A1P001: Name of the PED case study / PED Lab
A1P001: Name of the PED case study / PED Lab
  BIPED
A1P002: Map / aerial view / photos / graphic details / leaflet
A1P002: Map / aerial view / photos / graphic details / leaflet
 

A1P003: Categorisation of the PED site
PED case study
 

  • PED case study

PED relevant case study
 

  • PED relevant case study

PED Lab.
 

  • PED Lab.

A1P004: Targets of the PED case study / PED Lab
Climate neutrality
 

  • Climate neutrality

Annual energy surplus
 

  • Annual energy surplus

Energy community
 

  • Energy community

Net-zero emission
 

  • Net-zero emission

A1P005: Phase of the PED case study / PED Lab
A1P005: Project Phase of your case study/PED Lab
  Planning Phase
A1P006: Start Date
A1P006: Start date
  01/24
A1P007: End Date
A1P007: End date
  12/26
A1P008: Reference Project
A1P008: Reference Project
 

  • 2766

A1P009: Data availability
A1P009: Data availability
 

  • Open data city platform – different dashboards
  • General statistical datasets
  • GIS open datasets

A1P010: Sources
Any publication, link to website, deliverable referring to the PED/PED Lab
 

  • https://www.bi-ped.eu

A1P011: Geographic coordinates
X Coordinate (longitude):
  56.159548445629206,
Y Coordinate (latitude):
  10.085032927282525
A1P012: Country
A1P012: Country
  Denmark
A1P013: City
A1P013: City
  Aarhus
A1P014: Climate Zone (Köppen Geiger classification)
A1P014: Climate Zone (Köppen Geiger classification).
  Cfb
A1P015: District boundary
A1P015: District boundary
  Geographic
A1P016: Ownership of the case study/PED Lab
A1P016: Ownership of the case study/PED Lab:
  Mixed
A1P017: Ownership of the land / physical infrastructure
A1P017: Ownership of the land / physical infrastructure:
  Single Owner
A1P021: Floor area ratio: Conditioned space / total ground area
A1P021: Floor area ratio: Conditioned space / total ground area
  0
A1P022: Financial schemes
A1P022i: Financing – RESEARCH FUNDING – EU
 

  • Financing – RESEARCH FUNDING – EU

A1P023: Economic Targets
A1P023: Economic Targets
 

  • Boosting local and sustainable production

Contact person for general enquiries
A1P026: Name
  Johanne Bräuner Nygaard Hansen
A1P027: Organization
  ITK, the city of Aarhus
A1P028: Affiliation
  Municipality / Public Bodies
A1P029: Email
  hjobr@aarhus.dk
Contact person for other special topics
Pursuant to the General Data Protection Regulation
  Yes
A2P001: Fields of application
A2P001: Fields of application
 

  • Energy efficiency
  • Energy flexibility
  • Digital technologies

A2P004: Appliances included in the calculation of the energy balance
A2P004: Appliances included in the calculation of the energy balance
  No
A2P005: Mobility included in the calculation of the energy balance
A2P005: Mobility included in the calculation of the energy balance
  Yes
A2P006: Description of how mobility is included (or not included) in the calculation
A2P006: Description of how mobility is included (or not included) in the calculation
  Not determined yet
A2P020: Share of RES on-site / RES outside the boundary
A2P020: Share of RES on-site / RES outside the boundary
  0
A3P001: Relevant city /national strategy
A3P001: Relevant city /national strategy
 

  • Smart cities strategies

B1P011: Population density before intervention
B1P011: Population density before intervention
  0
B1P012: Population density after intervention
B1P012: Population density after intervention
  0
B2P003: Scale of action
B2P003: Scale
  District
B2P007: Motivation for developing the PED Lab
B2P007: Motivation for developing the PED Lab
 

  • Strategic

B2P008: Lead partner that manages the PED Lab
B2P008: Lead partner that manages the PED Lab
  Research center/University
B2P009: Collaborative partners that participate in the PED Lab
B2P009: Collaborative partners that participate in the PED Lab
 

