A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED Lab
  Évora, Portugal (Lighthouse city 1 – POCITYF)
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
 

A1P003: Categorisation of the PED site
PED relevant case study
 

  • PED relevant case study

PED Lab.
 

  • PED Lab.

A1P004: Targets of the PED case study / PED Lab
Annual energy surplus
 

  • Annual energy surplus

Energy community
 

  • Energy community

A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED Lab
  Implementation Phase
A1P006: Start Date
A1P006: Start date
  10/19
A1P007: End Date
A1P007: End date
  09/24
A1P008: Reference Project
A1P008: Reference Project
 

  • POCITYF – A POsitive Energy CITY Transformation Framework

A1P009: Data availability
A1P009: Data availability
 

  • Open data city platform – different dashboards

A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
 

  • https://pocityf.eu/
  • https://cordis.europa.eu/project/id/864400

A1P011: Geographic coordinates
X Coordinate (longitude):
  -7.909377
Y Coordinate (latitude):
  38.570804
A1P012: Country
A1P012: Country
  Portugal
A1P013: City
A1P013: City
  Évora
A1P014: Climate Zone (Köppen Geiger classification).
A1P014: Climate Zone (Köppen Geiger classification).
  Csa
A1P015: District boundary
A1P015: District boundary
  Geographic
A1P016: Ownership of the case study/PED Lab:
A1P016: Ownership of the case study/PED Lab:
  Mixed
A1P017: Ownership of the land / physical infrastructure:
A1P017: Ownership of the land / physical infrastructure:
  Multiple Owners
A1P021: Floor area ratio: Conditioned space / total ground area
A1P021: Floor area ratio: Conditioned space / total ground area
  0
A1P022: Financial schemes
A1P022i: Financing – RESEARCH FUNDING – EU
 

  • Financing – RESEARCH FUNDING – EU

A1P022i: Add the value in EUR if available
  19,998,275
Contact person for general enquiries
A1P026: Name
  João Bravo Dias
A1P027: Organization
  EDP Labelec
A1P028: Affiliation
  SME / Industry
A1P029: Email
  joao.bravodias@edp.pt
Pursuant to the General Data Protection Regulation: Do you agree to have the information disclosed in this form, processed, stored and made publicly available by the COST Action PED-EU-NET? The names and contact information (name of the contact person, contact-email of the contact person, name of the project manager and contact e-mail of the project manager) may be used by PED-EU-NET members and external partners (Annex 83 and JPI UE) for further clarifications and updates. It is not possible to continue without providing consent.
Pursuant to the General Data Protection Regulation
  Yes
A2P001: Fields of application
A2P001: Fields of application
 

  • Energy efficiency
  • Energy flexibility
  • Energy production
  • E-mobility
  • Digital technologies
  • Waste management
  • Construction materials

A2P003: Application of ISO52000
A2P003: Application of ISO52000
  No
A2P004: Appliances included in the calculation of the energy balance
A2P004: Appliances included in the calculation of the energy balance
  Yes
A2P005: Mobility included in the calculation of the energy balance
A2P005: Mobility included in the calculation of the energy balance
  Yes
A2P020: Share of RES on-site / RES outside the boundary
A2P020: Share of RES on-site / RES outside the boundary
  0
A2P023: Technological Solutions / Innovations – Energy Generation
A2P023: Photovoltaics
 

  • Photovoltaics

A2P023: Solar thermal collectors
 

  • Solar thermal collectors

A2P024: Technological Solutions / Innovations – Energy Flexibility
A2P024: A2P024: Information and Communication Technologies (ICT)
 

  • Information and Communication Technologies (ICT)

A2P024: Energy management system
 

  • Energy management system

A2P024: Smart electricity grid
 

  • Smart electricity grid

A2P024: Thermal Storage
 

  • Thermal Storage

A2P024: Electric Storage
 

  • Electric Storage

A2P024: Smart metering and demand-responsive control systems
 

  • Smart metering and demand-responsive control systems

A2P024: P2P – buildings
 

  • P2P – buildings

A2P025: Technological Solutions / Innovations – Energy Efficiency
A2P025: Energy efficiency measures in historic buildings
 

  • Energy efficiency measures in historic buildings

A2P025: Urban data platforms
 

  • Urban data platforms

A2P025: Mobile applications for citizens
 

  • Mobile applications for citizens

A2P025: Building services (HVAC & Lighting)
 

  • Building services (HVAC & Lighting)

