via virtual net metering (the initial pv system will be installed on the terrace of a municipal owned building). Energy production could be increased with future RES instalments. Initial PV plant will generate (approximately) 150000kwh/year
|
Contact person for general enquiries |
A1P026: Name
|
|
Artemis Giavasoglou, Kleopatra Kalampoka
|
A1P027: Organization
|
|
Municipality of Kifissia – SPARCS local team
|
A1P028: Affiliation
|
|
Municipality / Public Bodies
|
A1P029: Email
|
|
giavasoglou@kifissia.gr
|
A1P030: Contact person for other special topics |
A1P030: Name
|
|
Stavros Zapantis – vice mayor
|
A1P031: Email
|
|
stavros.zapantis@gmail.com
|
A2P001: Fields of application |
A2P001: Fields of application
|
|
- Energy production
- Digital technologies.
|
A2P002: Tools/strategies/methods applied |
A2P002: Tools/strategies/methods applied
|
|
Energy production: Establish an Energy community and produce energy via RES, installation of a PV system within the Municipality (virtual net metering)
|
A2P003: Application of ISO52000 |
A2P003: Application of ISO52000
|
|
No
|
A2P004: Appliances included in the calculation of the energy balance |
A2P004: Appliances included in the calculation of the energy balance
|
|
No
|
A2P005: Mobility included in the calculation of the energy balance |
A2P005: Mobility included in the calculation of the energy balance
|
|
No
|
A2P006: Description of how mobility is included (or not included) in the calculation |
A2P006: Description of how mobility is included (or not included) in the calculation
|
|
Mobility, till now, is not included in the energy model.
|
A2P011: Annual renewable electricity production on-site during target year |
A2P011: Annual renewable electricity production on-site during target year
|
|
|
A2P011: Please specify production in GWh/annum
|
|
150
|
A2P024: Technological Solutions / Innovations – Energy Flexibility |
A2P024: Information and Communication Technologies (ICT)
|
|
apply
|
A2P028: Energy efficiency certificates |
A2P028: Energy efficiency certificates
|
|
Yes
|
A2P028: If yes, please specify and/or enter notes
|
|
Energy Performance Certificate – in Greece it is mandatory in order to buy or rent a house or a dwelling
|
A2P029: Any other building / district certificates |
A2P029: Any other building / district certificates
|
|
No
|
A3P001: Relevant city /national strategy |
A3P001: Relevant city /national strategy
|
|
- Energy master planning (SECAP, etc.)
- Promotion of energy communities (REC/CEC)
|
A3P002: Quantitative targets included in the city / national strategy |
A3P002: Quantitative targets included in the city / national strategy
|
|
SEAP – reduction of 40% of CO2 emissions until 2030 32% of energy reduction NECP – 35% of share of renewable energy in gross final energy consumption by 2030 Reduce GHG more than 56% compared to emission in 2005
|
A3P004: Identification of needs and priorities |
A3P004: Identification of needs and priorities
|
|
Buildings in Kifissia are one of the two most energy demanding and CO2 emitting areas (the other is mobility). Most of the building stock is private owned and constructed before the energy efficiency regulations in Greece (2010), using oil or gas to cover their thermal needs. In addition, installing solar panels in each house/ building apartment could be challenging because inclined roof with tiles is mandatory in houses by local architectural regulations. Using the terrace of a municipal building to install the pv system provides a solution as to the area needed (and technical issues, inclination for maximize solar exposure etc) for the members of the energy community.
|
A3P005: Sustainable behaviour |
A3P005: Sustainable behaviour
|
|
Through the energy community dissemination actions for energy efficiency and renewable energy production could be achieved, with the goal to add more RES in the future and maybe helping establish more energy communities and achieve a net zero GHG.
|
A3P010: Legal / Regulatory aspects |
A3P010: Legal / Regulatory aspects
|
|
Law 4513/2018 about Energy communities
|
B2P003: Environment of the case study area |
B2P003: Environment of the case study area
|
|
Urban area
|
B1P011: Population density before intervention |
B1P011: Population density before intervention
|
|
0
|
B1P012: Population density after intervention |
B1P012: Population density after intervention
|
|
0
|