  • Academia
  • Private
  • Citizens, public, NGO

B2P015: Key Performance indicators
B2P015: Key Performance indicators
 

  • Energy
  • Environmental
  • Sustainability
  • Social
  • Economical / Financial

B2P019: Available tools
B2P019: Available tools
 

  • Energy modelling
  • Decision making models

C1P001: Unlocking Factors
C1P001: Recent technological improvements for on-site RES production
  1 – Unimportant
C1P001: Innovative, integrated, prefabricated packages for buildings envelope / Energy efficiency of building stock
  1 – Unimportant
C1P001: Energy Communities, P2P, Prosumers concepts
  1 – Unimportant
C1P001: Storage systems and E-mobility market penetration
  1 – Unimportant
C1P001: Decreasing costs of innovative materials
  1 – Unimportant
C1P001: Financial mechanisms to reduce costs and maximize benefits
  1 – Unimportant
C1P001: The ability to predict Multiple Benefits
  1 – Unimportant
C1P001: The ability to predict the distribution of benefits and impacts
  1 – Unimportant
C1P001: Citizens improved awareness and engagement on sustainable energy issues (bottom-up)
  1 – Unimportant
C1P001: Social acceptance (top-down)
  1 – Unimportant
C1P001: Improved local and national policy frameworks (i.e. incentives, laws etc.)
  1 – Unimportant
C1P001: Presence of integrated urban strategies and plans
  1 – Unimportant
C1P001: Multidisciplinary approaches available for systemic integration
  1 – Unimportant
C1P001: Availability of grants (from EC or other donors) to finance the PED Lab projects
  1 – Unimportant
C1P001: Availability of RES on site (Local RES)
  1 – Unimportant
C1P001: Ongoing or established collaboration on Public Private Partnership among key stakeholders
  1 – Unimportant
C1P001: Any other UNLOCKING FACTORS
  1 – Unimportant
C1P002: Driving Factors
C1P002: Climate Change adaptation need
  1 – Unimportant
C1P002: Climate Change mitigation need (local RES production and efficiency)
  1 – Unimportant
C1P002: Rapid urbanization trend and need of urban expansions
  1 – Unimportant
C1P002: Urban re-development of existing built environment
  1 – Unimportant
C1P002: Economic growth need
  1 – Unimportant
C1P002: Improved local environmental quality (air, noise, aesthetics, etc.)
  1 – Unimportant
C1P002: Territorial and market attractiveness
  1 – Unimportant
C1P002: Energy autonomy/independence
  1 – Unimportant
C1P002: Any other DRIVING FACTOR
  1 – Unimportant
C1P003: Administrative barriers
C1P003: Difficulty in the coordination of high number of partners and authorities
  1 – Unimportant
C1P003: Lack of good cooperation and acceptance among partners
  1 – Unimportant
C1P003: Lack of public participation
  1 – Unimportant
C1P003: Lack of institutions/mechanisms to disseminate information
  1 – Unimportant
C1P003:Long and complex procedures for authorization of project activities
  1 – Unimportant
C1P003: Time consuming requirements by EC or other donors concerning reporting and accountancy
  1 – Unimportant
C1P003: Complicated and non-comprehensive public procurement
  1 – Unimportant
C1P003: Fragmented and or complex ownership structure
  1 – Unimportant
C1P003: City administration & cross-sectoral attitude/approaches (silos)
  1 – Unimportant
C1P003: Lack of internal capacities to support energy transition
  1 – Unimportant
C1P003: Any other Administrative BARRIER
  1 – Unimportant
C1P004: Policy barriers
C1P004: Lack of long-term and consistent energy plans and policies
  1 – Unimportant
C1P004: Lacking or fragmented local political commitment and support on the long term
  1 – Unimportant
C1P004: Lack of Cooperation & support between national-regional-local entities