A2P025: Digital tracking for waste disposal
 

  • Digital tracking for waste disposal

A2P025: Smart surveillance
 

  • Smart surveillance

A2P026: Technological Solutions / Innovations – Mobility
A2P026: e-Mobility
 

  • e-Mobility

A2P026: Soft mobility infrastructures and last mile solutions
 

  • Soft mobility infrastructures and last mile solutions

A2P028: Energy efficiency certificates
A2P028: Energy efficiency certificates
  No
A2P029: Any other building / district certificates
A2P029: Any other building / district certificates
  No
A3P001: Relevant city /national strategy
A3P001: Relevant city /national strategy
 

  • Energy master planning (SECAP, etc.)
  • Promotion of energy communities (REC/CEC)
  • Climate change adaption plan/strategy (e.g. Climate City contract)
  • National / international city networks addressing sustainable urban development and climate neutrality

B1P001: PED/PED relevant concept definition
B1P001: PED/PED relevant concept definition
  The PED main objective is to achieve the energy transition while preserving cultural heritage and improving citizen’s quality of life.
B1P002: Motivation behind PED/PED relevant project development
B1P002: Motivation behind PED/PED relevant project development
  POCITYF brings together eight cities (Lightouse and Fellow cities), all having cultural heritage areas in their territory. All are intrinsically motivated to participate in the necessary energy transition not only for their conventional city districts of mixed-used, but also for districts with individually specificities as those belonging in their cultural heritage, which at the moment may be acting as barriers for their further environmental sustainability, but after POCITYF will be acting as a promising building retrofits roadmap for similar and other EU cities.
B1P003: Environment of the case study area
B2P003: Environment of the case study area
  Urban area
B1P004: Type of district
B2P004: Type of district
 

  • Renovation

B1P005: Case Study Context
B1P005: Case Study Context
 

  • Preservation Area

B1P011: Population density before intervention
B1P011: Population density before intervention
  0
B1P012: Population density after intervention
B1P012: Population density after intervention
  0
B2P003: Scale of action
B2P003: Scale
  District
B2P011: Available facilities to test urban configurations in PED Lab
B2P011: Available facilities to test urban configurations in PED Lab
 

  • Buildings
  • Demand-side management
  • Prosumers
  • Renewable generation
  • Energy storage
  • Energy networks
  • Waste management
  • E-mobility
  • Social interactions
  • Circular economy models

B2P012: Incubation capacities of PED Lab
B2P012: Incubation capacities of PED Lab
 

  • Monitoring and evaluation infrastructure
  • Tools for prototyping and modelling
  • Tools, spaces, events for testing and validation