  1 – Unimportant
C1P004: Any other Political BARRIER
  1 – Unimportant
C1P005: Legal and Regulatory barriers
C1P005: Inadequate regulations for new technologies
  1 – Unimportant
C1P005: Regulatory instability
  1 – Unimportant
C1P005: Non-effective regulations
  1 – Unimportant
C1P005: Unfavorable local regulations for innovative technologies
  1 – Unimportant
C1P005: Building code and land-use planning hindering innovative technologies
  1 – Unimportant
C1P005: Insufficient or insecure financial incentives
  1 – Unimportant
C1P005: Unresolved privacy concerns and limiting nature of privacy protection regulation
  1 – Unimportant
C1P005: Shortage of proven and tested solutions and examples
  1 – Unimportant
C1P005: Any other Legal and Regulatory BARRIER
  1 – Unimportant
C1P007: Technical barriers
C1P007: Lack of skilled and trained personnel
  1 – Unimportant
C1P007: Deficient planning
  1 – Unimportant
C1P007: Retrofitting work in dwellings in occupied state
  1 – Unimportant
C1P007: Lack of well-defined process
  1 – Unimportant
C1P007: Inaccuracy in energy modelling and simulation
  1 – Unimportant
C1P007: Lack/cost of computational scalability
  1 – Unimportant
C1P007: Grid congestion, grid instability
  1 – Unimportant
C1P007: Negative effects of project intervention on the natural environment
  1 – Unimportant
C1P007: Energy retrofitting work in dense and/or historical urban environment
  1 – Unimportant
C1P007: Difficult definition of system boundaries
  1 – Unimportant
C1P007: Any other Thecnical BARRIER
  1 – Unimportant
C1P008: Social and Cultural barriers
C1P008: Inertia
  1 – Unimportant
C1P008: Lack of values and interest in energy optimization measurements
  1 – Unimportant
C1P008: Low acceptance of new projects and technologies
  1 – Unimportant
C1P008: Difficulty of finding and engaging relevant actors
  1 – Unimportant
C1P008: Lack of trust beyond social network
  1 – Unimportant
C1P008: Rebound effect
  1 – Unimportant
C1P008: Hostile or passive attitude towards environmentalism
  1 – Unimportant
C1P008: Exclusion of socially disadvantaged groups
  1 – Unimportant
C1P008: Non-energy issues are more important and urgent for actors
  1 – Unimportant
C1P008: Hostile or passive attitude towards energy collaboration
  1 – Unimportant
C1P008: Any other Social BARRIER
  1 – Unimportant
C1P009: Information and Awareness barriers
C1P009: Insufficient information on the part of potential users and consumers
  1 – Unimportant
C1P009: Perception of interventions as complicated and expensive, with negative socio-economic or environmental impacts
  1 – Unimportant
C1P009: Lack of awareness among authorities
  1 – Unimportant
C1P009: Information asymmetry causing power asymmetry of established actors
  1 – Unimportant
C1P009: High costs of design, material, construction, and installation
  1 – Unimportant
C1P009: Any other Information and Awareness BARRIER
  1 – Unimportant
C1P010: Financial barriers
C1P010: Hidden costs
  1 – Unimportant
C1P010: Insufficient external financial support and funding for project activities
  1 – Unimportant
C1P010: Economic crisis
  1 – Unimportant
C1P010: Risk and uncertainty
  1 – Unimportant
C1P010: Lack of consolidated and tested business models
  1 – Unimportant
C1P010: Limited access to capital and cost disincentives
  1 – Unimportant
C1P010: Any other Financial BARRIER
  1 – Unimportant
C1P011: Market barriers
C1P011: Split incentives
  1 – Unimportant
C1P011: Energy price distortion
  1 – Unimportant
C1P011: Energy market concentration, gatekeeper actors (DSOs)
  1 – Unimportant
C1P011: Any other Market BARRIER
  1 – Unimportant