B2P015: Key Performance indicators
B2P015: Key Performance indicators
 

  • Energy

C1P001: Unlocking Factors
C1P001: Recent technological improvements for on-site RES production
  4 – Important
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock
  3 – Moderately important
C1P001: Energy Communities, P2P, Prosumers concepts
  5 – Very important
C1P001: Storage systems and E-mobility market penetration
  4 – Important
C1P001: Decreasing costs of innovative materials
  3 – Moderately important
C1P001: Financial mechanisms to reduce costs and maximize benefits
  4 – Important
C1P001: The ability to predict Multiple Benefits
  2 – Slightly important
C1P001: The ability to predict the distribution of benefits and impacts
  3 – Moderately important
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)
  3 – Moderately important
C1P001: Social acceptance (top-down)
  4 – Important
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)
  4 – Important
C1P001: Presence of integrated urban strategies and plans
  5 – Very important
C1P001: Multidisciplinary approaches available for systemic integration
  5 – Very important
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects
  4 – Important
C1P001: Availability of RES on site (Local RES)
  3 – Moderately important
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders
  4 – Important
C1P001: Any other UNLOCKING FACTORS
  1 – Unimportant
C1P002: Driving Factors
C1P002: Climate Change adaptation need
  5 – Very important
C1P002: Climate Change mitigation need (local RES production and efficiency)
  4 – Important
C1P002: Rapid urbanization trend and need of urban expansions
  1 – Unimportant
C1P002: Urban re-development of existing built environment
  3 – Moderately important
C1P002: Economic growth need
  4 – Important
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)
  3 – Moderately important
C1P002: Territorial and market attractiveness
  3 – Moderately important
C1P002: Energy autonomy/independence
  3 – Moderately important
C1P002: Any other DRIVING FACTOR
  1 – Unimportant
C1P003: Administrative barriers
C1P003: Difficulty in the coordination of high number of partners and authorities
  5 – Very important
C1P003: Lack of good cooperation and acceptance among partners
  3 – Moderately important
C1P003: Lack of public participation
  3 – Moderately important
C1P003: Lack of institutions/mechanisms to disseminate information
  3 – Moderately important
C1P003:Long and complex procedures for authorization of project activities
  5 – Very important
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy
  1 – Unimportant
C1P003: Complicated and non-comprehensive public procurement
  3 – Moderately important
C1P003: Fragmented and or complex ownership structure
  1 – Unimportant
C1P003: City administration & cross-sectoral attitude/approaches (silos)
  4 – Important
C1P003: Lack of internal capacities to support energy transition
  1 – Unimportant
C1P003: Any other Administrative BARRIER
  1 – Unimportant
C1P004: Policy barriers
C1P004: Lack of long-term and consistent energy plans and policies
  3 – Moderately important
C1P004: Lacking or fragmented local political commitment and support on the long term
  3 – Moderately important
C1P004: Lack of Cooperation & support between national-regional-local entiies
  2 – Slightly important
C1P004: Any other Political BARRIER
  1 – Unimportant
C1P005: Legal and Regulatory barriers
C1P005: Inadequate regulations for new technologies
  5 – Very important
C1P005: Regulatory instability
  1 – Unimportant
C1P005: Non-effective regulations
  1 – Unimportant
C1P005: Unfavorable local regulations for innovative technologies
  5 – Very important
C1P005: Building code and land-use planning hindering innovative technologies
  5 – Very important
C1P005: Insufficient or insecure financial incentives
  2 – Slightly important
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation
  1 – Unimportant
C1P005: Shortage of proven and tested solutions and examples
  5 – Very important
C1P005: Any other Legal and Regulatory BARRIER
  1 – Unimportant
C1P007: Technical barriers
C1P007: Lack of skilled and trained personnel
  2 – Slightly important
C1P007: Deficient planning
  2 – Slightly important
C1P007: Retrofitting work in dwellings in occupied state
  5 – Very important
C1P007: Lack of well-defined process
  1 – Unimportant
C1P007: Inaccuracy in energy modelling and simulation
  1 – Unimportant
C1P007: Lack/cost of computational scalability
  1 – Unimportant
C1P007: Grid congestion, grid instability
  1 – Unimportant
C1P007: Negative effects of project intervention on the natural environment
  1 – Unimportant
C1P007: Energy retrofitting work in dense and/or historical urban environment
  5 – Very important
C1P007: Difficult definition of system boundaries
  1 – Unimportant
C1P007: Any other Thecnical BARRIER
  1 – Unimportant
C1P008: Social and Cultural barriers
C1P008: Inertia
  1 – Unimportant
C1P008: Lack of values and interest in energy optimization measurements
  1 – Unimportant
C1P008: Low acceptance of new projects and technologies
  2 – Slightly important
C1P008: Difficulty of finding and engaging relevant actors
  1 – Unimportant
C1P008: Lack of trust beyond social network
  1 – Unimportant
C1P008: Rebound effect
  1 – Unimportant
C1P008: Hostile or passive attitude towards environmentalism
  1 – Unimportant
C1P008: Exclusion of socially disadvantaged groups
  1 – Unimportant
C1P008: Non-energy issues are more important and urgent for actors
  1 – Unimportant
C1P008: Any other Social BARRIER
  1 – Unimportant
C1P008: Hostile or passive attitude towards energy collaboration
  1 – Unimportant
C1P009: Information and Awareness barriers
C1P009: Insufficient information on the part of potential users and consumers
  4 – Important
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts
  1 – Unimportant
C1P009: Lack of awareness among authorities
  2 – Slightly important
C1P009: Information asymmetry causing power asymmetry of established actors
  1 – Unimportant
C1P009: High costs of design, material, construction, and installation
  4 – Important
C1P009: Any other Information and Awareness BARRIER
  1 – Unimportant
C1P010: Financial barriers
C1P010: Hidden costs
  1 – Unimportant
C1P010: Insufficient external financial support and funding for project activities
  1 – Unimportant
C1P010: Economic crisis
  3 – Moderately important
C1P010: Risk and uncertainty
  2 – Slightly important
C1P010: Lack of consolidated and tested business models
  1 – Unimportant
C1P010: Limited access to capital and cost disincentives
  1 – Unimportant
C1P010: Any other Financial BARRIER
  1 – Unimportant
C1P011: Market barriers
C1P011: Split incentives
  1 – Unimportant
C1P011: Energy price distortion
  1 – Unimportant
C1P011: Energy market concentration, gatekeeper actors (DSOs)
  2 – Slightly important
C1P011: Any other Market BARRIER
  1 – Unimportant